Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 10601-10610 of 19000 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 1002062 | Project ID: 1002062 DEA: 120S5204 EFIS: 1220000085 | 12-ORA-22-R11.2 | Install high friction surface treatment at on-ramp. | 1 (04/02/2026) | Details CEM-3701 Report | ||
| 1000084 | Project ID: 1000084 DEA: 101R5604 EFIS: 1023000177 | 10-CAL,SJ-5,26,99-Var | INSTALL HIGH FRICTION SURFACE TREATMENT AND REPLACE DELINEATION. | CALAVERAS AND SAN JOAQUIN COUNTIES AT VARIOUS LOCATIONS | 12/23/2024 | 1 (01/29/2024) | Details CEM-3701 Report |
| 208905 | Project ID: 208905 DEA: 010C3604 EFIS: 0112000254 | 01-MEN-101-R21.4/R26.1 | INSTALL HIGH FRICTION SURFACE TREATMENT | MENDOCINO COUNTY IN AND NEAR UKIAH AT VARIOUS LOCATIONS FROM 0.2 MILE SOUTH OF ROUTE 253 TO NORTH STATE STREET UNDERCROSSING | 01/30/2015 | 1 (06/26/2013) | Details CEM-3701 Report |
| 993271 | Project ID: 993271 DEA: 11430604 EFIS: 1119000026 | 11-SD-8,805-5.6/17.4 | INSTALL HIGH FRICTION SURFACE TREATMENT | FOR CONSTRUCTION ON STATE HIGHWAY IN SAN DIEGO COUNTY IN SAN DIEGO ON ROUTE 8 AT ROUTE 15/8 SEPARATION AND ON ROUTE 805 AT NORTHBOUND 805 TO EASTBOUND 8 CONNECTOR | 1 (04/08/2022) | Details CEM-3701 Report | |
| 211899 | Project ID: 211899 MINOR: 01A1635 | 01-DN-101- | Install High Canopy for Crescent City Highway Maintenance Station | In Del Norte County | 01/11/2021 | 2 (10/03/2017) | Details CEM-3701 Report |
| 210963 | Project ID: 210963 DEA: 120N78U4 EFIS: 1215000036 | 12-ORA-5,22,57,73,133,405,etc.-VARIOUS | INSTALL HD CCTVS AND MODIFY COMMUNICATION SYSTEM. | INSTALL HD CCTVS AND MODIFY COMMUNICATION SYSTEM. | 06/21/2021 | 1 (08/15/2016) | Details CEM-3701 Report |
| 209845 | Project ID: 209845 DEA: 010C9904 EFIS: 0113000092 MINOR: 01A1478 | 01-DN--27.2/R27.7 | Install Hawk Crosswalk System- INSTALL PEDESTRIAN HYBRID BEACON SYSTEM, ROADSIDE SIGNS, CURB RAMPS, RAISED ISLAND AND PAVEMENT DELINEATION | NEAR CRESCENT CITY FROM BURTCHELL ROAD TO WASHINGTON BOULEVARD OVERCROSSING. | 12/21/2020 | 1 (05/21/2014) | Details CEM-3701 Report |
| 209955 | Project ID: 209955 DEA: 120H0074 EFIS: 1213000146 | 12-ORA-Var- | INSTALL HARDWARE AND SOFTWARE FOR CCTV VIDEO SHARING WITH ALL CITIES | ORANGE COUNTY AT VARIOUS LOCATIONS | 09/09/2016 | NOT VERIFIED | Details CEM-3701 Report |
| 995301 | Project ID: 995301 DEA: 072XA304 EFIS: 0722000361 | 07-LA-10-18.33/18.33 | Install hardened fence, security cameras, replace electronic equipment | 04/24/2024 | 1 (01/22/2024) | Details CEM-3701 Report | |
| 3947 | Project ID: 3947 DEA: 07200804 | 07-LA-170-014.9/020.6 | INSTALL GUARDRAILS, STRIPES | 08/25/2010 | 1 (08/26/2010) | Details CEM-3701 Report |
