Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 11011-11020 of 18863 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 208613 | Project ID: 208613 DEA: 034M5304 | 03-BUT-99-13.0/20.6 | PAVEMENT REHABILITATION | BUTTE COUNTY ABOUT 10 MILES NORTH OF GRIDLEY FROM 0.2 MILE SOUTH OF NORTH JUNCTION ROUTE 162 TO DRY CREEK BRIDGE | 10/08/2014 | 1 (10/08/2014) | Details CEM-3701 Report |
| 994556 | Project ID: 994556 DEA: 032G7604 EFIS: 0322000155 | 03-BUT-162-22.7/26.9,30.1/31.1 | HMA (TYPE A), ROADWAY EXCAVATION, AND CLASS 2 AB. | BUTTE COUNTY 4.7 MILES EAST OF OROVILLE FROM SADDLE DRIVE TO MIDDLE FORK FEATHER RIVER BRIDGE AND FROM CANYON CREEK BRIDGE TO FOREMAN CREEK ROAD | 05/09/2024 | 1 (05/15/2023) | Details CEM-3701 Report |
| 213059 | Project ID: 213059 DEA: 023H2204 EFIS: 0217000071 | 02-TEH,BUT-32-0.0/2.7,D2.7/D4.7,4.7/5.0 | PLACE HMA OVERLAY, SHOULDER BACKING, GUARDRAIL & REPLACE AC SURFACING. | BUTTE AND TEHAMA COUNTIES FROM BUTTE COUNTY LINE TO 1.6 MILES EAST OF SODA SPRINGS ROAD | 01/08/2019 | 1 (03/05/2018) | Details CEM-3701 Report |
| 958 | Project ID: 958 DEA: 031F3704 | 03-BUT,SUT-99-Var | COLD PLANE AC PAVEMENT, PLACE HMA AND RWMA-O SURFACING, UPGRADE MBGR. | BUTTE AND SUTTER COUNTIES AT VARIOUS LOCATIONS | 12/17/2012 | 1 (10/18/2010) | Details CEM-3701 Report |
| 211815 | Project ID: 211815 DEA: 031F9704 EFIS: 0300020469 | 03-SUT,BUT-99-Var | ITS AND OPERATIONAL IMPROVEMENTS. | BUTTE AND SUTTER COUNTIES AT VARIOUS LOCATIONS | 08/30/2018 | 1 (10/20/2016) | Details CEM-3701 Report |
| 210126 | Project ID: 210126 DEA: 034F1304 EFIS: 0314000040 | 03-SAC,BUT-5,50,51,80,99,191-VAR | PLACE HIGH FRICTION SURFACE TREATMENT | BUTTE AND SACRAMENTO COUNTIES AT VARIOUS LOCATIONS | 11/03/2016 | 1 (02/05/2015) | Details CEM-3701 Report |
| 213044 | Project ID: 213044 DEA: 020H0304 | 02-BUT,PLU-70-40.2/47.9,13.1 | UPGRADE DRAINAGE SYSTEMS | BUTTE AND PLUMAS COUNTIES AT VARIOUS LOCATIONS | 01/08/2019 | NOT VERIFIED | Details CEM-3701 Report |
| 861 | Project ID: 861 DEA: 030F5304 | 03-BUT,PLA-191,193-7.4/8.7,7.8/8.0 | AC PAVEMENT TO BE COLD PLANED AND OPEN GRADED HMA TO BE PLACED | BUTTE AND PLACER COUNTIES ON ROUTE 191 FROM 2.6 MILES NORTH OF CLEAR CREEK CEMETERY ROAD TO AIRPORT WAY AND ON ROUTE 193 FROM 1.2 MILES EAST OF WHITTINGTON DRIVE TO SUMMER STAR WAY | 10/21/2010 | 1 (06/07/2010) | Details CEM-3701 Report |
| 1203 | Project ID: 1203 DEA: 033M3304 | 03-BUT,GLE-32,99-var | Bridge deck overlay to be placed on 5 structures | BUTTE AND GLENN COUNTIES AT VARIOUS LOCATIONS | 08/31/2011 | 1 (08/31/2011) | Details CEM-3701 Report |
| 212257 | Project ID: 212257 DEA: 032F0704 EFIS: 0300020457 | 03-BUT,GLE-5,99,162-VAR | UPGRADE OVERHEAD SIGNS | BUTTE AND GLENN COUNTIES AT VARIOUS LOCATIONS | 04/23/2021 | 1 (09/15/2017) | Details CEM-3701 Report |
