Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 10581-10590 of 19000 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 6291 | Project ID: 6291 DEA: 112T0994 EFIS: 1100000756 | 11-SD-15,56-M16.4/M19.5,9.0 | INSTALL HIGHWAY PLANTING AND AUTOMATIC IRRIGATION SYSTEMS. | SAN DIEGO COUNTY IN SAN DIEGO ON ROUTE 15 FROM 0.5 MILE NORTH OF MIRA MESA BOULEVARD UNDERCROSSING TO ROUTE 56/15 SEPARATION AND ON ROUTE 56 AT 56/15 SEPARATION | 03/14/2016 | 1 (03/27/2012) | Details CEM-3701 Report |
| 209998 | Project ID: 209998 DEA: 112T2514 EFIS: 1113000035 | 11-SD-105,170-4.4/5.5 | INSTALL HIGHWAY PLANTING AND AUTOMATIC IRRIGATION SYSTEMS. | SAN DIEGO COUNTY IN CHULA VISTA FROM ORANGE AVENUE OVERCROSSING TO NAPLES STREET UNDERCROSSING | 08/16/2021 | 1 (06/21/2016) | Details CEM-3701 Report |
| 6094 | Project ID: 6094 DEA: 11265004 EFIS: 1100000230 | 11-SD-163-1.7/3.2 | Install Highway Planting And Automatic Irrigation Systems | 1 (07/13/2009) | Details CEM-3701 Report | ||
| 213414 | Project ID: 213414 DEA: 060S4504 EFIS: 0614000155 | 06-KER-99-23.6/24.1,25.6 | INSTALL HIGHWAY LIGHTING. | KERN COUNTY IN BAKERSFIELD FROM BRUNDAGE LANE OVERCROSSING TO PLAM AVENUE AND AT ROUTE 58/99/178 SEPARATION | 06/19/2019 | 1 (09/25/2018) | Details CEM-3701 Report |
| 214200 | Project ID: 214200 DEA: 060W9604 EFIS: 0617000290 MINOR: 06A2540 | 06-TUL-63-R23.6 | Install Highway lighting and type E loop detectors | Tulare COunty in Orosi At Miller Ave | 08/07/2023 | 1 (06/13/2019) | Details CEM-3701 Report |
| 432 | Project ID: 432 DEA: 021C5904 | 02-TRI-299-77.4/85.0 | INSTALL HIGHWAY ADVISORY SIGNS | 12/23/2010 | NOT VERIFIED | Details CEM-3701 Report | |
| 6696 | Project ID: 6696 DEA: 120J3904 EFIS: 1200000272 MINOR: 12A1197 | 12-ORA-5,405-5.6/13.9,2.9 | INSTALL HIGHWAY ADVISORY SIGNS | 09/28/2013 | NOT VERIFIED | Details CEM-3701 Report | |
| 5616 | Project ID: 5616 DEA: 100M0201 MINOR: 10A0910 | 10-SJ-5271- | INSTALL HIGHWAY ADVISORY RADIO SYSTEM AT THE MAINT. YARD | 12/05/2019 | 1 (01/06/2014) | Details CEM-3701 Report | |
| 5730 | Project ID: 5730 DEA: 100Q5101 MINOR: 10A1011 | 10-MPA-120-42.60,43.69 | INSTALL HIGHWAY ADVISORY RADIO SYSTEM | 04/17/2011 | NOT VERIFIED | Details CEM-3701 Report | |
| 995181 | Project ID: 995181 DEA: 101L6304 EFIS: 1020000085 | 10-MER-152-R10.1/13.9 | INSTALL HIGH TENSION MEDIAN BARRIER. | MERCED COUNTY IN AND NEAR SANTA NELLA FROM 0.8 MILE WEST OF GONZAGA ROAD TO 1.6 MILES EAST OF HILLDALE | 12/18/2024 | 1 (10/02/2023) | Details CEM-3701 Report |
