Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 10921-10930 of 18774 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 208614 | Project ID: 208614 DEA: 042G3614 EFIS: 0412000576 | 04-ALA-92,880-6.3/6.8,15.5/16.8 | REPLACEMENT HIGHWAY PLANTING. | ALAMEDA COUNTY IN HAYWARD ON ROUTE 92 FROM 0.2 MILE WEST OF ROUTE 92/880 SEPARATION TO SANTA CLARA STREET AND ON ROUTE 880 FROM 0.1 MILE SOUTH OF TENNYSON ROAD OVERCROSSING TO 0.2 MILE NORTH OF ROUTE 92/880 SEPARATION | 08/20/2018 | 1 (04/10/2013) | Details CEM-3701 Report |
| 208613 | Project ID: 208613 DEA: 034M5304 | 03-BUT-99-13.0/20.6 | PAVEMENT REHABILITATION | BUTTE COUNTY ABOUT 10 MILES NORTH OF GRIDLEY FROM 0.2 MILE SOUTH OF NORTH JUNCTION ROUTE 162 TO DRY CREEK BRIDGE | 10/08/2014 | 1 (10/08/2014) | Details CEM-3701 Report |
| 208612 | Project ID: 208612 DEA: 034M5204 EFIS: 0312000009 | 03-SAC-80,99,160-VAR | REHABILITATE 13 BRIDGE DECKS | SACRAMENTO COUNTY AT VARIOUS LOCATIONS | 02/06/2015 | 1 (07/22/2013) | Details CEM-3701 Report |
| 208611 | Project ID: 208611 DEA: 033M7204 EFIS: 0312000023 | 03-SAC-160-L6.98 | BRIDGE DECK AND CONTROL HOUSE REHABILITATION | SACRAMENTO COUNT NEAR RIO VISTA AT THREE MILE SLOUGH BRIDGE | 01/30/2015 | 1 (07/05/2013) | Details CEM-3701 Report |
| 208610 | Project ID: 208610 DEA: 033M5804 EFIS: 0312000107 | 03-BUT-99-44.4/46.0 | HMA OVERLAY, RUMBLE STRIPS, COLD PLANE | BUTTE COUNTY NEAR CHICO FROM 0.1 MILE NORTH OF BROYLES ROAD TO THE TEHAMA COUNTY LINE | 10/08/2014 | 1 (07/22/2013) | Details CEM-3701 Report |
| 208609 | Project ID: 208609 DEA: 030F6804 EFIS: 0300000099 | 03-SAC-80-M8.1/R11.1 | REHABILITATE THREE BRIDGES | SACRAMENTO COUNTY IN AND NEAR SACRAMENTO AT VARIOUS LOCATIONS FROM NORTH AVENUE OVERCROSSING TO ROUTE 80/244 SEPARATION | 10/01/2014 | 1 (07/22/2013) | Details CEM-3701 Report |
| 208608 | Project ID: 208608 DEA: 024E5404 EFIS: 0200020319 | 02-SHA,SIS-3,5,96,97-VAR | BRIDGE MAINTENANCE - POLYESTER CONCRETE OVERLAY | SHASTA AND SISKIYOU COUNTIES AT VARIOUS LOCATIONS | 02/23/2016 | 1 (04/05/2013) | Details CEM-3701 Report |
| 208607 | Project ID: 208607 DEA: 023E7104 EFIS: 0200020148 | 02-TRI-36-R30.4/R30.7 | PLACE HMA AND HORIZONTAL CURVE IMPROVEMENT. | TRINITY COUNTY ABOUT 12 MILES EAST OF FOREST GLEN FROM 1.7 MILES TO 2.1 MILES EAST OF ROUTE 3 | 01/02/2015 | 1 (04/05/2013) | Details CEM-3701 Report |
| 208606 | Project ID: 208606 DEA: 023E6304 EFIS: 0200020068 | 02-LAS,PLU,TEH-32,36,139,299-Var | BRIDGE DECK AND GUARD RAILING MAINTENANCE | LASSEN, PLUMAS AND TEHAMA COUNTIES AT VARIOUS LOCATIONS | 11/04/2014 | 1 (02/28/2013) | Details CEM-3701 Report |
| 208604 | Project ID: 208604 Permit Numbers: 1112NLF0050 1113NDP0027 | 11-IMP-8-37.8/38.14 | enter upon State Highway right of way in Imperial County, City of El Centro, on Route 8, post mile R37.82-R38.14, to perform grading and to install irrigation and landscaping, as shown on the attached plans, in accordance with the requirements and conditions | INTERSTATE 8, EL CENTRO | 08/01/2018 | NOT VERIFIED | Details CEM-3701 Report |
