Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 11151-11160 of 18863 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 210292 | Project ID: 210292 DEA: 044G5404 COOP: 042549 | 04-NAP-29- | Install two (2) separate roundabouts at the intersections | At the intersections of 1st Street/California Boulevard and 2nd Street/California Boulevard (City Roundabouts) and another roundabout at the State Route 29 northbound on and off-ramps and 1st Street intersection (Caltrans Roundabout). | 09/26/2022 | 2 (08/19/2019) | Details CEM-3701 Report |
| 209565 | Project ID: 209565 DEA: 060P6704 EFIS: 0612000201 COOP: 061589 | 06-TUL-245-7.1/7.24 | Construction of roundabout | At the intersection of State Rte. 245 and 216 , in the City of Woodlake | 08/06/2015 | 2 (12/26/2014) | Details CEM-3701 Report |
| 208894 | Project ID: 208894 DEA: 041G5404 EFIS: 0400020033 COOP: 042431 | 04-SM-82-17.08 | INSTALLATION OF TRAFFIC SIGNALS | AT THE INTERSECTION OF STATE ROUTE 82 AND MILLWOOD DRIVE IN THE CITY OF MILLBRAE | 08/22/2018 | 1 (06/17/2015) | Details CEM-3701 Report |
| 6960 | Project ID: 6960 DEA: 042L3604 EFIS: 0400000873 MINOR: 04A3710 | 04-SON-116-31.1/31.6 | Install safety street lighting | At the intersection of State Route 116 and Llano Road in Sonoma County. | 06/08/2020 | 1 (10/30/2019) | Details CEM-3701 Report |
| 1001332 | Project ID: 1001332 Permit Numbers: 0424NCS0875 | 04-ALA-238-15.03 | Construct street Improvements to enhance bicycle and pedestrian safety within State right-of-way, on State Highway 04-ALA-238, Post Mile 15.03, in Alameda County. | At the Intersection of SR238 Eastbound On- and Off Ramps and E. Lewelling Blvd | 1 (06/24/2025) | Details CEM-3701 Report | |
| 966 | Project ID: 966 DEA: 031F6104 EFIS: 0300020030 | 03-PLA-80-6.1 | Replace a Type 15 light/signal pole with one Type 15 pole and one Type 1B pole | At the intersection of Rocklin Road and WB I-80 Off ramp/Onramp | 12/04/2017 | 1 (10/21/2010) | Details CEM-3701 Report |
| 7548 | Project ID: 7548 DEA: 100G3804 EFIS: 1000000044 MINOR: 10A1439 | 10-AMA-104-5.9 | RECONSTRUCT THE CURB AND SIDEWALK | AT THE INTERSECTION OF PRESTON AVENUE AND MAIN STREET ON STATE ROUTE 104 | 12/05/2019 | 1 (01/06/2014) | Details CEM-3701 Report |
| 7960 | Project ID: 7960 DEA: 041F2404 EFIS: 0400020018 MINOR: 04A3911 | 04-SM-101-21.4 | Remove two type 1B traffic signal poles and a lighting Standard pole Type 21. Install a new standard pole (type 17-3-100 sma 30' ima 12' with two 3 phase traffic signals) | At the intersection of north bound on ramp to highway 101 and South Airport Blvd in San Bruno, California | 04/01/2013 | 1 (01/10/2013) | Details CEM-3701 Report |
| 995544 | Project ID: 995544 Permit Numbers: 0722NMC4045 | 07-LA-405-23.35 | Full traffic signal modification, including new signal poles and equipment, signal cabinet, conduit and conductors. | At the intersection of La Cienega Boulevard and Manchester Boulevard. | 06/28/2024 | 1 (12/19/2023) | Details CEM-3701 Report |
| 7388 | Project ID: 7388 DEA: 120L4404 EFIS: 1200020184 MINOR: 12A1397 | 12-ORA-5- | Install Traffic Signal System and crosswalks | At the intersection of El Camino Real and northbound I-5 on/off ramp. | 09/30/2013 | NOT VERIFIED | Details CEM-3701 Report |
