Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 10501-10510 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 212795 | Project ID: 212795 DEA: 05937704 EFIS: 0514901244 Permit Numbers: 05176UB0132 | 05-MON-68-4.04 | Install a water pipeline bridge including a 36 inch diameter steel casing | County of Monterey | 05/24/2019 | 1 (09/25/2017) | Details CEM-3701 Report |
| 208742 | Project ID: 208742 DEA: 060P9104 EFIS: 0612000307 COOP: 061526A2;061742 | 06-MAD-99,233,Ave26-26.2,26.92/3.58,3.887/3.887,4.31 | Construct Roundabout at Robertson Blvd, at AVE 26 and Widen Overcrossing with bike lane from 2 to 4 lanes | County of Madera | 2 (10/09/2013) | Details CEM-3701 Report | |
| 1000441 | Project ID: 1000441 EFIS: 1124000203 MINOR: 11A3923 | 11-SD-163-3.05 | Cold Plane and Overlay with Rubberized Hot Mix Asphalt. | County In San Diego On Southbound Route 163 At Exit Ramp To Sixth Avenue. | 1 (07/25/2024) | Details CEM-3701 Report | |
| 210733 | Project ID: 210733 DEA: 04286804 EFIS: 0413000088 | 04-CC-4,29-R11.0;04-29-R9.1 | INSTALL HIGH SPEED WEIGH IN MOTION SYSTEM | COUNTIES ON VARIOUS ROUTES AND LOCATIONS. | 12/22/2017 | 1 (09/17/2015) | Details CEM-3701 Report |
| 214953 | Project ID: 214953 DEA: 063HT024 EFIS: 0617000190 | 06-KER-VAR- | The Project consists of 21 miles of trackway for the High?Speed Rail through the counties of Tulare and Kern in the vicinity of Wasco, California. It includes several grade separated crossings, a pedestrian crossing, and a non-standard structure. | Counties of Tulare and Kern at SR43/SR46 | 2 (05/05/2020) | Details CEM-3701 Report | |
| 1614 | Project ID: 1614 DEA: 040A6304 EFIS: 0400000157 | 04-SON-101,116-20.4,56.2 | HWY 116 IMPROVEMENTS | Cotati, CA on the edge of town. | 06/08/2020 | 1 (03/12/2008) | Details CEM-3701 Report |
| 6809 | Project ID: 6809 DEA: 120L9604 EFIS: 1200020253 | 12-ORA-55-16.8/16.9 | Regrade failed slope embankment , geotextile fabric material and revegetate to prevent erosion | Costa Mesa Freeway on Rte 55 | 09/09/2016 | 1 (03/03/2011) | Details CEM-3701 Report |
| 994184 | Project ID: 994184 DEA: 043Q8204 EFIS: 0419000266 COOP: 042804 | 04-ALA-580-R3.9 | Valley Link intends to establish new passenger rail service along a 42-mile corridor | Corridor between existing Dublin/Pleasanton BART Station and the approved North Lathrop Altamont Corridor Express (ACE) Station, in Alameda and San Joaquin Counties | 2 (08/24/2022) | Details CEM-3701 Report | |
| 4741 | Project ID: 4741 EFIS: 0000001155 Permit Numbers: 08086CD0103 | 08-SBD-210-19.5 | Signal & Lighting and RCP | Corner of Riverside Avenue | 06/30/2009 | 2 (06/30/2009) | Details CEM-3701 Report |
| 7555 | Project ID: 7555 EFIS: 0000001155 Permit Numbers: 0712NSN0811 | 07-LA-2-3.481/3.481 | Install conduits,pullboxes and traffic signal equipment Install stub out and Advance Loops on Santa Monica Blvd Install stub out and Actuation Loops on Corinth Ave Install new APS devices Replacing all existing 8"³ vehicle heads to 12 "³vehicle heads per LADOT | Corinth Avenue, Los Angeles | 07/31/2018 | 1 (12/12/2012) | Details CEM-3701 Report |
