Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 10801-10810 of 18775 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
211473Project ID: 211473
DEA: 074X9304
07-VEN-VAR-Remove and dispose hazards trees 06/16/20211 (07/07/2017)Details CEM-3701 Report
211475Project ID: 211475
DEA: 031H6704
03-SIE-49-3.1, 3.1Repair slipout, slope stabilization 04/01/20211 (05/31/2016)Details CEM-3701 Report
211476Project ID: 211476
DEA: 030H7104
03-BUT,GLE-32-R4.2/9.6,0.4/4.6INSTALL EDGELINE AND SHOULDER RUMBLE STRIPSGLENN AND BUTTE COUNTIES FROM 0.4 MILE WEST OF COUNTY ROAD RR TO GLENN-COLUSA CANAL BRIDGE AND FROM 0.1 MILE EAST OF GIANELLA ROAD TO 0.3 MILE WEST OF FREIGHT LANE07/12/20171 (10/19/2016)Details CEM-3701 Report
211477Project ID: 211477
DEA: 07288204
07-LA-60,60-16.0/16.8&0.1/R3.1STORM WATER SOURCE - REPLACEMENT HIGHWAY PLANTING AND IRRIGATIONLOS ANGELES COUNTY IN LOS ANGELES AND EAST LOS ANGELES ON ROUTE 60 FROM 0.1 MILE WEST OF BOYLE AVENUE UNDERCROSSING TO EASTERN AVENUE OVERCROSSING AND ON ROUTE 5 FROM EUCLID UNDERCROSSING TO BOYLE AVENUE OVERCROSSING03/15/20211 (07/07/2017)Details CEM-3701 Report
211478Project ID: 211478
DEA: 11409704
EFIS: 1112000049
11-SD-8,15,163-VarPAVE GORE AREAS, CONSTRUCT CONCRETE BARRIER, AND PLACE CRASH CUSHION.SAN DIEGO COUNTY AT VARIOUS LOCATIONS08/31/20181 (10/03/2016)Details CEM-3701 Report
211479Project ID: 211479
DEA: 041K7904
EFIS: 0416000315
04-SON,SON-1-15.3/15.6, 15.4Const RSP and pavement 12/18/2017NOT VERIFIEDDetails CEM-3701 Report
211488Project ID: 211488
EFIS: 1015001011
MINOR: 10A1767
10--33,26,132-varCured In Place Pipeliner and Replace CulvertsVarious Counties12/06/20191 (10/19/2016)Details CEM-3701 Report
211481Project ID: 211481
Permit Numbers: 0715NSN1631 0716NRT2476 07176DP1892 0717NRT0013
07-LA-1-15.8/15.8Install left-turn phasing to north/south Route 1 (PCH)at Madison Street.Route 1 (Pacific Coast Highway), Torrance06/16/20211 (01/04/2018)Details CEM-3701 Report
211495Project ID: 211495
DEA: 051C1204
EFIS: 0512000072
05-SB-101-0.4/11.7PAVE GORE AREAS WITH CONCRETE, SHALE VEGETATION CONTROL, AND MULCH.SANTA BARBARA COUNTY AT VARIOUS LOCATIONS FROM 0.2 MILE SOUTH OF ROUTE 150/101 SEPARATION TO 0.3 MILE NORTH OF CABRILLO BOULEVARD UNDERCROSSING01/04/20181 (02/06/2017)Details CEM-3701 Report
211483Project ID: 211483
DEA: 030H7304
EFIS: 0316000009
03-COL,SUT,YOL-16,20,80-VarINSTALL CENTERLINE AND SHOULDER RUMBLE STRIPSCOLUSA, SUTTER, AND YOLO COUNTIES AT VARIOUS LOCATIONS07/12/20171 (10/19/2016)Details CEM-3701 Report