Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 11151-11160 of 18863 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
212403Project ID: 212403
DEA: 033H1504
EFIS: 0317000236
03-YOL-16-1.5-1.7, 1.5/1.7Install 670 feet of soldier pile wallIn Yolo County on Route 16 approx. 1.2 miles west of the Colusa/Yolo County line.06/27/20221 (07/31/2017)Details CEM-3701 Report
4739Project ID: 4739
EFIS: 0000001155
Permit Numbers: 0807NTN0112 0808NRT0003 0808NRT0557 0807NRW1288 0808NRW0396
08-RIV-215-35.888INSTALL 66â ³ STEEL CASING TO HOUSE WATER LINE BY TUNNELING 12/30/20082 (12/30/2008)Details CEM-3701 Report
5075Project ID: 5075
DEA: 080M0104
MINOR: 08A1744
08-SBD-40-.8INSTALL 5000GALLON E85 FUEL TANK 09/07/2010NOT VERIFIEDDetails CEM-3701 Report
3726Project ID: 3726
DEA: 070P8004
MINOR: 07A2221
07-VEN-33-18.1/18.7INSTALL 5 SAFETY LUMINAIRES AT VARIOUS CROSSWALKS FROM CARILLO RD TO CHURH RD ALONG HWY 33 05/22/2012NOT VERIFIEDDetails CEM-3701 Report
4721Project ID: 4721
EFIS: 0000001155
Permit Numbers: 08076UB0903
08-RIV-91-11.69INSTALL 4â ³ TELEPHONE CONDUIT INSIDE THE DESIGNATED NEW BRIDGE CELL 01/31/20092 (01/31/2009)Details CEM-3701 Report
213909Project ID: 213909
Permit Numbers: 0618NTN0211 06196DP0068 0618NRT0988 0619NRT0152
06-FRE-145-23.67Install 4-72" Rubber Gasket Reinforced Concrete Pipe (RGRCP) crossing under State Route 145 using Bore and Jack method (as shown on the attached plans). The bore and receiving pits are located outside the State Right of Way.Floral Av, Helm11/30/00-11 (03/12/2019)Details CEM-3701 Report
7385Project ID: 7385
DEA: 010C3404
EFIS: 0112000252
01-MEN-1-8.09Install 4" Drainage Culvert, Replace Headwall and Endwall, RSP1.2 mile north of Signal Port Creek Rd01/02/20151 (04/16/2012)Details CEM-3701 Report
1712Project ID: 1712
DEA: 040F5104
MINOR: 04A3256
04-SF-35-2.3/2.8Install 4 Vehicle Speed Feedback Sign 06/08/2011NOT VERIFIEDDetails CEM-3701 Report
7795Project ID: 7795
DEA: 100X9504
EFIS: 1013000052
10-MER-5-21.7/23.7Install 3" Water LineNear Santa Nella on Interstate 5 from Rte 33/1-5 Separation to WIM Truck Scales07/28/20211 (10/10/2012)Details CEM-3701 Report
212217Project ID: 212217
DEA: 033H0304
EFIS: 0317000219
03-SIE-49-2.41/2.61install 3 soldier pile walls 12/22/20201 (03/17/2017)Details CEM-3701 Report