Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 10551-10560 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 209365 | Project ID: 209365 DEA: 11406504 EFIS: 1100020324 | 11-SD-15-R36.8/R40.8 | INSTALL HIGH TENSION CABLE BARRIER, UPGRADE MBGR AND TERMINAL SYSTEMS. | SAN DIEGO COUNTY ABOUT 5 MILES NORTH OF ESCONDIDO FROM 0.2 MILE NORTH OF DEER SPRINGS ROAD OVERCROSSING TO GOPHER CANYON ROAD UNDERCROSSING | 02/03/2015 | 1 (08/04/2014) | Details CEM-3701 Report |
| 213425 | Project ID: 213425 DEA: 010F3804 EFIS: 0115000119 | 01-HUM-101-R93.8/R94.5 | INSTALL HIGH TENSION CABLE BARRIER AND UPGRADE GUARDRAIL | HUM - 101 - R93.8/R94.5 | 07/18/2023 | 1 (08/24/2018) | Details CEM-3701 Report |
| 993135 | Project ID: 993135 DEA: 11430014 EFIS: 1117000116 | 11-SD-5-R55.6/R70.0 | INSTALL HIGH TENSION CABLE BARRIER AND GRADE SLOPES. | SAN DIEGO COUNTY NEAR OCEANSIDE AT VARIOUS LOCATIONS FROM FALLBROOK JUNCTION OVERHEAD TO 1.0 MILE SOUTH OF SAN ONOFRE CREEK BRIDGE | 06/03/2024 | 1 (08/18/2021) | Details CEM-3701 Report |
| 210733 | Project ID: 210733 DEA: 04286804 EFIS: 0413000088 | 04-CC-4,29-R11.0;04-29-R9.1 | INSTALL HIGH SPEED WEIGH IN MOTION SYSTEM | COUNTIES ON VARIOUS ROUTES AND LOCATIONS. | 12/22/2017 | 1 (09/17/2015) | Details CEM-3701 Report |
| 211965 | Project ID: 211965 DEA: 081F9504 | 08-RIV-10-29.6 | INSTALL HIGH FRICTION SURFACE TREATMENT. | RIVERSIDE COUNTY NEAR WHITEWATER AT WESTBOUND ROUTE 62 TO EASTBOUND ROUTE 10 CONNECTOR | 07/31/2018 | 1 (07/31/2018) | Details CEM-3701 Report |
| 994201 | Project ID: 994201 DEA: 07358804 EFIS: 0719000165 | 07-LA-170-R16.6/R19.8 | INSTALL HIGH FRICTION SURFACE TREATMENT. | LOS ANGELES AT VARIOUS LOCATIONS FROM OXNARD STREET NORTHBOUND ON-RAMP TO 0.1 MILE NORTH OF ROSCOE BOULEVARD UNDERCROSSING | 11/25/2025 | 1 (09/20/2022) | Details CEM-3701 Report |
| 1000804 | Project ID: 1000804 DEA: 120S7004 EFIS: 1221000021 | 12-ORA-22-R8.6 | INSTALL HIGH FRICTION SURFACE TREATMENT AT ON-RAMP. | ORANGE COUNTY IN GARDEN GROVE AT 0.2 MILE WEST OF GARDEN GROVE BOULEVARD UNDERCROSSING | 1 (01/23/2025) | Details CEM-3701 Report | |
| 1000084 | Project ID: 1000084 DEA: 101R5604 EFIS: 1023000177 | 10-CAL,SJ-5,26,99-Var | INSTALL HIGH FRICTION SURFACE TREATMENT AND REPLACE DELINEATION. | CALAVERAS AND SAN JOAQUIN COUNTIES AT VARIOUS LOCATIONS | 12/23/2024 | 1 (01/29/2024) | Details CEM-3701 Report |
| 208905 | Project ID: 208905 DEA: 010C3604 EFIS: 0112000254 | 01-MEN-101-R21.4/R26.1 | INSTALL HIGH FRICTION SURFACE TREATMENT | MENDOCINO COUNTY IN AND NEAR UKIAH AT VARIOUS LOCATIONS FROM 0.2 MILE SOUTH OF ROUTE 253 TO NORTH STATE STREET UNDERCROSSING | 01/30/2015 | 1 (06/26/2013) | Details CEM-3701 Report |
| 993271 | Project ID: 993271 DEA: 11430604 EFIS: 1119000026 | 11-SD-8,805-5.6/17.4 | INSTALL HIGH FRICTION SURFACE TREATMENT | FOR CONSTRUCTION ON STATE HIGHWAY IN SAN DIEGO COUNTY IN SAN DIEGO ON ROUTE 8 AT ROUTE 15/8 SEPARATION AND ON ROUTE 805 AT NORTHBOUND 805 TO EASTBOUND 8 CONNECTOR | 1 (04/08/2022) | Details CEM-3701 Report |
