Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 10711-10720 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 211793 | Project ID: 211793 DEA: 041SS444 EFIS: 0412000603 | 04-ALA-880-19.3 | EARTH WORK AND ALTERNATIVE PIPELINER | ALAMEDA COUNTY AT SAN LORENZO AT THE HACIENDA AVENUE PUMPING PLANT | 01/02/2018 | 1 (06/19/2017) | Details CEM-3701 Report |
| 211794 | Project ID: 211794 DEA: 044G5104 EFIS: 0412000483 | 04-SOL-80-31.4,32.6 | BRIDGE CONSTRUCTION | SOLANO COUNTY IN AND NEAR VACAVILLE AT MERIDIAN ROAD OVERCROSSING AND AT MIDWAY ROAD OVERCROSSING | 09/12/2019 | 1 (01/03/2017) | Details CEM-3701 Report |
| 211795 | Project ID: 211795 DEA: 07306004 EFIS: 0714000244 | 07-LA-5,14-R44.6/R45.7,R24.8/R25.0 | SLOPE STABILIZATION AND ELECTRICAL SAFETY IMPROVEMENT | LOS ANGELES COUNTY IN AND NEAR LOS ANGELES AND SANTA CLARITA ON ROUTE 5 FROM 0.1 MILE NORTH OF BALBOA BOULEVARD OVERCROSSING TO CONNECTOR OF ROUTE 5 SOUTH TO ROUTE 14 NORTH AND ON ROUTE 14 FROM ROUTE 5/14 SEPARATION TO 0.1 MILE SOUTH OF SIERRA HIGHWAY UND | 02/15/2019 | 1 (10/03/2016) | Details CEM-3701 Report |
| 211796 | Project ID: 211796 DEA: 073X8704 EFIS: 0713000241 | 07-LA-105,405-R2.5,20.5/R21.1 | SLOPE RECONSTRUCTION AND PAVEMENT REPAIR | LOS ANGELES COUNTY IN AND NEAR HAWTHORNE FROM EL SEGUNDO BOULEVARD UNDERCROSSING TO ROUTE 105/405 SEPARATION | 04/08/2020 | 1 (03/14/2017) | Details CEM-3701 Report |
| 211797 | Project ID: 211797 DEA: 080G8424 EFIS: 0814000184 | 08-SBD-15-R107.3 | UPGRADE EXISTING SAFETY ROADSIDE REST AREAS (SRRA) | SAN BERNARDINO COUNTY ABOUT 30 MILES EAST OF BARSTOW AT C.V. KANE SAFETY ROADSIDE REST AREA | 06/23/2021 | 1 (02/08/2017) | Details CEM-3701 Report |
| 211798 | Project ID: 211798 DEA: 080Q1304 EFIS: 0800020212 | 08-SBD-62-1.9/7.6 | CONSTRUCT RAISED MEDIAN CURB AND DOUBLE THRIE BEAM BARRIER | SAN BERNARDINO COUNTY AT MORONGO VALLEY FROM EAST DRIVE TO YUCCA PARK ROAD | 12/12/2019 | 1 (04/05/2017) | Details CEM-3701 Report |
| 211799 | Project ID: 211799 DEA: 081G1404 EFIS: 0815000138 | 08-RIV-371-61.9/67.8 | PREVENTATIVE MAINTENANCE TREATMENT OVERLAY | RIVERSIDE COUNTY IN CAHUILLA FROM 0.4 MILE WEST OF BARBARA TRAIL TO 0.1 MILE EAST OF CARY ROAD | 10/16/2017 | NOT VERIFIED | Details CEM-3701 Report |
| 211800 | Project ID: 211800 DEA: 09356104 EFIS: 0912000044 | 09-MNO-395-34.1 | CONSTRUCT MAINTENANCE EQUIPMENT STORAGE BUILDING AND SITE WORK. | BUILDING CONSTRUCTION ADJACENT TO STATE HIGHWAY IN MONO COUNTY AT CRESTVIEW AT THE CRESTVIEW SATELLITE MAINTENANCE STATION | 11/12/2019 | 1 (06/01/2017) | Details CEM-3701 Report |
| 211801 | Project ID: 211801 DEA: 112M8304 EFIS: 1115000107 | 11-SD-94-39.0/65.4 | APPLY POLYMER MODIFIED ASPHALTIC EMULSION CHIP SEAL. | SAN DIEGO COUNTY FROM ROUTE 188 TO ROUTE 8 | 09/12/2023 | 1 (11/01/2016) | Details CEM-3701 Report |
| 211802 | Project ID: 211802 DEA: 11421604 EFIS: 1115000142 | 11-SD-78-13.0/14.1 | CONSTRUCT BARRIER, RETAINING WALL AND WIDEN ROAD. | SAN DIEGO COUNTY IN SAN MARCOS FROM 0.1 MILE EAST OF TWIN OAKS VALLEY ROAD OVERCROSSING TO 0.2 MILE WEST OF WOODLAND PARKWAY UNDERCROSSING | 08/16/2021 | 1 (03/21/2017) | Details CEM-3701 Report |
