Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 11041-11050 of 18774 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
208933Project ID: 208933
DEA: 042G5104
EFIS: 0412000203
COOP: 042495
04-CC-4,160-Constructor a freeway to freeway connector in each directionBetween State Route (SR) 4 and the SR 160 in Antioch05/07/20192 (08/21/2013)Details CEM-3701 Report
6408Project ID: 6408
Permit Numbers: 1204NMC0530
12-ORA-133-4.2-8.1Reduce and re-contour two existing stockpiles (Sta 399+25 to 402+30 and Sta 475+80 to 486+25)along the median of Laguna Canyon Rd between SR-73 and I-405. This item will remove approximately 29,650 CY of soil. 2. Remove pile of boulders at Median StockpileBetween SR-73 and I-40509/08/2016NOT VERIFIEDDetails CEM-3701 Report
4222Project ID: 4222
DEA: 073P2304
EFIS: 0700020011
07-LA-405-21.6INSTALLATION OF CHAIN LINK RAILING ON TYPE 28 CONCRETE BARRIER AND CHEVRON SIGNS WITH J POSTS ON THE RIGHTHAND SIDE OF THE FREEWAY CONNECTORBETWEEN SOUTHBOUND LA 405 TO EASTBOUND LA 105 IN LOS ANGELES COUNTY 1 (12/14/2012)Details CEM-3701 Report
210077Project ID: 210077
DEA: 043G9204
EFIS: 0414000507
COOP: 042565
04-ALA-880-9.5/10.0Conversion of HOV Lanes to Express Lanes on I-880 ; Installation of the necessary Backhaul Communicaiton Network from Rte 237 to Hegenberger RoadBetween Rte 237 and Lewelling Road and I-880 SB between Rte 237 and Hegenberger Road.02/10/20212 (09/20/2017)Details CEM-3701 Report
210133Project ID: 210133
DEA: 120P2404
EFIS: 1215000055
12-ORA-5,005-15.89, 15.9Repair failed and collapsed roadway slope embankment and remove standing rainwaterbetween Oso Parkway and La Paz Road09/09/2016NOT VERIFIEDDetails CEM-3701 Report
210160Project ID: 210160
DEA: 101E2204
EFIS: 1015000011
COOP: 10439
10-SJ-580-13.3/13.8Widen existing road under I-580 to accommodate ramp widening and additional left turn lanes . Proposes to replace existing two lane bridge over the adjacent California Aqueduct on the east side of the Interchange and add two additional lanesBetween I-580 and Old Schulte Road 2 (01/30/2015)Details CEM-3701 Report
213971Project ID: 213971
DEA: 060Y2304
EFIS: 0619000103
COOP: 061697
06-FRE-180-R9.0/R23.5Alignment of Route 180Between I-5 and Route 33 (Mendota) 1 (06/14/2019)Details CEM-3701 Report
4365Project ID: 4365
DEA: 074L2404
07-VEN-150-22.5REBUILD ROADBED SLOPE W/ROCK SLOPE PROTECTBETWEEN CITIES OF OJAI & SANTA PAULA 6 LOCOF FAILED ROADBED SUPPORT AT POST MILES:22.52,22.59,22.62,22.80,23.52 AND 23.71 DIR'S EMERGENCY F.A. CONTRACT08/10/20101 (08/10/2010)Details CEM-3701 Report
208713Project ID: 208713
DEA: 043A7754
EFIS: 0400002042
COOP: 042301
04-ALA-80-1.90/8.00, 0.0/13.5Variable speed limit signs, variable/changeable message signs, dynamic message signs and lane use signalsBetween Carquinez Bridge to San Francisco-Oakland Bay Bridge.07/12/20191 (03/22/2013)Details CEM-3701 Report
994317Project ID: 994317
DEA: 040K0304
EFIS: 0416000016
COOP: 042808
04-SCL-680-1.4/2.3THIS PROJECT WILL CONSTRUCT SOUNDWALLS ALONG INTERSTATE 680 (I-680)BETWEEN CAPITOL EXPRESSWAY AND MUELLER AVENUE IN SAN JOSE. 2 (10/06/2022)Details CEM-3701 Report