Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 10511-10520 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 210620 | Project ID: 210620 EFIS: 1013000197 MINOR: 10A1713 | 10--4- | Drainage System Restoration and HMA Overlay | COPPEROPOLIS | 12/06/2019 | 2 (07/06/2015) | Details CEM-3701 Report |
| 213167 | Project ID: 213167 DEA: 042J0414 EFIS: 0416000382 | 04-CC-4-25.8/28.3 | REPLACEMENT HIGHWAY PLANTING | CONTRA COSTA COUNTY, IN PITTSBURG AND ANTIOCH FROM 0.2 MILE WEST OF SOMERSVILLE ROAD UNDERCROSSING TO 0.1 MILE EAST OF CAVALLO ROAD UNDERCROSSING | 01/13/2023 | 1 (09/16/2019) | Details CEM-3701 Report |
| 212267 | Project ID: 212267 DEA: 044J3404 EFIS: 0415000331 | 04-CC-80-0.0/10.1 | COLD PLANE AND OVERLAY PAVEMENT, INSTALL GUARDRAIL AND CURB RAMPS. | CONTRA COSTA COUNTY, IN AND NEAR RICHMOND, EL CERRITO, SAN PABLO, PINOLE AND HERCULES, FROM ALAMEDA/CONTRA COSTA COUNTY LINE TO ROUTE 80/ 4 SEPARATION | 12/17/2019 | 1 (02/21/2018) | Details CEM-3701 Report |
| 994142 | Project ID: 994142 DEA: 044J9504 EFIS: 0416000026 | 04-CC-4-R30.8/R40.4 | ROADWAY EXCAVATION, TEMPORARY BARRIER, AND HMA PAVING AT MVPS. | CONTRA COSTA COUNTY ON ROUTE 4 AT VARIOUS LOCATIONS FROM 0.4 MILE EAST OF ROUTE 160/4 SEPARATION TO HOFFMAN LANE | 08/21/2023 | 1 (08/08/2022) | Details CEM-3701 Report |
| 212263 | Project ID: 212263 DEA: 041K3604 EFIS: 0416000300 | 04-CC-4-R16.8/R17.8 | REPLACE FAILED CONCRETE PAVEMENT | CONTRA COSTA COUNTY NEAR PITTSBURG FROM WILLOW PASS ROAD UNDERCROSSING TO 1.0 MILE WEST OF WILLOW PASS ROAD UNDERCROSSING (SAN MARCO) | 08/21/2018 | 1 (04/20/2017) | Details CEM-3701 Report |
| 212165 | Project ID: 212165 DEA: 041K0304 EFIS: 0416000181 | 04-CC-4-2.9/3.4 | HM1 - COLD PLANE ASPHALT CONCRETE PAVEMENT, PLACE HMA AND HFST. (HM1) | CONTRA COSTA COUNTY NEAR HERCULES FROM 0.5 MILE WEST OF CHRISTIE ROAD TO CHRISTIE ROAD | 12/21/2017 | 1 (04/20/2017) | Details CEM-3701 Report |
| 2080 | Project ID: 2080 DEA: 04268704 | 04-CC-4-R17.2/R17.6 | REPLACE CONCRETE PAVEMENT. | CONTRA COSTA COUNTY NEAR CONCORD FROM 0.3 MILE TO 0.7 MILE EAST OF WILLOW PASS ROAD UNDERCROSSING. | 11/02/2011 | 1 (09/12/2011) | Details CEM-3701 Report |
| 1721 | Project ID: 1721 DEA: 040G1504 | 04-CC-4-R17.0/R17.8 | Replace culverts and underdrains. | CONTRA COSTA COUNTY NEAR CONCORD FROM 0.1 MILE TO 0.9 MILE EAST OF WILLOW PASS ROAD UNDERCROSSING | 09/08/2011 | 1 (09/05/2012) | Details CEM-3701 Report |
| 215451 | Project ID: 215451 DEA: 043Q9504 EFIS: 0419000286 | 04-CC-4-R38.0/R39.9 | COLD PLANE AC PAVEMENT AND PLACE RHMA-G. | CONTRA COSTA COUNTY NEAR BYRON FROM VASCO ROAD TO SELLERS AVENUE | 11/02/2021 | 1 (03/02/2021) | Details CEM-3701 Report |
| 208663 | Project ID: 208663 DEA: 043E4304 EFIS: 0412000306 | 04-CC-680-R12.7/R17.5 | COLD PLANE EXISTING ASPHALT CONCRETE PAVEMENT AND PLACE HMA-O | CONTRA COSTA COUNTY IN WALNUT CREEK AND PLEASANT HILL FROM RUDGEAR ROAD UNDERCROSSING TO 0.2 MILE SOUTH OF MONUMENT BOULEVARD UNDERCROSSING | 05/09/2014 | 1 (03/26/2013) | Details CEM-3701 Report |
