Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 11111-11120 of 18774 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
4770Project ID: 4770
EFIS: 0000001155
Permit Numbers: 0808NSN0925
08-SBd-62-8.76/9.29INSTALL A TRAFFIC SIGNAL AND OTHER ROAD IMPROVEMENT 12/28/2010NOT VERIFIEDDetails CEM-3701 Report
1874Project ID: 1874
DEA: 041A6204
EFIS: 0400000498
04-SON-12,121-41.2/41.3,7.4/7.6INSTALL A TRAFFIC SIGNAL & REALIGN THE ROUTE 12 APPROACH.SONOMA COUNTY AT SCHELLVILLE ON ROUTE 12 FROM 0.6 MILE SOUTH OF SAN LUIS ROAD TO 0.3 MILE WEST OF MILLERCK ROAD ON ROUTE 121 AND 0.2 MILE WEST OF EAST EIGHTH STREET ON ROUTE 12/121 JUNCTION05/09/20141 (07/25/2011)Details CEM-3701 Report
993455Project ID: 993455
Permit Numbers: 05206MC0796 05216RT0770
05---67.93/-1Install a Traffic Monitoring Station on the shoulder, including loops in the NB and SB travel way24200 Cabrillo Highway , Monterey 1 (05/09/2024)Details CEM-3701 Report
993877Project ID: 993877
EFIS: 0000020505
Permit Numbers: 07216CD2109
07-LA-138-51.406Install a Right-Turn Pocket and new commercial driveway along south side of Fort Tejon, construct curb and gutter approximately 1,500' north of Pearblossom Blvd, Install an eastbound overlap phase to the existing traffic signal at the Fort Tejon and Pearblossom Boulevard intersection on CA-138 (FORT TEJON AND PEARBLOSSOM, PALMDALE07/14/20231 (10/06/2022)Details CEM-3701 Report
993748Project ID: 993748
DEA: 074P9904
EFIS: 0720000184
07-VEN-101-14.5INSTALL A REINFORCED CONCRETE BOX (RCB) AND REPAIR ERODED SLOPE.VENTURA COUNTY IN CAMARILLO AT 0.3 MILE SOUTH OF CARMEN DRIVE OVERCROSSING 1 (05/11/2022)Details CEM-3701 Report
813Project ID: 813
DEA: 030AA034
EFIS: 0300020150
MINOR: 03A1788
03-PLA--Install a photo voltaic solar panel system at the Auburn Maintenance Station.Auburn Maintenance Station.12/08/20172 (11/21/2014)Details CEM-3701 Report
211094Project ID: 211094
DEA: 031H3304
EFIS: 0316000110
03-BUT-32-8.1Install a pedestrian-activated traffic signal 04/01/20211 (10/19/2016)Details CEM-3701 Report
995506Project ID: 995506
EFIS: 1121000254
11-SD--Install a pedestrian staggered mid-block crosswalk (z-crossing) with pedestrian hybrid beacon to connect pedestrians and bicyclists to the east and west sides of El Camino Real.  NOT VERIFIEDDetails CEM-3701 Report
213661Project ID: 213661
Permit Numbers: 04176SN1102 04186DP1813 0418NRW2706
04---1.78/1.78Install a new signal as part of a new building at the intersection of San Pablo Avenue and 67th Street. The work will include installation of a new controller cabinet, service cabinet, traffic signal poles and equipment, conduits, detector loops, emergency vehicle preemption equipment.San pablo Avenue, Oakland10/22/20191 (10/01/2018)Details CEM-3701 Report
4878Project ID: 4878
DEA: 080F2204
MINOR: 08A1782
08-SBD-210-R25.8/26.0INSTALL A GRATED LINE DRAIN ALONG THE RIGHT SHOULDER AND TIE IT INTO EXISTING DRAINAGE INLET ON EASTBOUND STATE ROUTE 210 IN THE CITY OF SAN BERNARDINO01/11/2011NOT VERIFIEDDetails CEM-3701 Report