Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 10541-10550 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 209908 | Project ID: 209908 DEA: 043G1604 EFIS: 0412000004 | 04-CC-24-5.2/5.6 | CONSTRUCT MULTI-TIRED SLOPE STRESSING SYSTEM.. | CONTRA COSTA COUNTY IN LAFAYETTE 0.6 MILES WEST OF HAPPY VALLEY ROAD | 12/21/2017 | 1 (11/21/2014) | Details CEM-3701 Report |
| 208779 | Project ID: 208779 DEA: 044G3904 EFIS: 0412000448 | 04-CC-80-10.7 | COLD PLANE AC PAVEMENT, OVERLAY WITH HMA, AND UPGRADE CURB RAMPS. | CONTRA COSTA COUNTY IN HERCULES ON WILLOW AVENUE FROM HAWTHORNE DRIVE TO 0.05 MILES EAST OF THE ON-RAMP TO EASTBOUND ROUTE 80. | 05/09/2014 | 2 (05/09/2014) | Details CEM-3701 Report |
| 1000017 | Project ID: 1000017 DEA: 042Q7004 EFIS: 0419000040 | 04-CC-4-L0.0/R14.3 | REPLACE ASPHALT CONCRETE SURFACING AND INSTALL MGS. | CONTRA COSTA COUNTY IN HERCULES AND CONCORD FROM SAN PABLO AVENUE TO ROUTE 4/242 SEPARATION | 1 (01/08/2024) | Details CEM-3701 Report | |
| 215725 | Project ID: 215725 DEA: 040W7704 EFIS: 0420000291 | 04-CC-680-R0.0/R7.6 | INDIVIDUAL SLAB REPLACEMENT (RSC). | CONTRA COSTA COUNTY IN DANVILLE AND SAN RAMON FROM ALCOSTA BOULEVARD OVERCROSSING TO DIABLO ROAD UNDERCROSSING | 06/29/2023 | 1 (04/29/2021) | Details CEM-3701 Report |
| 214985 | Project ID: 214985 DEA: 04269804 EFIS: 0412000159 | 04-CC-242-R0.0/R1.6 | PRECAST JOINTED CONC PVMT, INDIVIDUAL SLAB REPLACEMENT, HMA & RHMA. | CONTRA COSTA COUNTY IN CONCORD FROM ROUTE 242/680 SEPARATION TO BUCHANAN FIELD VIADUCT | 12/08/2022 | 1 (10/19/2020) | Details CEM-3701 Report |
| 1958 | Project ID: 1958 DEA: 041E9804 | 04-CC-242-2.4/3.2 | COLD PLANE AND PLACE HOT MIX ASPHALT. | CONTRA COSTA COUNTY IN CONCORD FROM 0.3 MILE NORTH OF SOLANO WAY UNDERCROSSING TO 0.2 MILE SOUTH OF ROUTE 4/242 SEPARATION | 06/23/2011 | 1 (09/05/2012) | Details CEM-3701 Report |
| 213003 | Project ID: 213003 DEA: 044G8104 EFIS: 0413000055 | 04-CC-242-R1.6 | STRUCTURE REHABILITATION AND BRIDGE RAILING REPLACEMENT. | CONTRA COSTA COUNTY IN CONCORD AT BUCHANAN FIELD VIADUCT | 02/22/2019 | 1 (03/30/2018) | Details CEM-3701 Report |
| 7733 | Project ID: 7733 DEA: 041G5504 EFIS: 0400020034 | 04-CC-4,80-R15.4/R16.7,7.3/7.6 | INSTALL MBGR AND HMA SURFACING. | CONTRA COSTA COUNTY IN CONCORD AND PINOLE ON ROUTE 4 FROM PORT CHICAGO HIGHWAY UNDERCROSSING AND ON ROUTE 80 FROM 0.3 MILE WEST OF APPIAN WAY OVERCROSSING TO APPIAN WAY OVERCROSSING | 05/09/2014 | 1 (10/29/2012) | Details CEM-3701 Report |
| 7115 | Project ID: 7115 DEA: 041G9404 EFIS: 0400021080 | 04-CC-4-27.3/R29.0 | WIDEN FREEWAY TO 8 LANES, RECONSTRUCT A ST. UC, RET. AND SOUND WALLS | CONTRA COSTA COUNTY IN ANTIOCH FROM THE G STREET OVERCROSSING TO 0.1 MILE EAST OF HILLCREST AVENUE OVERCROSSING | 04/14/2021 | 1 (08/02/2012) | Details CEM-3701 Report |
| 2028 | Project ID: 2028 DEA: 042285E4 EFIS: 0400020039 | 04-CC-4-R26.6/R27.5 | FREEWAY WIDENING FROM 4 LANES TO 8 LANES AND RECONSTRUCT INTERCHANGE | CONTRA COSTA COUNTY IN ANTIOCH FROM 0.3 MILE WEST OF CONTRA LOMA BOULEVARD UNDERCROSSING TO 0.2 MILE EAST OF G STREET OVERCROSSING. | 06/27/2016 | 1 (03/07/2012) | Details CEM-3701 Report |
