Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 10861-10870 of 18774 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 993305 | Project ID: 993305 Permit Numbers: 04216US0226 | 04-SCL-880-7.4/7.5 | PG&E has a project coming up where we will be retiring in place a gas transmission pipeline under state highway 880. This pipeline needs to be retired in place rather than removed due to trenching across the highway would leave a big patch as well as causing severe traffic disruptions. Instead | Highway 880, Milpitas | 06/22/2022 | 1 (10/07/2021) | Details CEM-3701 Report |
| 214039 | Project ID: 214039 Permit Numbers: 04186UL1291 04186RW1999 | 04---3.1/4.43 | PG&E is in the process of designing a replacement and modernization of the gas transmission system on L-107 in Fremont. | Hwy 880, Fremont | 11/30/00-1 | 1 (09/16/2019) | Details CEM-3701 Report |
| 209812 | Project ID: 209812 DEA: 04264H34 EFIS: 0414000221 COOP: 042535 | 04-MRN-101-18.6/27.7 | PHASE 1 OF MARIN -SONOMA NARROWS HIGH OCCUPANCY VEHICLE WIDENING PROJECT I | IN MARIN COUNTY IN NOVATO AND NEAR BURDELL AT VARIOUS LOCATIONS FROM SOUTH NOVATO BOULEVARD OVERCROSSINGTO 0.3 MILE NORTH OF REDWOOD LANDFILL OVERCROSSING | 12/22/2017 | 1 (09/17/2015) | Details CEM-3701 Report |
| 1526 | Project ID: 1526 EFIS: 0000001155 Permit Numbers: 0407NDP0831 | 04-ALA-61-14.9/15.9 | PHASE 1 STREET IMPROVEMTNS, NEW MEDIAN, DECORATIVE POLES AND GATEWAY MONUMENT | 05/04/2011 | NOT VERIFIED | Details CEM-3701 Report | |
| 2241 | Project ID: 2241 DEA: 043A6404 EFIS: 0400020507 COOP: 042383A | 04-SF-80-12.3/13.2 | Phase 1: Replace connector ramps on the east side of Yerba Buena Island | Phase 1: YBI to the State owned San Francisco-Oakland Bay Bridge (SFOBB) on Interstate Route 80 | 02/10/2021 | 2 (02/03/2020) | Details CEM-3701 Report |
| 7598 | Project ID: 7598 DEA: 042332C4 EFIS: 0400000668 COOP: 042346 Permit Numbers: 0412NDP1301 0412NMC0521 0412NRD1458 0412NRD0731 | 04-ALA-262-0/0.5 | Phase 1B of the 1-880/mission Boulevard improvements includes:The demolition of two single-track freight rail bridges; | Warm Springs Blvd, Fremont | 06/03/2015 | 1 (12/12/2012) | Details CEM-3701 Report |
| 1527 | Project ID: 1527 Permit Numbers: 0407NDP0838 | 04-ALA-61-14.9/15.9 | PHASE 2 STREET IMPROVEMTNS, NEW MEDIAN, DECORATIVE POLES AND GATEWAY MONUMENT | 05/04/2011 | NOT VERIFIED | Details CEM-3701 Report | |
| 993174 | Project ID: 993174 DEA: 101K9704 EFIS: 1019000184 MINOR: 10A2236 | 10-MER-165-33.1 | PHB/HAWK CROSSWALK SYSTEM INSTALLATION | ON STATE ROUTE 165 IN MERCED COUNTY AT THE INTERSECTION OF SR-165/LANDER AVENUE & ECHO STREET IN THE TOWN OF HILMAR | 09/01/2023 | 1 (08/02/2021) | Details CEM-3701 Report |
| 2990 | Project ID: 2990 DEA: 05922974 | 05-SLO-- | PICACHIO ROAD BRIDGE REPLACEMENT AT CAYUCOS CREEK BRLO-5949(033) | 09/06/2019 | NOT VERIFIED | Details CEM-3701 Report | |
| 2247 | Project ID: 2247 DEA: 043A7604 | 04-CC,MRN-580-7.3/7.8,0.0/0.7 | PIER 34 FENDER COLLISION DAMAGE AND FENDER REHABILITATION | IN CONTRA COSTA AND MARIN COUNTIES ON ROUTE 580 AT THE RICHMOND-SAN RAFAEL BRIDGE | 04/20/2011 | 1 (04/20/2011) | Details CEM-3701 Report |
