Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 10571-10580 of 18775 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
4934Project ID: 4934
DEA: 080H6204
08-SBD-18-20.5RESURFACE ASPHALT CONCRETEIN SAN BERNARDINO COUNTY NEAR RIMFOREST, SKYFOREST AND RUNNINGSPRINGS AT VARIOUS LOCATIONS07/29/20101 (07/29/2010)Details CEM-3701 Report
4941Project ID: 4941
DEA: 080H7004
08-SBD-18-32.9REPLACE ASPHALT CONCRETE SURFACINGIN SAN BERNARDINO COUNTY NEAR SNOW VALLEY FROM KELLER PEAK ROAD TO 1.4 KM EAST OF SNOW VALLEY07/29/20101 (07/29/2010)Details CEM-3701 Report
210355Project ID: 210355
DEA: 081E2204
EFIS: 0813000190
08-SBD-127-3.0/10.537.7/41.47COLD RECYCLE IN-PLACE (CIR) EXISTING PAVEMENT AND PLACE HMA-A OVERLAY.IN SAN BERNARDINO COUNTY ON ROUTE 127 FROM 3.0 MILES NORTH OF ROUTE 15/127 SEPARATION TO 2.3 MILES NORTH OF SILVER LAKE ROAD AND 8.0 MILES NORTH OF SARATOGA SPRINGS ROAD TO SAN BERNARDINO/INYO COUNTY LINE01/20/2016NOT VERIFIEDDetails CEM-3701 Report
5062Project ID: 5062
DEA: 080L7704
08-SBD-15-13.8REMOVE & REPLACE CONCRETE PAVEMENTIN SAN BERNARDINO COUNTY ON ROUTE 15 FROM LYTLE CREEK BRIDGE TO OAK HILLS07/29/20101 (07/29/2010)Details CEM-3701 Report
4966Project ID: 4966
DEA: 080J1304
08-SBD-40-40BRIDGE SHORING LANES EB AND WBIN SAN BERNARDINO COUNTY ON ROUTE 40 AT POSTMILE 80 AND BETWEEN POSTMILE 90 AND POSTMILE 9707/29/20101 (07/29/2010)Details CEM-3701 Report
4925Project ID: 4925
DEA: 080H4004
08-SBD-38-14.8REMOVE DEAD AND DYING TREESIN SAN BERNARDINO COUNTY ON STATE ROUTE 38FROM POST MILE 14.8 TO 59.407/29/20101 (07/29/2010)Details CEM-3701 Report
5019Project ID: 5019
DEA: 080K8704
08-SBd-18-18.8/25.8INSTALL METAL BEAM GUARDRAILINGIn San Bernardino County, at various locations, from 1.0 mile North of Rte 18/138 Separation to Kuffel Canyon Road07/29/20101 (07/29/2010)Details CEM-3701 Report
5053Project ID: 5053
DEA: 080L6404
08-SBd-40-R85.2/R99.1Girder Repair By Installing Shear Pins In Eight Wash Bridges.In San Bernardino County, From 7.0 Miles East of Kelbaker Rd UC to Clipper Valley Wash Bridge07/29/20101 (07/29/2010)Details CEM-3701 Report
5104Project ID: 5104
DEA: 080M8004
08-SBd-15-71.8/73.0COLD PLANE ANC OVERLAY AC, INSTALL MBGR AND REPLACE POLYESTER OVERLAYIn San Bernardino County, in Barstow, from 0.1 mile North of L Street UC to 0.2 mile South of 247/15 Separation07/29/20101 (07/29/2010)Details CEM-3701 Report
4922Project ID: 4922
DEA: 080H2824
08-SBD-5730-CONSTRUCT NEW BUILDING FOR THE SOUTHERN REGIONAL LABORATORYIn San Bernardino County, in Fontana, at the Southern Regional Laboratory at 13970 Victoria Street11/01/20111 (01/05/2012)Details CEM-3701 Report