Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 10861-10870 of 18774 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
993305Project ID: 993305
Permit Numbers: 04216US0226
04-SCL-880-7.4/7.5PG&E has a project coming up where we will be retiring in place a gas transmission pipeline under state highway 880. This pipeline needs to be retired in place rather than removed due to trenching across the highway would leave a big patch as well as causing severe traffic disruptions. InsteadHighway 880, Milpitas06/22/20221 (10/07/2021)Details CEM-3701 Report
214039Project ID: 214039
Permit Numbers: 04186UL1291 04186RW1999
04---3.1/4.43PG&E is in the process of designing a replacement and modernization of the gas transmission system on L-107 in Fremont.Hwy 880, Fremont11/30/00-11 (09/16/2019)Details CEM-3701 Report
209812Project ID: 209812
DEA: 04264H34
EFIS: 0414000221
COOP: 042535
04-MRN-101-18.6/27.7PHASE 1 OF MARIN -SONOMA NARROWS HIGH OCCUPANCY VEHICLE WIDENING PROJECT IIN MARIN COUNTY IN NOVATO AND NEAR BURDELL AT VARIOUS LOCATIONS FROM SOUTH NOVATO BOULEVARD OVERCROSSINGTO 0.3 MILE NORTH OF REDWOOD LANDFILL OVERCROSSING12/22/20171 (09/17/2015)Details CEM-3701 Report
1526Project ID: 1526
EFIS: 0000001155
Permit Numbers: 0407NDP0831
04-ALA-61-14.9/15.9PHASE 1 STREET IMPROVEMTNS, NEW MEDIAN, DECORATIVE POLES AND GATEWAY MONUMENT 05/04/2011NOT VERIFIEDDetails CEM-3701 Report
2241Project ID: 2241
DEA: 043A6404
EFIS: 0400020507
COOP: 042383A
04-SF-80-12.3/13.2Phase 1: Replace connector ramps on the east side of Yerba Buena IslandPhase 1: YBI to the State owned San Francisco-Oakland Bay Bridge (SFOBB) on Interstate Route 8002/10/20212 (02/03/2020)Details CEM-3701 Report
7598Project ID: 7598
DEA: 042332C4
EFIS: 0400000668
COOP: 042346
Permit Numbers: 0412NDP1301 0412NMC0521 0412NRD1458 0412NRD0731
04-ALA-262-0/0.5Phase 1B of the 1-880/mission Boulevard improvements includes:The demolition of two single-track freight rail bridges;Warm Springs Blvd, Fremont06/03/20151 (12/12/2012)Details CEM-3701 Report
1527Project ID: 1527
Permit Numbers: 0407NDP0838
04-ALA-61-14.9/15.9PHASE 2 STREET IMPROVEMTNS, NEW MEDIAN, DECORATIVE POLES AND GATEWAY MONUMENT 05/04/2011NOT VERIFIEDDetails CEM-3701 Report
993174Project ID: 993174
DEA: 101K9704
EFIS: 1019000184
MINOR: 10A2236
10-MER-165-33.1PHB/HAWK CROSSWALK SYSTEM INSTALLATIONON STATE ROUTE 165 IN MERCED COUNTY AT THE INTERSECTION OF SR-165/LANDER AVENUE & ECHO STREET IN THE TOWN OF HILMAR09/01/20231 (08/02/2021)Details CEM-3701 Report
2990Project ID: 2990
DEA: 05922974
05-SLO--PICACHIO ROAD BRIDGE REPLACEMENT AT CAYUCOS CREEK BRLO-5949(033) 09/06/2019NOT VERIFIEDDetails CEM-3701 Report
2247Project ID: 2247
DEA: 043A7604
04-CC,MRN-580-7.3/7.8,0.0/0.7PIER 34 FENDER COLLISION DAMAGE AND FENDER REHABILITATIONIN CONTRA COSTA AND MARIN COUNTIES ON ROUTE 580 AT THE RICHMOND-SAN RAFAEL BRIDGE04/20/20111 (04/20/2011)Details CEM-3701 Report