Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 10641-10650 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 208923 | Project ID: 208923 DEA: 071W4805 EFIS: 0712000228 MINOR: 07A3361 | 07-LA-27- | Install Light Weight Overhead Sign Structure | In LA County | 08/27/2018 | 1 (06/10/2013) | Details CEM-3701 Report |
| 208922 | Project ID: 208922 Permit Numbers: 0713NMC0397 | 07-VEN-101-7.834/7.834 | Modify existing NB off-ramp intersection with Wendy Drive and Camino Dos Rios. Widen NB off-ramp 18' for 750'.Modify traffic signals, restripe, replace existing trap channel by extending existing 60" RCP (with 72" RCP) approximately 500', and construct | Wendy Dr./Camino Dos Rios, Thousand Oaks | 07/31/2018 | 1 (06/12/2013) | Details CEM-3701 Report |
| 208921 | Project ID: 208921 DEA: 080N5704 EFIS: 0800000531 | 08-SBD-40-R140.7 | BRIDGE SEISMIC RETROFIT | SAN BERNARDINO COUNTY IN NEEDLES AT ROADRUNNER WASH BRIDGE | 05/29/2014 | 1 (10/11/2013) | Details CEM-3701 Report |
| 208920 | Project ID: 208920 DEA: 080K3104 EFIS: 0800000340 | 08-SBD-95-51.2/51.7 | REALIGN ROADWAY WITH HMA OVER AGGREGATE BASE. | SAN BERNARDINO COUNTY FROM 13.9 MILES NORTH OF HAVASU LAKE ROAD TO 5.5 MILES SOUTH OF ROUTE 40/95 SEPARATION | 02/27/2015 | 1 (10/08/2013) | Details CEM-3701 Report |
| 208919 | Project ID: 208919 DEA: 042A1104 EFIS: 0400000808 | 04-NAP-121-20.2/20.4PM | BRIDGE REMOVAL, BRIDGE REPLACEMENT AND ROADWAY WIDENING. | NAPA COUNTY ABOUT 2 MILES SOUTH OF JUNCTION OF ROUTE 128 AT CAPELL CREEK BRIDGE. | 01/14/2016 | 1 (10/24/2013) | Details CEM-3701 Report |
| 208918 | Project ID: 208918 DEA: 01459704 EFIS: 0100020153 | 01-HUM-101-97.7/100.7 | SEISMIC RETROFIT BRIDGE COLUMNS AND ABUTMENTS, CONST CONCRETE BARRIER. | HUMBOLDT COUNTY IN AND NEAR TRINIDAD FROM 0.3 MILE NORTH OF LITTLE RIVER BRIDGE TO 0.2 MILE NORTH OF SIXTH STREET OC AND AT TRINIDAD ROAD UC | 01/02/2015 | 1 (06/26/2013) | Details CEM-3701 Report |
| 208917 | Project ID: 208917 DEA: 100P7304 EFIS: 1000000194 COOP: 10417 | 10-SJ-99-4.5/5.0 | Interchange Modification | 08/12/2021 | 2 (08/07/2014) | Details CEM-3701 Report | |
| 208916 | Project ID: 208916 EFIS: 1000000296 MINOR: 10A1514 | 10-AMA-12-VAR | SR 12/49 ADA CURB RAMPS INSTALLATION | IN AMADOR, CALAVERAS AND TUOLUMNE COUNTIES AT VARIOUS LOCATIONS | 12/06/2019 | 1 (06/05/2013) | Details CEM-3701 Report |
| 208914 | Project ID: 208914 DEA: 042L7904 EFIS: 0412000136 MINOR: 04A4174 | 04-MRN-1-.89 | Install Solar Powered Vehicle Speed Feedback Sign and Warning Sign | In Marin County on Route 1 about 0.1 mile south of Dolan Avenue | 01/13/2025 | 1 (06/13/2013) | Details CEM-3701 Report |
| 208913 | Project ID: 208913 DEA: 060J3204 EFIS: 0600000169 COOP: 061505 Permit Numbers: 0612NMC0061 0613NDP0456 | 06-MAD--11/11 | Enter upon the State Highway Right-of-way on State Route 99 (SR-99) in Madera at the SR-99/4th Street Overcrossing Bridge (PM 11.0) to set up, maintain, and remove temporary traffic control necessary in order to construct the City of Madera's SR-99/4th St | 205 W. Fourth St., Madera | 08/27/2018 | 2 (10/07/2013) | Details CEM-3701 Report |
