Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 1101-1110 of 18878 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 213797 | Project ID: 213797 DEA: 060W6604 EFIS: 0617000247 COOP: 061655 | 06-MAD-99,17- | LOVE'S TRUCK STOP - Northbound Off Ramp Improvements | SR 99 & Avenue 17 | 08/17/2021 | NOT VERIFIED | Details CEM-3701 Report |
| 208984 | Project ID: 208984 EFIS: 1000020586 MINOR: 10A1544 | 10-SJ-88-12.2/12.5 | Improve Truck Turn Radius and Widen Shoulder | SR 88/SJ 12 Intersection Near Lodi, PM 12.24 | 12/06/2019 | 1 (07/15/2013) | Details CEM-3701 Report |
| 209828 | Project ID: 209828 Permit Numbers: 10146SN0391 10146DP0393 10146DP0401 | 10-AMA-88-22.7/22.7 | Modify existing signal loop and flasher cabinet. | SR 88, Pine Grove | 08/24/2018 | 1 (08/22/2014) | Details CEM-3701 Report |
| 213667 | Project ID: 213667 Permit Numbers: 0415NSN1717 04176DP1145 0417NRT1013 | 04-SM-84-24.2/23.3 | At woodside (SR 84) Hudson,removal of existing ped push buttons and replacement with APS ped push buttons. | SR 84 at Hudson ,SR 84 at Hess, Redwood City | 01/22/2020 | 1 (10/02/2018) | Details CEM-3701 Report |
| 210846 | Project ID: 210846 DEA: 044H1504 EFIS: 0413000105 Permit Numbers: 0414NMC2543 04156DP1531 | 04-SM-82-6.1/6.1 | The project will upgrades sidewalk,crosswalk,median,landscaping,lighting and pedestrian signal along El Camino Real (Route 82)from 500' north of and 200' south of Arroyo Ave in the Cityt of San Carlos. | SR 82 (El Camino Real), San Carlos | 08/22/2018 | 1 (10/01/2015) | Details CEM-3701 Report |
| 211132 | Project ID: 211132 Permit Numbers: 10156MC0300 | 10-SJ-580-13.4 | Install new traffic signals at Interstate 580/Patterson Pass Road Intersection and Interstate 580/Mountain House Parkway intersection in the City of Tracy. Work includes right turn lane and approach taper at I-580/Patterson Pass Road eastbound onramp and shoulder widening on I-580/Mountain House Pa | SR 580, Tracy | 1 (01/22/2016) | Details CEM-3701 Report | |
| 213916 | Project ID: 213916 DEA: 06484664 EFIS: 0618000213 COOP: 061681 | 06-KER-58,99-R52.1/R52.5 | RT 58/99 BAKERSFIELD FREEWAY CONNECTOR -widening the existing SR 58/SR 99 grade separation structure and realigning the Westbound to Southbound loop connector. Auxiliary lane and collector-distributor lanes on Southbound SR 99. | SR 58/SR 99 | 2 (03/12/2021) | Details CEM-3701 Report | |
| 209333 | Project ID: 209333 Permit Numbers: 06136DP0853 0613NMC0491 | 06-KER-58-50.61/50.61 | ADD CONTRACTORS TO THE CITY OF BAKERSFIELD PERMIT 0613-NMC-0491.Contractor Name Address Telephone Number Contact NameGranite Construction Company 3005 James RoadBakersfield, CA 93308 (661) 477-9774 Aaron YeomansPavement Recycling Systems P. O. Box 1266Riv | SR 58, Bakersfield | 08/27/2018 | 1 (12/22/2014) | Details CEM-3701 Report |
| 757 | Project ID: 757 Permit Numbers: 0306NSN0667 | 03-ED-50-6.4/6.6 | Signal-New / Modify | sr 50 WB on/off ramp/cameron Park Dr., El Dorado Hills | 09/17/2014 | NOT VERIFIED | Details CEM-3701 Report |
| 209184 | Project ID: 209184 DEA: 031E2904 EFIS: 0300000258 Permit Numbers: 0313NMC0522 | 03-ED-US 50-1.02/2.4 | Construct New Silva Valley Parkway interchange | SR 50 between the El Dorado Hills Boulevard/Latrobe Road interchange and the Bass Lake Road interchange, just east of the Clarksville Undercrossing along the existing Sylva Valley Parkway | 12/05/2017 | 1 (12/19/2013) | Details CEM-3701 Report |
