Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 10551-10560 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 211607 | Project ID: 211607 DEA: 074P0804 EFIS: 0715000264 MINOR: 07A3974 | 07-LA-10-R2.16 | Install Overhead Sign & Flashing Beacon | 1 (07/28/2016) | Details CEM-3701 Report | ||
| 211608 | Project ID: 211608 Permit Numbers: 0316NRM0160 | 03--- | 01/08/2019 | 1 (10/20/2016) | Details CEM-3701 Report | ||
| 211609 | Project ID: 211609 MINOR: 05A1866 | 05--68,1-VAR | 09/06/2019 | NOT VERIFIED | Details CEM-3701 Report | ||
| 211610 | Project ID: 211610 DEA: 031H0804 MINOR: 03A2435 | 03-YOL-50-2.8 | 12/18/2017 | 1 (09/19/2016) | Details CEM-3701 Report | ||
| 211611 | Project ID: 211611 EFIS: 1013000092 MINOR: 10A1770 | 10--4,26- | Replace Culverts | 12/06/2019 | 1 (08/26/2016) | Details CEM-3701 Report | |
| 211612 | Project ID: 211612 DEA: 031H0704 MINOR: 03A2436 | 03-SAC-50-L0.40/L2.40 | 12/18/2017 | 1 (09/19/2016) | Details CEM-3701 Report | ||
| 211613 | Project ID: 211613 DEA: 010B5204 EFIS: 0112000135 | 01-MEN-128-39.5 | ROADWAY EXCAVATION, CIDH PILES, & TRAFFIC CONTROL TO STABILIZE ROAD. | MENDOCINO COUNTY NEAR YORKVILLE AT 0.7 MILE EAST OF BEEBE CREEK BRIDGE | 08/27/2018 | 1 (09/27/2016) | Details CEM-3701 Report |
| 211614 | Project ID: 211614 DEA: 033C3804 EFIS: 0300000458 | 03-ED-50-75.4/77.3 | HOT MIX ASPHALT, ROADWAY EXCAVATION, AND SIGNAL AND LIGHTING | EL DORADO COUNTY IN SOUTH LAKE TAHOE FROM NORTH JUNCTION ROUTE 89 TO TROUT CREEK BRIDGE | 12/06/2021 | 1 (10/20/2016) | Details CEM-3701 Report |
| 211615 | Project ID: 211615 DEA: 043G0604 EFIS: 0400021256 | 04-SOL-680-R7.7/R7.8 | CULVERT REPLACEMENT | SOLANO COUNTY NEAR FAIRFIELD FROM 0.4 MILE NORTH OF MARSHVIEW ROAD OVERCROSSING TO 1.9 MILES SOUTH OF GOLD HILL ROAD OVERCROSSING | 12/21/2017 | 1 (06/15/2017) | Details CEM-3701 Report |
| 211616 | Project ID: 211616 DEA: 050G0404 EFIS: 0500020020 | 05-SLO,MON-101-63.2/R69.3,R0.0/R1.9 | ROADWAY REHABILITATION AND BRIDGE CONSTRUCTION. | SAN LUIS OBISPO AND MONTERY COUNTIES NEAR PASO ROBLES FROM 0.5 MILE SOUTH OF SAN MARCOS CREEK BRIDGE TO 0.2 MILE SOUTH OF BRADLEY ROAD OVERCROSSING | 10/29/2020 | 1 (09/15/2016) | Details CEM-3701 Report |
