Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 10501-10510 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 211127 | Project ID: 211127 Permit Numbers: 05146MC0563 05156RT0701 | 05-SLO-41-44.66/45.1 | To provide construction and operations access to the California Flats Solar Project. First Solar will be widening SR41 at Turkey Flat Rd (PM 44.9)to accommodate a northbound left turn lane, a northbound median acceleration lane, and a southbound right turn lane. The geometrics for the left turn lan | Turkey Flat Rd, Cholame | 09/17/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 211128 | Project ID: 211128 DEA: 022H3004 | 02-SIS-96-26.7 | Repair roadway damaged by slide material | About 14 miles west of Happy Camp at 1.1 miles East of Beck Ranch Road | 11/30/2016 | 1 (07/14/2016) | Details CEM-3701 Report |
| 211129 | Project ID: 211129 DEA: 010F9504 | 01-MEN,MEN-1-0./55.0, 0-55 | Remove and dispose of hazard trees | On Route 1 from the Sonoma/Mendocino County line to Caspar Vista Point | 12/21/2020 | 1 (01/03/2017) | Details CEM-3701 Report |
| 211130 | Project ID: 211130 DEA: 074X8004 | 07-VEN-101,1-32.2/34.8,21.5/23.3, VAR | Repair fire damage and protect highways from fire debris flow from Solimar Fire | Route 101 and Route 1 from 0.7 mile north of West Main St Undercrossing to 0.1 mile s=north of Dulah Road Undercrossing | 07/05/2017 | NOT VERIFIED | Details CEM-3701 Report |
| 211131 | Project ID: 211131 DEA: 060V0404 | 06-KER,KER/KIN-5-82.9/85.75/0.0,9.0, VAR | Slab Replacements | In Kern /Kings County near Kettleman City from 9.9 miles N of the Rte 5/46 Jct to 7.6 miles S of the Rte 5/41 Jct. | 04/24/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 211132 | Project ID: 211132 Permit Numbers: 10156MC0300 | 10-SJ-580-13.4 | Install new traffic signals at Interstate 580/Patterson Pass Road Intersection and Interstate 580/Mountain House Parkway intersection in the City of Tracy. Work includes right turn lane and approach taper at I-580/Patterson Pass Road eastbound onramp and shoulder widening on I-580/Mountain House Pa | SR 580, Tracy | 1 (01/22/2016) | Details CEM-3701 Report | |
| 211498 | Project ID: 211498 DEA: 101G5404 | 10-SJ-5-6.3 | Remove abandon 36" irrigation pipe and fill voids | 04/18/2018 | 1 (10/19/2016) | Details CEM-3701 Report | |
| 211133 | Project ID: 211133 DEA: 010E5204 EFIS: 0114000104 | 01-HUM-299-39.1/43.0 | REPLACE AC SURFACING, BONDED WEARING COURSE OVERLAY | REPLACE AC SURFACING, BONDED WEARING COURSE OVERLAY | 08/27/2018 | 1 (09/27/2016) | Details CEM-3701 Report |
| 211134 | Project ID: 211134 DEA: 010E9804 EFIS: 0115000052 | 01-MEN-101-T91.3/R100.1 | RHMA OVERLAY | RHMA OVERLAY | 02/16/2017 | NOT VERIFIED | Details CEM-3701 Report |
| 211135 | Project ID: 211135 DEA: 010F0904 | 01-TRI-299-8.0/15.0 | RHMA OVERLAY | RHMA OVERLAY | 08/29/2017 | 1 (09/27/2016) | Details CEM-3701 Report |
