Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 11201-11210 of 18774 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 212307 | Project ID: 212307 DEA: 044J6004 EFIS: 0415000370 | 04-MRN-1,37&101-Var | PLACE POLYESTER CONCRETE AND REPLACE JOINT SEALS. | MARIN COUNTY AT VARIOUS LOCATIONS | 09/07/2022 | 1 (08/19/2019) | Details CEM-3701 Report |
| 212308 | Project ID: 212308 DEA: 051C6604 EFIS: 0512000186 | 05-MON-198-22.4/22.8 | WIDEN SHOULDER, RECONSTRUCT ROADWAY AND RESURFACE PAVEMENT WITH HMA. | MONTEREY COUNTY ABOUT 22 MILES EAST OF SAN LUCAS FROM 0.1 MILE WEST TO 0.3 MILE EAST OF NORTH FORK ROAD | 08/14/2018 | 1 (04/26/2017) | Details CEM-3701 Report |
| 212309 | Project ID: 212309 DEA: 06416014 EFIS: 0612000198 | 06-KIN-41-R40.6/R41.1 | INSTALL PLANTS AND IRRIGATION SYSTEM. | KINGS COUNTY IN LEMOORE FROM 0.3 MILE SOUTH OF BUSH STREET UNDERCROSSING TO 0.2 MILE NORTH OF BUSH STREET UNDERCROSSING | 04/14/2021 | 1 (10/27/2017) | Details CEM-3701 Report |
| 212310 | Project ID: 212310 DEA: 081F8704 | 08-RIV-15-23.8/33.4 | INSTALL RUMBLE STRIPS | RIVERSIDE COUNTY NEAR LAKE ELSINORE FROM NICHOLS ROAD OVERCROSSING TO TEMESCAL CANYON ROAD UNDERCROSSING | 08/16/2023 | 1 (06/24/2021) | Details CEM-3701 Report |
| 212311 | Project ID: 212311 DEA: 081G1104 EFIS: 0815000126 | 08-RIV-15-3.0/8.1 | PREVENTATIVE MAINTENANCE TREATMENT - OVERLAY | RIVERSIDE COUNTY IN TEMECULA AND MURRIETA FROM 0.4 MILE SOUTH OF ROUTE 15/79 SEPARATION TO 0.6 MILE SOUTH OF ROUTE 15/215 SEPARATION | 08/16/2023 | 1 (11/02/2017) | Details CEM-3701 Report |
| 212312 | Project ID: 212312 DEA: 100X9104 EFIS: 1013000041 | 10-SJ,TUO,STA-4,120,132-Var | MITIGATING SCOUR, PLACING ROCK SLOPE PROTECTION,AND REPAIRING | SAN JOAQUIN,STANISLAUS, AND TUOLUMNE COUNTIES AT VARIOUS LOCATIONS. | 04/30/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 212313 | Project ID: 212313 DEA: 11419114 EFIS: 1114000126 | 11-SD-5,54,94,805,905-Various | UPGRADE OH SIGNS, REMOVE SIGN ILLUMINATION, AND REPLACE SIGN FIXTURES. | SAN DIEGO COUNTY AT VARIOUS LOCATIONS | 12/17/2019 | 1 (05/10/2017) | Details CEM-3701 Report |
| 212314 | Project ID: 212314 DEA: 120Q1104 EFIS: 1216000089 | 12-ORA-57-15.6/22.5 | GRIND AND GROOVE EXIST CONC PVMT, SLAB REPLACEMENT. | ORANGE COUNTY FROM ROUTE 57/91 SEPARATION IN ANAHEIM TO LOS ANGELES COUNTY LINE IN BREA | 06/21/2021 | 1 (04/28/2017) | Details CEM-3701 Report |
| 212315 | Project ID: 212315 DEA: 120Q4104 EFIS: 1217000028 | 12-ORA-5-3.2/44.4 | REPLACE METER ON SIGNAL HEAD WITH NEW POLE AND FLASHING BEACON. | ORANGE COUNTY FROM ARTESIA AVENUE TO CAMINO DE ESTRELLA | 06/21/2021 | 1 (04/28/2017) | Details CEM-3701 Report |
| 212316 | Project ID: 212316 Permit Numbers: 1114NUJ0206 1116NRT0432 | 11--8-15.3/15.3 | enter upon State Highway right of way in San Diego County, City of El Cajon, on Route 8 post mile 15.31, to jack and bore to install a 60-inch steel casing for a 36-inch fiberglass sewer carrier pipe under Insterstate 8; trench to install 36-inch and 30-inch fiberglass sewer carrier pipes and const | INTERSTATE 8, EL CAJON | 08/16/2021 | 1 (05/11/2017) | Details CEM-3701 Report |
