Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 10951-10960 of 18774 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
811Project ID: 811
DEA: 030AA004
03-BUT,SAC-L5703,L5753-L5703, L5753Installation Of Photovoltaic PanelsBUTTE COUNTY IN CHICO AT THE CHICO MAINTENANCE STATION AT 2535 NOTRE DAME BOULEVARD AND IN SACRAMENTO COUNTY IN RANCHO CORDOVA AT THE SUNRISE MAINTENANCE STATION AT 11325 SANDERS DRIVE10/25/20101 (11/16/2009)Details CEM-3701 Report
994728Project ID: 994728
DEA: 032J8104
EFIS: 0322000102
03-BUT-99-R30.6,R31.5CONSTRUCT SLOPE PAVING AND INSTALL AESTHETIC FEATURE.BUTTE COUNTY IN CHICO AT SKYWAY OVERCROSSING AND AT EAST 20TH STREET OVERCROSSING03/27/20251 (05/15/2023)Details CEM-3701 Report
211914Project ID: 211914
DEA: 034F2604
EFIS: 0314000091
03-BUT-32-R9.2INSTALL TRAFFIC SIGNAL AT IVY STREET (EASTBOUND AND WESTBOUND)BUTTE COUNTY IN CHICO AT ROUTE 32 AND IVY STREET06/29/20181 (06/05/2017)Details CEM-3701 Report
7283Project ID: 7283
DEA: 033E9104
EFIS: 0300020571
03-BUT-32-R9.5Signal Modification and Install ADA RampsBUTTE COUNTY IN CHICO AT MAIN STREET AND OROVILLE AVENUE04/29/20131 (10/12/2012)Details CEM-3701 Report
994640Project ID: 994640
DEA: 032G6004
EFIS: 0322000038
03-BUT-99-R34.3PLACE POLYESTER CONCRETE OVERLAY.BUTTE COUNTY IN CHICO AT COHASSET HIGHWAY OVERCROSSING01/23/20241 (05/15/2023)Details CEM-3701 Report
994235Project ID: 994235
DEA: 030J8704
EFIS: 0320000035
03-BUT-191-8.4/10.1STABILIZE CUT SLOPE, WIDEN SHOULDERS, REPLACE DRAINAGE AND PLACE HMA.BUTTE COUNTY IN AND NEAR PARADISE FROM 0.3 MILES SOUTH OF AIRPORT ROAD TO 0.2 MILES NORTH OF OLD CLARK ROAD 1 (09/14/2022)Details CEM-3701 Report
208769Project ID: 208769
DEA: 034M2704
EFIS: 0300020517
03-BUT-191-0.2/11.4RUBBERIZED HMA, TRAFFIC STRIPES, TMS (COUNT), MOD SIGNAL AND LIGHTING.BUTTE COUNTY IN AND NEAR PARADISE FROM 0.2 MILE NORTH OF ROUTE 70 TO PEARSON ROAD10/01/20141 (01/15/2014)Details CEM-3701 Report
925Project ID: 925
DEA: 031E1104
03-BUT-70,162-14.8,10.1INSTALL CABLE RESTRAINERS AND CONCRETE BLOCKS AT PIERS AND ABUTMENTS.BUTTE COUNTY IN AND NEAR OROVILLE ON ROUTE 70 AT FEATHER RIVER BRIDGE AND ON ROUTE 162 AT THERMALITO AFTERBAY BRIDGE12/17/20121 (10/11/2010)Details CEM-3701 Report
215777Project ID: 215777
DEA: 032H6304
EFIS: 0317000166
03-BUT-162-18.4/19.9PLACE RUBBERIZED HMA AND ROADWAY EXCAVATION.BUTTE COUNTY IN AND NEAR OROVILLE FROM FOOTHILL BOULEVARD TO GOLD COUNTRY CASINO ENTRANCE02/22/20241 (06/01/2021)Details CEM-3701 Report
214628Project ID: 214628
DEA: 031G6604
EFIS: 0319000116
03-BUT-162-12.6/15.6COLD IN-PLACE RECYCLING, RHMA-G OVERLAY, AND COLD PLANE AC PAVEMENT.BUTTE COUNTY IN AND NEAR OROVILLE FROM 0.8 MILE EAST OF WILBUR ROAD TO FEATHER RIVER BRIDGE07/09/20211 (03/24/2020)Details CEM-3701 Report