Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 10571-10580 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 4934 | Project ID: 4934 DEA: 080H6204 | 08-SBD-18-20.5 | RESURFACE ASPHALT CONCRETE | IN SAN BERNARDINO COUNTY NEAR RIMFOREST, SKYFOREST AND RUNNINGSPRINGS AT VARIOUS LOCATIONS | 07/29/2010 | 1 (07/29/2010) | Details CEM-3701 Report |
| 4941 | Project ID: 4941 DEA: 080H7004 | 08-SBD-18-32.9 | REPLACE ASPHALT CONCRETE SURFACING | IN SAN BERNARDINO COUNTY NEAR SNOW VALLEY FROM KELLER PEAK ROAD TO 1.4 KM EAST OF SNOW VALLEY | 07/29/2010 | 1 (07/29/2010) | Details CEM-3701 Report |
| 210355 | Project ID: 210355 DEA: 081E2204 EFIS: 0813000190 | 08-SBD-127-3.0/10.537.7/41.47 | COLD RECYCLE IN-PLACE (CIR) EXISTING PAVEMENT AND PLACE HMA-A OVERLAY. | IN SAN BERNARDINO COUNTY ON ROUTE 127 FROM 3.0 MILES NORTH OF ROUTE 15/127 SEPARATION TO 2.3 MILES NORTH OF SILVER LAKE ROAD AND 8.0 MILES NORTH OF SARATOGA SPRINGS ROAD TO SAN BERNARDINO/INYO COUNTY LINE | 01/20/2016 | NOT VERIFIED | Details CEM-3701 Report |
| 5062 | Project ID: 5062 DEA: 080L7704 | 08-SBD-15-13.8 | REMOVE & REPLACE CONCRETE PAVEMENT | IN SAN BERNARDINO COUNTY ON ROUTE 15 FROM LYTLE CREEK BRIDGE TO OAK HILLS | 07/29/2010 | 1 (07/29/2010) | Details CEM-3701 Report |
| 4966 | Project ID: 4966 DEA: 080J1304 | 08-SBD-40-40 | BRIDGE SHORING LANES EB AND WB | IN SAN BERNARDINO COUNTY ON ROUTE 40 AT POSTMILE 80 AND BETWEEN POSTMILE 90 AND POSTMILE 97 | 07/29/2010 | 1 (07/29/2010) | Details CEM-3701 Report |
| 4925 | Project ID: 4925 DEA: 080H4004 | 08-SBD-38-14.8 | REMOVE DEAD AND DYING TREES | IN SAN BERNARDINO COUNTY ON STATE ROUTE 38FROM POST MILE 14.8 TO 59.4 | 07/29/2010 | 1 (07/29/2010) | Details CEM-3701 Report |
| 5019 | Project ID: 5019 DEA: 080K8704 | 08-SBd-18-18.8/25.8 | INSTALL METAL BEAM GUARDRAILING | In San Bernardino County, at various locations, from 1.0 mile North of Rte 18/138 Separation to Kuffel Canyon Road | 07/29/2010 | 1 (07/29/2010) | Details CEM-3701 Report |
| 5053 | Project ID: 5053 DEA: 080L6404 | 08-SBd-40-R85.2/R99.1 | Girder Repair By Installing Shear Pins In Eight Wash Bridges. | In San Bernardino County, From 7.0 Miles East of Kelbaker Rd UC to Clipper Valley Wash Bridge | 07/29/2010 | 1 (07/29/2010) | Details CEM-3701 Report |
| 5104 | Project ID: 5104 DEA: 080M8004 | 08-SBd-15-71.8/73.0 | COLD PLANE ANC OVERLAY AC, INSTALL MBGR AND REPLACE POLYESTER OVERLAY | In San Bernardino County, in Barstow, from 0.1 mile North of L Street UC to 0.2 mile South of 247/15 Separation | 07/29/2010 | 1 (07/29/2010) | Details CEM-3701 Report |
| 4922 | Project ID: 4922 DEA: 080H2824 | 08-SBD-5730- | CONSTRUCT NEW BUILDING FOR THE SOUTHERN REGIONAL LABORATORY | In San Bernardino County, in Fontana, at the Southern Regional Laboratory at 13970 Victoria Street | 11/01/2011 | 1 (01/05/2012) | Details CEM-3701 Report |
