Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 10971-10980 of 18774 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 211666 | Project ID: 211666 DEA: 101F1204 EFIS: 1016000041 MINOR: 10A1789 | 10--26-12.7 | 12/06/2019 | 1 (08/31/2016) | Details CEM-3701 Report | ||
| 211704 | Project ID: 211704 DEA: 010B4404 EFIS: 0112000128 | 01-HUM-169-26.4/29.8 | CIDH PILES, RSP PLACEMENT AND HMA | HUMBOLDT COUNTY NEAR WEITCHPEC FROM 0.6 MILE WEST OF MINERS CREEK BRIDGE TO ROCK CHUTE CREEK BRIDGE | 09/28/2018 | 1 (09/27/2016) | Details CEM-3701 Report |
| 211705 | Project ID: 211705 DEA: 024G3804 EFIS: 0214000006 | 02-TRI-299-0.0/8.3 | PLACE RUBBERIZED HOT MIX ASPHALT, GUARDRAIL, AND SOME DRAINAGE | TRINITY COUNTY AT AND NEAR SALYER FROM HUMBOLDT COUNTY LINE TO 0.6 MILE EAST OF GRAY CREEK ROAD | 01/02/2019 | 1 (10/25/2017) | Details CEM-3701 Report |
| 211668 | Project ID: 211668 DEA: 010B2604 EFIS: 0112000150 | 01-DN-199-8.2 | CONSTRUCT BRIDGE AND WIDEN SHOULDERS | DEL NORTE COUNTY NEAR HIOUCHI AT 1 MILE NORTH OF SOUTH FORK ROAD | 01/07/2019 | 1 (09/27/2016) | Details CEM-3701 Report |
| 211669 | Project ID: 211669 DEA: 022C0904 EFIS: 0200000161 | 02-PLU-70-50.6/51.7 | BRIDGE WIDENING AND DECK REPLACEMENT, HMA, MGS AND CULVERT REPLACEMENT | PLUMAS COUNTY NEAR QUINCY FROM 0.6 MILE WEST TO 0.5 MILE EAST OF SPRING GARDEN BRIDGE OVERHEAD | 11/12/2020 | 1 (10/25/2016) | Details CEM-3701 Report |
| 211689 | Project ID: 211689 DEA: 042594A4 EFIS: 0412000642 | 04-NAP-29-R20.4/R20.8 | HIGHWAY PLANTING | NAPA COUNTY NEAR YOUNTVILLE FROM 0.2 MILE SOUTH TO 0.2 MILE NORTH OF WASHINGTON STREET | 10/14/2022 | 1 (08/19/2019) | Details CEM-3701 Report |
| 211691 | Project ID: 211691 DEA: 043G0704 EFIS: 0400021271 | 04-SON-1-7.2 | PLACE ROCK SLOPE PROTECTION AND REPAIR SLIPOUT | SONOMA COUNTY AT BODEGA BAY AT 0.8 MILE NORTH OF BAY HILL ROAD | 12/18/2017 | NOT VERIFIED | Details CEM-3701 Report |
| 211670 | Project ID: 211670 DEA: 06434014 EFIS: 0600000967 | 06-TUL-65-R15.1/18.0 | WIDEN 2 LANES CONVENTIONAL HIGHWAY TO 4 LANES EXPRESSWAY. | TULARE COUNTY IN AND NEAR PORTERVILLE FROM 1.0 MILE NORTH OF AVENUE 112 TO 0.3 MILE SOUTH OF ROUTE 65/190 SEPARATION | 08/24/2018 | 1 (09/27/2016) | Details CEM-3701 Report |
| 211671 | Project ID: 211671 DEA: 07281504 EFIS: 0700000552 | 07-LA,VEN-101-29.3/38.2,0.0/1.2 | CONSTRUCT STORM WATER TREATMENT SYSTEMS. | LOS ANGELES AND VENTURA COUNTIES AT VARIOUS LOCATIONS | 05/04/2020 | 1 (01/23/2017) | Details CEM-3701 Report |
| 211692 | Project ID: 211692 DEA: 11080234 EFIS: 1100020357 | 11-IMP-98-31.6/32.1 | WIDEN HIGHWAY, HOT MIX ASPHALT (TYPE A), AND SIGNAL AND LIGHTING. | IMPERIAL COUNTY IN CALEXICO FROM EADY AVENUE TO OLLIE AVENUE | 08/20/2018 | 1 (02/07/2017) | Details CEM-3701 Report |
