Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 10981-10990 of 18774 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 22223 | Project ID: 22223 DEA: AML-EPD EFIS: AML-EPD | 59--- | Special project for submitting EPD data for inclusion on the Authorized Material List (AML). | NOT VERIFIED | Details CEM-3701 Report | ||
| 22222 | Project ID: 22222 DEA: MAINTENANCE EFIS: MAINTENANCE | 59--- | Special project for materials used in maintenance projects. | NOT VERIFIED | Details CEM-3701 Report | ||
| 10058 | Project ID: 10058 DEA: 060P3504 EFIS: 0612000148 MINOR: 06A1824 | 06-TUL-198- | INSTALL RUMBLE STRIP AND CRASH CUSHION | IN TULARE COUNTY NEAR VISALIA FROM 0.5 MILE EAST OF ROAD 68 TO 0.6 MILE WEST OF ROAD 80 OVERCROSSING | 10/19/2020 | 1 (12/22/2014) | Details CEM-3701 Report |
| 10057 | Project ID: 10057 DEA: 051A9304 EFIS: 0512000042 | 05-SBT-101-.7 | Stabilize and Reconstruct Slope | Near Prunedale at .2 mile north of Cole Rd | 08/27/2018 | 1 (01/04/2016) | Details CEM-3701 Report |
| 10056 | Project ID: 10056 DEA: 060P3404 EFIS: 0612000147 MINOR: 06A1823 | 06-KER-99-L0.0/0.1 | Construct Rumble Strips and Modify Vehicle Classification Station | IN KERN COUNTY NEAR WHEELER RIDGE FROM 1.5 MILES NORTH OF WHEELER RIDGE OVERCROSSING TO 0.1 MILES NORTH OF ROUTE 5/99 SEPARATION | 10/19/2020 | 1 (12/22/2014) | Details CEM-3701 Report |
| 10055 | Project ID: 10055 DEA: 010C8604 EFIS: 0113000068 | 01-MEN-1-37.33 | Repair Slip out | In Mendocino County near Elk at 1.5 miles south of Navarro Bridge Road 517a | 07/19/2013 | 1 (03/28/2013) | Details CEM-3701 Report |
| 10054 | Project ID: 10054 DEA: 120M0304 EFIS: 1200020273 MINOR: 12A1451 | 12-ORA-91-3.6 | INSTALL FLASHING BEACONS AND REFRESH PAVEMENT DELINEATION | ON CONNECTOR ROADS PARALLEL TO EAST AND WESTBOUND SR-91 AT POST MILES 3.27/3.68. | 02/28/2014 | 1 (02/26/2013) | Details CEM-3701 Report |
| 10053 | Project ID: 10053 DEA: 034M5604 EFIS: 0312000111 | 03-GLE-32-L0.0/L1.3,9.5/10.0 | REPLACE AC SURFACING, APPLY MICRO-SURFACING AND PLACE TRAFFIC STRIPES. | GLENN COUNTY IN AND NEAR ORLAND FROM 0.1 MILE WEST OF ROUTE 32/5 SEPARATION TO 0.3 MILE EAST OF PAPST AVENUE AND FROM 0.1 MILE WEST OF GLENN-COLUSA CANAL TO 0.4 MILE EAST OF JUNCTION ROUTE 45 | 10/08/2014 | NOT VERIFIED | Details CEM-3701 Report |
| 10052 | Project ID: 10052 DEA: 034M5004 EFIS: 0312000007 | 03-NEV,PLA-65,80,174-VAR | METHACRYLATE AND POLYESTER DECKS ON 5 BRIDGES | NEVADA AND PLACER COUNTIES AT VARIOUS LOCATIONS | 12/05/2017 | 1 (08/16/2013) | Details CEM-3701 Report |
| 10051 | Project ID: 10051 DEA: 01476904 EFIS: 0100000353 | 01-DN-101-R4.0 | REMOVE AND RECONSTRUCT HINGES AT SPANS 2, 8, AND 11 | DEL NORTE COUNTY NEAR KLAMATH AT THE KLAMATH RIVER BRIDGE | 01/30/2017 | 1 (02/27/2013) | Details CEM-3701 Report |
