Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 10491-10500 of 18775 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
209086Project ID: 209086
DEA: 040J4204
EFIS: 0413000468
04-CC-24-5.9/6.2,0.0/0.3Replace Uninterrupted Power Supply systemIn Ala and CC Counties at Caldecott Tunnel08/21/20181 (08/01/2013)Details CEM-3701 Report
209085Project ID: 209085
DEA: 081E5404
EFIS: 0814000048
08-RIV-18.0,28.3-45Replace MBGR and traffic signs. Stabilized slopesNear Twin Pines from 0.7 mile south of Hurley Flats Road to San Gorgonio Avenue11/21/20131 (10/08/2013)Details CEM-3701 Report
209084Project ID: 209084
DEA: 051C0204
EFIS: 0512000053
MINOR: 05A1618
05-SLO-1-43.2/46.8Concrete Pave Culvert InvertsIN MONTEREY AND SAN LUIS OBISPO COUNTIES ON ROUTE 1 AND 46 AT VARIOUS LOCATIONS PAVE INVERTS08/16/20191 (08/26/2013)Details CEM-3701 Report
209081Project ID: 209081
DEA: 11287904
EFIS: 1100000346
11-SD-4,49-32.8/40.3ADJUST MBGR AND UPGRADE END TREATMENTS.SAN DIEGO COUNTY AT VARIOUS LOCATIONS FROM 1.0 MILE WEST OF COCHERA VIA DRIVE TO 1.0 MILE WEST OF POTRERO VALLEY ROAD04/23/2014NOT VERIFIEDDetails CEM-3701 Report
209080Project ID: 209080
DEA: 11002704
EFIS: 1100000005
11-SD-70,162-R19.9/R21.2,R0.0/R0.7JPCP, WIDEN CONN, CONSTRUCT MBGR, RW, CCTV, AND LIGHTING.SAN DIEGO COUNTY IN SAN DIEGO ON ROUTE 5 FROM 0.1 MILE SOUTH OF ROUTE 8/5 SEPARATION AND OVERHEAD TO 0.3 MILE NORTH OF TECOLOTE CREEK BRIDGE AND ON ROUTE 8 FROM ROUTE 8/5 SEPARATION AND OVERHEAD TO 0.3 MILE EAST OF MORENA BOULEVARD UNDERCROSSING07/13/20161 (07/18/2014)Details CEM-3701 Report
209079Project ID: 209079
DEA: 09351604
EFIS: 0900020081
09-INY-395-45.6/50.3,50.9/52.9COLD IN-PLACE RECYCLED PAVEMENT AND HMA SUPERPAVE OVERLAY.INYO COUNTY NEAR LONE PINE FROM 0.7 MILE SOUTH OF COTTONWOOD ROAD TO 0.8 MILE NORTH OF CARROLL CREEK ROAD AND FROM 1.4 MILES NORTH OF CARROLL CREEK ROAD TO 0.4 MILE SOUTH OF LUBKEN CANYON ROAD08/29/20141 (10/08/2013)Details CEM-3701 Report
209078Project ID: 209078
DEA: 08449104
EFIS: 0800000714
08-RIV-111-1.5REPLACE BRIDGE WITH PRECAST PS I GIRDERS AND CONSTRUCT RW.RIVERSIDE COUNTY 1.5 MILES NORTH OF IMPERIAL COUNTY AT SALT CREEK BRIDGE12/07/20151 (10/08/2013)Details CEM-3701 Report
209077Project ID: 209077
DEA: 080M4504
EFIS: 0800000481
08-SBD-38-R5.2/5.5CONSTRUCT LEFT TURN LANESAN BERNARDINO COUNTY IN MENTONE FROM 0.2 MILE EAST OF AMETHYST STREET TO MOUNTAIN VIEW LANE10/21/20141 (10/08/2013)Details CEM-3701 Report
209076Project ID: 209076
DEA: 080K2304
EFIS: 0800000337
08-RIV-10-R57.6/R60.9PAVE SHOULDER WITH RHMA-G, REPLACE CONC SLABS, RAMPS, GRIND CONCRIVERSIDE COUNTY IN AND NEAR COACHELLA FROM SOUTH JUNCTION ROUTE 86S TO 0.5 MILE EAST OF COACHELLA CANAL BRIDGE01/29/20151 (10/08/2013)Details CEM-3701 Report
209075Project ID: 209075
DEA: 074T5704
EFIS: 0712000121
07-LA-105-R0.5PLACE HIGH FRICTION SURFACE TREATMENT AND INSTALL OVERHEAD SIGN.LOS ANGELES COUNTY IN LOS ANGELES AT S1/E105 CONNECTOR SEPARATION08/31/20151 (01/09/2014)Details CEM-3701 Report