Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 10691-10700 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 211773 | Project ID: 211773 MINOR: 12A1640 | 12--405-1.12 | 06/18/2024 | 2 (11/01/2016) | Details CEM-3701 Report | ||
| 211774 | Project ID: 211774 DEA: 010B5404 EFIS: 0112000136 | 01-MEN-162-13.9,22.7 | REPAIR ROADWAY AND CONSTRUCT WALL | MENDOCINO COUNTY NEAR DOS RIOS AT 1.2 MILES WEST OF MIDDLE FORK EEL RIVER BRIDGE AND AT 2.8 MILES EAST OF SAND BANK CREEK | 10/30/2017 | 1 (09/27/2016) | Details CEM-3701 Report |
| 211775 | Project ID: 211775 DEA: 024E6504 EFIS: 0212000012 | 02-SIS-96-R52.5/88.4 | WIDEN BRIDGES,POLYESTER CONC OVERLAY,COLD PLANE AC PVMT,HMA,GUARDRAIL | SISKIYOU COUNTY NEAR SEIAD VALLEY AT VARIOUS LOCATIONS FROM 0.1 MILE WEST OF THOMPSON CREEK BRIDGE TO 0.2 MILE EAST OF BEAVER CREEK BRIDGE | 01/05/2021 | 1 (08/23/2017) | Details CEM-3701 Report |
| 211776 | Project ID: 211776 DEA: 024F58U4 EFIS: 0215000021 | 02-SIS-5-R57.8/R58.5 | BR STRENGTHENING, BARRIER RAIL, HMA, POLYESTER CONC, APPROACH SLABS | SISKIYOU COUNTY NEAR HORNBROOK FROM KLAMATH RIVER ROAD UNDERCROSSING TO 0.4 MILE NORTH OF KLAMATH RIVER ROAD UNDERCROSSING | 02/14/2019 | 1 (05/09/2017) | Details CEM-3701 Report |
| 211777 | Project ID: 211777 DEA: 04209504 EFIS: 0412000116 | 04-MRN,SON-1-50.2/50.5,0.0/0.2 | REPLACE ESTERO BRIDGE AND REALIGN APPROACHING ROADWAY; Bridge No. 27-0121 | MARIN AND SONOMA COUNTIES NEAR VALLEY FORD FROM 0.4 MILE SOUTH OF ESTERO AMERICANO BRIDGE TO 0.2 MILE NORTH OF ESTERO AMERICANO BRIDGE | 10/21/2019 | 1 (01/17/2017) | Details CEM-3701 Report |
| 211778 | Project ID: 211778 DEA: 04235654 EFIS: 0400000680 | 04-SM-101,114-1.3/2.5,5.0/5.3 | RECONSTRUCT INTERCHANGE | SAN MATEO COUNTY AT VARIOUS LOCATIONS ON ROUTE 101 FROM 0.4 MILE NORTH OF UNIVERSITY AVENUE OVERCROSSING TO 0.6 MILE SOUTH OF HENDERSON UNDERPASS AND ON ROUTE 114 FROM WILLOW ROAD SEPARATION TO NEWBRIDGE STREET | 01/08/2020 | 1 (10/24/2016) | Details CEM-3701 Report |
| 211779 | Project ID: 211779 DEA: 044A6704 | 04-MRN,SON,NAP-1,29,116,128,131,-VARIOUS | INSTALL CURB RAMPS | MARIN, NAPA, SONOMA, AND NAPA COUNTIES AT VARIOUS LOCATION | 10/12/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 211780 | Project ID: 211780 DEA: 07290804 EFIS: 0712000075 | 07-LA-1-2.4/7.2 | CONSTRUCT CURB RAMPS. | LOS ANGELES COUNTY IN LONG BEACH AND SIGNAL HILL FROM SANTIAGO AVENUE TO ROUTE 1/710 SEPARATION | 01/06/2020 | 1 (05/05/2017) | Details CEM-3701 Report |
| 211781 | Project ID: 211781 DEA: 07297404 EFIS: 0713000149 | 07-LA-105,110-6.6R/8.0R&13.2/14.7 | INSTALL SAFETY LIGHTING AT INTERCHANGE | LOS ANGELES COUNTY AT ROUTE 105/110 SEPARATION | 05/26/2022 | 1 (03/22/2017) | Details CEM-3701 Report |
| 211782 | Project ID: 211782 DEA: 07305504 EFIS: 0714000101 | 07-LA-5-13.7/26.7 | CONSTRUCT MIDWEST GUARDRAIL SYSTEM AND CONCRETE BARRIERS. | LOS ANGELES COUNTY AT VARIOUS LOCATIONS FROM ROUTE 710/5 SEPARATION TO ROUTE 134/5 SEPARATION | 09/04/2018 | 1 (03/14/2017) | Details CEM-3701 Report |
