Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 11191-11200 of 18774 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
211917Project ID: 211917
DEA: 06457114
EFIS: 0600020478
06-KER-14,178-58.2/62.3,88.3/88.9RECONSTRUCT HIGHWAY FROM 2-LANE CONVENTIONAL TO 4-LANE EXPRESSWAY.KERN COUNTY NEAR INDIAN WELLS ON ROUTE 14 FROM 2.4 MILES SOUTH OF JUNCTION ROUTE 178 TO 1.7 MILES NORTH OF JUNCTION ROUTE 178 AND ON ROUTE 178 FROM ROUTE 14 TO 0.6 MILE EAST OF ROUTE 1412/07/20181 (03/03/2017)Details CEM-3701 Report
211919Project ID: 211919
DEA: 100Y4504
EFIS: 1015000076
10-TUO-120-T24.6/28.8CONSTRUCT TURNOUTS WITH HOT MIX ASPHALT.TUOLUMNE COUNTY NEAR GROVELAND AT VARIOUS LOCATIONS FROM 0.7 MILE EAST OF ROUTE 49 TO 4.0 MILES EAST OF EAST RIVER ROAD04/18/2018NOT VERIFIEDDetails CEM-3701 Report
211922Project ID: 211922
Permit Numbers: 07166MC0756
07--1-47/47.4Intersection improvement includes: Add an additional left-turn lane, modify traffic signals & striping , new sidewalk, curb & gutter, remove raised median, upgrade curb rampsPCH, Malibu08/22/2018NOT VERIFIEDDetails CEM-3701 Report
211924Project ID: 211924
DEA: 040G6420
EFIS: 0413000350
04-MRN-1-001-28.51   1 (09/01/2016)Details CEM-3701 Report
211925Project ID: 211925
Permit Numbers: 08166MC0244
08--71-1.9/1.9Enter onto State Route 71(SR-71)right of way at Grand Avenue and Roswell Avenue, in the City of Chino, to do street improvement including cold plane and overlay asphalt concrete paving, new curb return, ADA ramp, curb and gutter, 5 feet wide sidewalk, a southbound right turn lane on Roswell Avenue,Roswell Avenue and SR-71 northbound ramps, Chino09/04/20181 (12/09/2016)Details CEM-3701 Report
211927Project ID: 211927
DEA: 051H7404
EFIS: 0516000147
05-SB,SBT-101-12.3/12.4Replace burned out HDPE Culvert 08/22/2018NOT VERIFIEDDetails CEM-3701 Report
211929Project ID: 211929
DEA: 030G3204
EFIS: 0315000072
03-NEV-20,49-VARMETHACRYLATE, POLYESTER OVERLAY, AND HMA OVERLAYNEVADA COUNTY AT VARIOUS LOCATIONS08/30/20181 (09/15/2017)Details CEM-3701 Report
211930Project ID: 211930
DEA: 030G6104
EFIS: 0315000250
03-YOL-84-10.9/13.3COLD IN-PLACE RECYCLING AND RHMA (GAP GRADED) OVERLAYYOLO COUNTY AT ARCADE FROM 0.3 MILE NORTH OF WILLOW POINT ROAD TO 1.5 MILES NORTH OF BABEL SLOUGH ROAD12/01/20171 (09/15/2017)Details CEM-3701 Report
211931Project ID: 211931
DEA: 043G6414
EFIS: 0416000348
04-NAP-29-37.0SCOUR REPLACE BRIDGENAPA COUNTY IN CALISTOGA AT NAPA RIVER BRIDGE04/22/20201 (02/15/2017)Details CEM-3701 Report
211932Project ID: 211932
DEA: 051F0304
EFIS: 0513000037
05-SCR,SBT-129-1.8/9.9,0.0/0.1COLD PLANE ASPHALT PAVEMENT, RESURFACE WITH HMA AND REPLACE GUARDRAIL.SANTA CRUZ AND SAN BENITO COUNTIES NEAR WATSONVILLE FROM 0.4 MILE EAST OF LAKEVIEW ROAD TO SCHOOL ROAD01/02/2019NOT VERIFIEDDetails CEM-3701 Report