Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 11111-11120 of 18774 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 4770 | Project ID: 4770 EFIS: 0000001155 Permit Numbers: 0808NSN0925 | 08-SBd-62-8.76/9.29 | INSTALL A TRAFFIC SIGNAL AND OTHER ROAD IMPROVEMENT | 12/28/2010 | NOT VERIFIED | Details CEM-3701 Report | |
| 1874 | Project ID: 1874 DEA: 041A6204 EFIS: 0400000498 | 04-SON-12,121-41.2/41.3,7.4/7.6 | INSTALL A TRAFFIC SIGNAL & REALIGN THE ROUTE 12 APPROACH. | SONOMA COUNTY AT SCHELLVILLE ON ROUTE 12 FROM 0.6 MILE SOUTH OF SAN LUIS ROAD TO 0.3 MILE WEST OF MILLERCK ROAD ON ROUTE 121 AND 0.2 MILE WEST OF EAST EIGHTH STREET ON ROUTE 12/121 JUNCTION | 05/09/2014 | 1 (07/25/2011) | Details CEM-3701 Report |
| 993455 | Project ID: 993455 Permit Numbers: 05206MC0796 05216RT0770 | 05---67.93/-1 | Install a Traffic Monitoring Station on the shoulder, including loops in the NB and SB travel way | 24200 Cabrillo Highway , Monterey | 1 (05/09/2024) | Details CEM-3701 Report | |
| 993877 | Project ID: 993877 EFIS: 0000020505 Permit Numbers: 07216CD2109 | 07-LA-138-51.406 | Install a Right-Turn Pocket and new commercial driveway along south side of Fort Tejon, construct curb and gutter approximately 1,500' north of Pearblossom Blvd, Install an eastbound overlap phase to the existing traffic signal at the Fort Tejon and Pearblossom Boulevard intersection on CA-138 ( | FORT TEJON AND PEARBLOSSOM, PALMDALE | 07/14/2023 | 1 (10/06/2022) | Details CEM-3701 Report |
| 993748 | Project ID: 993748 DEA: 074P9904 EFIS: 0720000184 | 07-VEN-101-14.5 | INSTALL A REINFORCED CONCRETE BOX (RCB) AND REPAIR ERODED SLOPE. | VENTURA COUNTY IN CAMARILLO AT 0.3 MILE SOUTH OF CARMEN DRIVE OVERCROSSING | 1 (05/11/2022) | Details CEM-3701 Report | |
| 813 | Project ID: 813 DEA: 030AA034 EFIS: 0300020150 MINOR: 03A1788 | 03-PLA-- | Install a photo voltaic solar panel system at the Auburn Maintenance Station. | Auburn Maintenance Station. | 12/08/2017 | 2 (11/21/2014) | Details CEM-3701 Report |
| 211094 | Project ID: 211094 DEA: 031H3304 EFIS: 0316000110 | 03-BUT-32-8.1 | Install a pedestrian-activated traffic signal | 04/01/2021 | 1 (10/19/2016) | Details CEM-3701 Report | |
| 995506 | Project ID: 995506 EFIS: 1121000254 | 11-SD-- | Install a pedestrian staggered mid-block crosswalk (z-crossing) with pedestrian hybrid beacon to connect pedestrians and bicyclists to the east and west sides of El Camino Real. | NOT VERIFIED | Details CEM-3701 Report | ||
| 213661 | Project ID: 213661 Permit Numbers: 04176SN1102 04186DP1813 0418NRW2706 | 04---1.78/1.78 | Install a new signal as part of a new building at the intersection of San Pablo Avenue and 67th Street. The work will include installation of a new controller cabinet, service cabinet, traffic signal poles and equipment, conduits, detector loops, emergency vehicle preemption equipment. | San pablo Avenue, Oakland | 10/22/2019 | 1 (10/01/2018) | Details CEM-3701 Report |
| 4878 | Project ID: 4878 DEA: 080F2204 MINOR: 08A1782 | 08-SBD-210-R25.8/26.0 | INSTALL A GRATED LINE DRAIN ALONG THE RIGHT SHOULDER AND TIE IT INTO EXISTING DRAINAGE INLET ON EASTBOUND STATE ROUTE 210 IN THE CITY OF SAN BERNARDINO | 01/11/2011 | NOT VERIFIED | Details CEM-3701 Report |
