Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 11151-11160 of 18774 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 215367 | Project ID: 215367 DEA: 021J4904 EFIS: 0220000084 | 02-TEH-32-14.0/20.0 | PLACE HOT MIX ASPHALT (TYPE A). | TEHAMA COUNTY ABOUT 28 MILES EAST OF FOREST RANCH FROM 1.1 MILES EAST OF DEER CREEK BRIDGE NO. 08-0068 TO 0.4 MILE WEST OF SLATE CREEK BRIDGE NO. 08-0154 | 04/11/2024 | 1 (12/24/2020) | Details CEM-3701 Report |
| 215483 | Project ID: 215483 DEA: 022J0004 EFIS: 0221000017 | 02-PLU-49-0.0/7.5 | PLACE HOT MIX ASPHALT (TYPE A). | PLUMAS COUNTY AT AND NEAR VINTON FROM SIERRA COUNTY LINE TO ROUTE 70 | 11/24/2021 | 1 (03/08/2021) | Details CEM-3701 Report |
| 5443 | Project ID: 5443 DEA: 09343204 EFIS: 0900020026 | 09-MNO-182,395-0.0/6.5,65.1/77.0 | PLACE HOT MIX ASPHALT (WITH WARM MIX ADDITIVE) OVERLAY. | MONO COUNTY AT VARIOUS LOCATIONS | 11/26/2013 | 1 (04/25/2011) | Details CEM-3701 Report |
| 214326 | Project ID: 214326 DEA: 07310404 EFIS: 0715000001 | 07-LA-138-0.0/36.9 | PLACE HOT MIX ASPHALT AND COLD PLANE ASPHALT CONCRETE PAVEMENT. (EPD Pilot Project) | LOS ANGELES COUNTY FROM ROUTE 5/138 SEPARATION TO ROUTE 138/14 SEPARATION | 03/29/2024 | 1 (10/29/2019) | Details CEM-3701 Report |
| 209915 | Project ID: 209915 DEA: 060Q2704 EFIS: 0613000050 | 06-FRE-5-48.8/53.0 | PLACE HOT MIX ASPHALT AND CONTINUOUSLY REINFORCED CONCRETE PAVEMENT. | FRESNO COUNTY ABOUT 38 MILES SOUTH OF SANTA NELLA FROM 0.1 MILE SOUTH OF PANOCHE ROAD OVERCROSSING TO 0.2 MILE NORTH OF RUSSELL AVENUE OVERCROSSING. | 08/24/2018 | 1 (12/29/2014) | Details CEM-3701 Report |
| 212872 | Project ID: 212872 DEA: 07302204 EFIS: 0713000481 | 07-VEN-126-0.0/R13.6 | PLACE HOT MIX ASPHALT AND INDIVIDUAL SLAB REPLACEMENT. | VENTURA COUNTY IN VENTURA AND SANTA PAULA FROM ROUTE 126/101 SEPARATION TO HAUN CREEK BRIDGE | 05/26/2022 | 1 (04/27/2020) | Details CEM-3701 Report |
| 214728 | Project ID: 214728 DEA: 033H6404 EFIS: 0318000026 | 03-NEV-49-2.0/2.5 | PLACE HOT MIX ASPHALT AND MODIFYING SIGNAL AND LIGHTING SYSTEM. | NEVADA COUNTY AT HIGGINS CORNER FROM 0.20 MILE SOUTH OF WOLF ROAD/COMBIE ROAD TO 0.30 MILE NORTH OF WOLF ROAD/COMBIE ROAD | 09/28/2021 | 1 (03/24/2020) | Details CEM-3701 Report |
| 211065 | Project ID: 211065 DEA: 060T5804 EFIS: 0615000154 | 06-FRE,MAD-145-40.2/R41.2,R0.0/2.0,11.0/13.6 | PLACE HOT MIX ASPHALT AND REPAIR FAILED AREAS. | IN FRESNO AND MADERA COUNTIES NEAR MADERA FROM W. SHAW AVENUE TOAVENUE 7 AND FROM TOZER STREET TO RIVER ROAD | 02/21/2017 | 1 (10/04/2016) | Details CEM-3701 Report |
| 5609 | Project ID: 5609 DEA: 100L6304 | 10-SJ,STA-99-R24.3/R24.8,0.0/1.7 | PLACE HOT MIX ASPHALT AND UPGRADE MEDIAN BARRIER | 12/27/2012 | 1 (10/05/2009) | Details CEM-3701 Report | |
| 3725 | Project ID: 3725 DEA: 070P7904 | 07-LA-5-16.6 | PLACE HOT MIX ASPHALT AND UPGRADE SAFETY DEVICES | 07/29/2010 | 1 (07/29/2010) | Details CEM-3701 Report |
