Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 10691-10700 of 18864 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 213569 | Project ID: 213569 DEA: 024F2104 EFIS: 0212000072 | 02-MOD-299-0.5/1.0 | Butte and Ash Creek Bridge Replacement | Construction of Butte Creek Bridge and Ash Creek Bridge on Route 299 at Adin | 11/15/2021 | 1 (06/26/2019) | Details CEM-3701 Report |
| 994849 | Project ID: 994849 DEA: 101J0304 EFIS: 1018000073 MINOR: 10A2485 | 10-SJ-5- | REPLACE & RELOCATE Exist DIRECTION SIGN AND RAMP ADVISORY SPEED AND INSTALL NEW FLASHING BEACON | CONSTRUCTION IN SAN JOAQUIN COUNTY IN LATHROP AT SOUTHBOUND OFF RAMP TO EASTBOUND ROUTE 120 | 1 (06/14/2023) | Details CEM-3701 Report | |
| 995173 | Project ID: 995173 MINOR: 06A2922 | 06-KER-178-R40.6 | Cold plane AC pavement and place HMA (Type A) | Construction in Kern County at Bodfish Maintenance Station | 1 (10/26/2023) | Details CEM-3701 Report | |
| 210784 | Project ID: 210784 DEA: 042G8304 EFIS: 0412000007 | 04-ALA-13-8.8 | CONSTRUCT TWO EARTH-RETAINING STRUCTURES. | CONSTRUCT TWO EARTH-RETAINING STRUCTURES | 12/21/2017 | 1 (09/16/2015) | Details CEM-3701 Report |
| 210888 | Project ID: 210888 DEA: 072750U4 EFIS: 0715000283 | 07-VEN-33,101-0.9/T5.82.3/13.8 | CONSTRUCT STORM WATER TREATMENT BMP. | CONSTRUCT STORM WATER TREATMENT BMP. | 07/23/2019 | 1 (10/15/2015) | Details CEM-3701 Report |
| 212494 | Project ID: 212494 DEA: 044K8404 EFIS: 0417000368 | 04-MRN-1-8.2/8.5 | IN MARIN CNTY, ON ROUTE 1, PM 8.2/8.5, NEAR STINSON BEACH FR 2.3 TO 2.6 MILES NORTH OF MUIR WOODS RD | CONSTRUCT SOLDIER PILE WALL (KP 13.1/13.6) EFA VIA DO | 10/15/2019 | 1 (07/12/2017) | Details CEM-3701 Report |
| 210682 | Project ID: 210682 DEA: 041SS414 EFIS: 0413000228 | 04-ALA-13-4.9 | CONSTRUCT SOLDIER PILE RETAINING WALL AND RECONSTRUCT SHOULDER.. | CONSTRUCT SOLDIER PILE RETAINING WALL AND RECONSTRUCT SHOULDER. | 01/02/2018 | 1 (09/15/2015) | Details CEM-3701 Report |
| 2033 | Project ID: 2033 DEA: 04233794 EFIS: 0400000674 COOP: 042187 | 04-ALA-580-21.04/ 20.91 | BART Dublin/ Pleasanton Pedestrian Bridges and Sign Structure | Construct Pedestrian Overcrossing for associated station | 07/12/2019 | 2 (09/17/2015) | Details CEM-3701 Report |
| 210944 | Project ID: 210944 DEA: 044S1904 EFIS: 0400001215 | 04-SON-116-15.0 | CONSTRUCT PAVEMENT AND SOLDIER PILE WALL | CONSTRUCT PAVEMENT AND SOLDIER PILE WALL | 12/20/2017 | 1 (07/07/2016) | Details CEM-3701 Report |
| 211071 | Project ID: 211071 DEA: 080R9504 EFIS: 0812000218 | 08-RIV-371-70.6/70.9 | CONSTRUCT LEFT TURN LANES | CONSTRUCT LEFT TURN LANES | 07/28/2023 | 1 (05/03/2016) | Details CEM-3701 Report |
