Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 10891-10900 of 18864 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 214940 | Project ID: 214940 DEA: 120Q2804 EFIS: 1216000120 | 12-ORA-1-27.0/29.0 | INSTALL CONC BARRIER, RUMBLE STRIP AND PVMT DELINEATION. | ORANGE COUNTY IN HUNTINGTON BEACH FROM SEAPOINT STREET TO WARNER AVENUE | 03/01/2022 | 1 (09/03/2020) | Details CEM-3701 Report |
| 1000483 | Project ID: 1000483 DEA: 120S1404 EFIS: 1219000098 | 12-ORA-1-21.5/31.1,32.7 | INSTALL CONC BARRIER, CURB, HMA PVMT, TRAFFIC STRIPE AND MARKINGS. | ORANGE COUNTY IN AND NEAR HUNTINGTON BEACH AND SEAL BEACH FROM SANTA ANA RIVER BRIDGE TO ANDERSON STREET AND AT SEAL BEACH BOULEVARD | 1 (08/05/2024) | Details CEM-3701 Report | |
| 3805 | Project ID: 3805 DEA: 07120884 | 07-LA-101-25.3 | INSTALL COMMUNICATION SYSTEM | IN LOS ANGELES AND VENTURA COUNTIES AT VARIOUS LOCATIONS | 08/05/2010 | 1 (08/22/2010) | Details CEM-3701 Report |
| 3806 | Project ID: 3806 DEA: 07120934 | 07-LA-710- 6.8 | INSTALL COMMUNICATION SYSTEM | IN LOS ANGELES COUNTY IN LONG BEACH FROM ROUTE 1 TO ROUTE 405 AND 710 SEPARATION | 08/26/2010 | 1 (08/26/2010) | Details CEM-3701 Report |
| 5334 | Project ID: 5334 MINOR: 08A1290 | 08-SBD-71- | INSTALL COMMUNICATION SYSTEM | 2 (06/23/2021) | Details CEM-3701 Report | ||
| 1305 | Project ID: 1305 DEA: 034E4704 | 03-YUB-5714- | INSTALL COMMUNICAITON TOWER AND VAULT | 12/17/2012 | 1 (12/07/2009) | Details CEM-3701 Report | |
| 994108 | Project ID: 994108 DEA: 044J8504 EFIS: 0416000028 | 04-SM-280-R0.0-R21.0 | Install column casings, concrete barriers and rock slope protection. | 1 (07/13/2022) | Details CEM-3701 Report | ||
| 214517 | Project ID: 214517 DEA: 034F1004 EFIS: 0314000024 | 03-SAC-5,80,99-29.9,M9.2,R32.1 | INSTALL COLUMN CASINGS AND PLACE STRUCTURAL CONCRETE. | SACRAMENTO COUNTY IN SACRAMENTO AT ROUTE 5 AND 99 AT S99-S5 CONNECTOR OVERCROSSING AND ON ROUTE 80 AT LONGVIEW DRIVE ON RAMP OVERCROSSING | 09/28/2021 | 1 (11/22/2019) | Details CEM-3701 Report |
| 994252 | Project ID: 994252 DEA: 101F4004 EFIS: 1016000053 | 10-SJ-4,5,99-Var | INSTALL CMSS, CCTV, TMSS, VCS, RWIS AND FO CABLE. | SAN JOAQUIN COUNTY AT VARIOUS LOCATIONS. | 04/30/2025 | 1 (09/20/2022) | Details CEM-3701 Report |
| 215783 | Project ID: 215783 DEA: 033H3304 EFIS: 0317000325 | 03-YOL,SAC-50-2.5/3.2,L0.0/18.3 | INSTALL CMS, FIBER OPTIC CABLE SYSTEMS AND CAMERA SYSTEMS. | YOLO COUNTY AND SACRAMENTO COUNTY ON ROUTE 50 FROM JEFFERSON BOULEVARD TO 1.3 MILES EAST OF FOLSOM BOULEVARD | 01/22/2024 | 1 (07/26/2021) | Details CEM-3701 Report |
