Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 10711-10720 of 19330 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 1400 | Project ID: 1400 Permit Numbers: 04056DP2070 | 04-CC-4-37 | Traffic Signal | CONTRA COSTA | 05/03/2011 | NOT VERIFIED | Details CEM-3701 Report |
| 1723 | Project ID: 1723 DEA: 040G2604 | 04-MRN-580-6.22,7.79/0.0,2.48 | REPLACE FAILING FINGER JOINT HEADERS | Contra Costa | 06/13/2011 | 1 (04/05/2011) | Details CEM-3701 Report |
| 1001890 | Project ID: 1001890 DEA: 060V1214 EFIS: 0622000003 MINOR: 06A3212 | 06-MAD-99-6.9/7.6 | Cottonwood Creek Bridge Rehab Landscape Project. Plant, irrigate, and maintain 122 trees. | Construction on the State Highway in Madera County near Madera at Cottonwood Creek Bridge. | 12/30/2025 | 1 (12/30/2025) | Details CEM-3701 Report |
| 1001423 | Project ID: 1001423 DEA: 113A8294 EFIS: 1124000291 MINOR: 11A4112 | 11-SD-5,15-VAR | Replace bike signal backplates, install bike signs, replace 3-section signal head to a 5-section signal head, and restripe crosswalk with green thermoplastic. | Construction on State Highway San Diego County at Various Locations. | 1 (07/28/2025) | Details CEM-3701 Report | |
| 212324 | Project ID: 212324 DEA: 033F5104 EFIS: 0313000020 | 03-YUB-20-R18.1/R20.1 | Construct bridge, realign curve & widen shoulders. | Construction on state highway in Yuba County near Smartsville from the Yuba River Bridge to 0.3 mile east of Smartsville Road. | 08/03/2023 | 1 (02/27/2020) | Details CEM-3701 Report |
| 209801 | Project ID: 209801 DEA: 120M3904 EFIS: 1212000042 MINOR: 12A1525 | 12-ORA-57-17.6/18.4 | CONVERT THE HOV BYPASS LANE TO A METERED LANE AND REMOVE THE TRAFFIC CONTROL DEVICES ASSOCIATED WITH IT. RESTRIPE ON-RAMP, INSTALL NEW SIGNS & RELOCATE ELECTRICAL CABINET CONTROLLER BOX. | CONSTRUCTION ON STATE HIGHWAY IN YORBA LINDA ON SOUTHBOUND ROUTE 57 ON RAMP FROM YORBA LINDA BLVD. | 07/29/2016 | NOT VERIFIED | Details CEM-3701 Report |
| 214463 | Project ID: 214463 DEA: 043G6204 EFIS: 0412000141 | 04-SF-101-2.0 | Replace bridge concrete decks, concrete barriers and bridge railings | Construction on State Highway in the city and county of San Francisco at Alemany Circle Undercrossing | 01/13/2023 | 1 (03/02/2020) | Details CEM-3701 Report |
| 208891 | Project ID: 208891 DEA: 024E9404 EFIS: 0212000681 MINOR: 02A1276 | 02-TEH-99-17.6/R18.0 | INSTALL FLASHING BEACON SYSTEM | CONSTRUCTION ON STATE HIGHWAY IN TEHAMA COUNTY NEAR DAIRYVILLE FROM 65TH AVENUE TO ANTELOPE CREEK BRIDGE | 12/21/2020 | 1 (06/07/2013) | Details CEM-3701 Report |
| 1002265 | Project ID: 1002265 DEA: 101U0604 EFIS: 1025000086 | 10-STA-33-7.1/12.4, 13.7/14.7 | Partial depth recycling with RHMA-G with 10% RAP. | CONSTRUCTION ON STATE HIGHWAY IN STANISLAUS COUNTY IN AND NEAR PATTERSON FROM 1.1 MILES NORTH OF MAIN CANAL BRIDGE TO 0.2 MILE SOUTH OF SPERRY AVENUE AND FROM 0.6 MILE NORTH OF LAS PALMAS AVENUE TO EUCALYPTUS AVENUE. 10-Sta-33-7.1/12.4, 13.7/14.7 | 1 (07/06/2026) | Details CEM-3701 Report | |
| 994425 | Project ID: 994425 DEA: 040K5204 EFIS: 0416000098 | 04-SON-12-11.0/T17.4 | Overlay with RHMA, replace guardrails, approach slabs and signs. | Construction on State Highway in Sonoma County from Llano Road to Farmers Lane. | 1 (12/07/2022) | Details CEM-3701 Report |
