Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 10651-10660 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 995140 | Project ID: 995140 DEA: 09393404 EFIS: 0922000031 MINOR: 09A0930 | 09--14,178,- | Remove and replace pavement markings and signs | Construction on State Highway in Kern County at Various Locations on Routes 14, 178 & 202. | 1 (09/08/2023) | Details CEM-3701 Report | |
| 212322 | Project ID: 212322 DEA: 09371704 EFIS: 0917000038 MINOR: 09A0683 | 09--VAR-VAR | MODIFYING EXISTING ELECTRICAL SYSTEM | CONSTRUCTION ON STATE HIGHWAY IN INYO, MONO AND KERN COUNTIES AT VARIOUS LOCATIONS | 1 (06/24/2021) | Details CEM-3701 Report | |
| 214063 | Project ID: 214063 DEA: 112N0114 EFIS: 1117000156 | 11-IMP-86-R0.0/L8.53 | Microsurfacing, cold plane, place HMA, seal coat and shoulder backing. | CONSTRUCTION ON STATE HIGHWAY IN IMPERIAL COUNTY FROM ROUTE 86/111 SEPARATION NEAR HEBER TO NORTH IMPERIAL AVENUE. | 07/08/2020 | 1 (07/16/2019) | Details CEM-3701 Report |
| 1000474 | Project ID: 1000474 DEA: 061G4104 EFIS: 0623000199 MINOR: 06A3030 | 06-FRE-99-168 | Installation of Accessible Pedestrian Signals (APS) and placement of Bike Lane Markings | CONSTRUCTION ON STATE HIGHWAY IN FRESNO COUNTY AT VARIOUS LOCATIONS. | 1 (08/27/2024) | Details CEM-3701 Report | |
| 1000523 | Project ID: 1000523 DEA: 061G2804 EFIS: 0622000178 MINOR: 06A3082 | 06-FRE-168,180-VAR- | Repair/replace Metering System (RMS). | Construction On State Highway In Fresno County at Various Locations. | 1 (09/03/2024) | Details CEM-3701 Report | |
| 1000499 | Project ID: 1000499 DEA: 071Q0004 EFIS: 7022000133 MINOR: 07A5855 | 07-LA-710-24.9/25.2 | Install chain link railing. | Construction On State Highway In East Los Angeles, on Cesar Chavez Avenue Overcrossing Bridge No. 53-1154. | 1 (09/16/2024) | Details CEM-3701 Report | |
| 1000411 | Project ID: 1000411 DEA: 042Y6604 EFIS: 0423000138 MINOR: 04A6964 | 04-CC-24-R6.67 | Replace Culvert. | Construction on State Highway In Contra Costa County Near Lafayette at First Street Undercrossing. | 1 (12/27/2024) | Details CEM-3701 Report | |
| 994803 | Project ID: 994803 DEA: 043J0704 EFIS: 0415000077 | 04-CC-80-10.1/13.5 | Remove PCC and AC, place PCP and AC Resurfacing. | Construction on State Highway in Contra Costa County in Hercules and Crockett from Route 80/4 separation to 0.1 mile west of Crockett Viaduct. | 10/06/2025 | 1 (05/10/2023) | Details CEM-3701 Report |
| 995132 | Project ID: 995132 DEA: 044W0904 EFIS: 0422000108 MINOR: 04A6689 | 04-ALA-238-1.53 | Install Rectangular Rapid Flashing Beacons (RRFB). | Construction On State Highway In Alameda County, In Fremont Near Niles on Mission Boulvard At Mackintosh Street and Dalgo Road. | 03/18/2025 | 1 (10/31/2023) | Details CEM-3701 Report |
| 214045 | Project ID: 214045 DEA: 041Q0004 EFIS: 0418000194 | 04-ALA-84-10.8/18.0 | Cold plane AC pavement and rubberized hot mix asphalt overlay. | CONSTRUCTION ON STATE HIGHWAY IN ALAMEDA COUNTY IN AND NEAR FREMONT FROM NORTH JUNCTION ROUTE 238 TO SOUTH JUNCTION ROUTE 680. | 12/17/2019 | 1 (06/21/2019) | Details CEM-3701 Report |
