Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 11231-11240 of 18863 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 211959 | Project ID: 211959 DEA: 051H3704 EFIS: 0516000066 | 05-SLO-58-0.0/0.7 | RESURFACE EXISTING ROADBED WITH RHMA-G. | SAN LUIS OBISPO COUNTY NEAR SANTA MARGARITA FROM ROUTE 101/58 SEPARATION TO WILHELMINA AVENUE | 01/04/2018 | 1 (12/29/2017) | Details CEM-3701 Report |
| 211960 | Project ID: 211960 DEA: 051H3904 | 05-SCL,SCR-35-R0.0/1.5 | RESURFACE PAVEMENT WITH RUBBERIZED HOT MIX ASPHALT (GAP GRADED). | SANTA CLARA AND SANTA CRUZ COUNTIES NEAR REDWOOD ESTATES FROM ROUTE 35/17 SEPARATION TO 0.1 MILE NORTH OF MARTY ROAD | 08/22/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 211961 | Project ID: 211961 DEA: 051H5004 EFIS: 0516000082 | 05-SB-246-26.3/28.6 | SLURRY SEAL AND REPAIR FAILED AREAS. | SANTA BARBARA COUNTY IN AND NEAR BUELLTON FROM ROUTE 101/246 SEPARATION TO BUELLFLAT ROCK ROAD | 08/22/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 211962 | Project ID: 211962 DEA: 060T7504 | 06-KER-155-R11.0/R17.7 | RHMA- GAP GRADED (BONDED WEARING COURSE) PAVING. | KERN COUNTY ABOUT 10 MILES EAST OF DELANO FROM ROUTE 65 TO 2.5 MILES EAST OF RAG GULCH BRIDGE | 04/16/2021 | 1 (01/09/2019) | Details CEM-3701 Report |
| 211963 | Project ID: 211963 DEA: 060V9704 | 06-FRE-5-53.0/60.0 | COLD PLANE AND RUBBERIZED HOT MIX ASPHALT (BONDED WEARING COURSE). | FRESNO COUNTY ABOUT 17 MILES WEST OF MENDOTA FROM 0.3 MILE NORTH OF RUSSELL AVENUE OVERCROSSING TO SHIELDS AVENUE OVERCROSSING | 07/31/2017 | 1 (07/31/2017) | Details CEM-3701 Report |
| 211964 | Project ID: 211964 DEA: 073W3704 | 07-LA-105-R2.2/R13.5 | REPLACE OH SIGN PANELS. | LOS ANGELES COUNTY AT VARIOUS LOCATIONS FROM ROUTE 105/405 SEPARATION TO ROUTE 105/710 SEPARATION | 08/23/2018 | 1 (10/10/2017) | Details CEM-3701 Report |
| 211965 | Project ID: 211965 DEA: 081F9504 | 08-RIV-10-29.6 | INSTALL HIGH FRICTION SURFACE TREATMENT. | RIVERSIDE COUNTY NEAR WHITEWATER AT WESTBOUND ROUTE 62 TO EASTBOUND ROUTE 10 CONNECTOR | 07/31/2018 | 1 (07/31/2018) | Details CEM-3701 Report |
| 211966 | Project ID: 211966 DEA: 081G7004 | 08-SBD-38-26.0/31.0 | REPAIR FIRE DAMAGE, EXISTING EMBANKMENT, AND DRAINAGE SYSTEM. | SAN BERNARDINO COUNTY NEAR BIG LAKE CITY FROM 0.5 MILE WEST OF GLASS ROAD TO 0.2 MILE EAST OF SEVEN OAKS ROAD. | 06/23/2021 | 1 (06/23/2021) | Details CEM-3701 Report |
| 211967 | Project ID: 211967 DEA: 101E8904 EFIS: 1016000093 | 10-SJ-5-26.5/27.0 | REPAIR BRIDGE CROSSFRAMES. | SAN JOAQUIN COUNTY IN STOCKTON AT STOCKTON CHANNEL VIADUCT | 01/24/2020 | 1 (07/24/2017) | Details CEM-3701 Report |
| 211968 | Project ID: 211968 DEA: 101F0804 EFIS: 1016000116 | 10-SJ-4,26-19.75,1.1 | HEAT STRAIGHTENING EXISTING STEEL GIRDERS. | SAN JOAQUIN COUNTY IN STOCKTON ON ROUTE 4 AT FARMINGTON ROAD OVERCROSSING AND ON ROUTE 26 AT ROUTE 26/99 SEPARATION. | 04/05/2018 | 1 (05/16/2017) | Details CEM-3701 Report |
