Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 10491-10500 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 2597 | Project ID: 2597 DEA: 050K3204 | 05-SCr-17-16.2/18.2 | OVERLAY ROADBE, CONSTUCT RETAINING WALLS AND CONCRETE MEDIAN BARRIER | 04/20/2011 | 1 (04/20/2011) | Details CEM-3701 Report | |
| 2848 | Project ID: 2848 DEA: 050R7704 | 05-SLO-101-58.9/63.6 | OVERLAY ROADBED WITH RUBBERIZED HMA | In San Luis Obispo County in and near Paso Robles from North Paso Robles overhead to San Marcos Creek Bridge | 04/20/2011 | 1 (04/20/2011) | Details CEM-3701 Report |
| 212132 | Project ID: 212132 DEA: 051G6504 | 05-MON,SBT-146-1.5/10.1,10.1/10.2 | OVERLAY ROADBED WITH RUBBERIZED HOT MIX ASPHALT - GAP GRADED | MONTEREY AND SAN BENITO COUNTIES NEAR SOLEDAD FROM 0.1 MILE EAST OF RUBION DRIVE TO WEST BOUNDARY PINNACLES NATIONAL PARK | 08/22/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 4912 | Project ID: 4912 DEA: 080G6804 | 08-SBD-395-395 | OVERLAY ROADWAY | IN SAN BERNARDINO COUNTY IN HESPERIA AND VICTORVILLE AT VARIOUS LOCATIONS | 07/29/2010 | 1 (07/29/2010) | Details CEM-3701 Report |
| 208698 | Project ID: 208698 DEA: 060P9304 EFIS: 0612000309 | 06-FRE-63,180-3.8/8.4,79.3/104.1 | OVERLAY ROADWAY AND REPAIR FAILED AREAS. | FRESNO COUNTY AT SQUAW VALLEY AND DUNLAP ON ROUTE 63 FROM 1.2 MILE SOUTH OF ANCHOR AVENUE TO ROUTE 180 AND ON ROUTE 180 FROM FRIANT KERN CANAL BRIDGE TO MILLWOOD ROAD | 10/08/2014 | 1 (08/22/2013) | Details CEM-3701 Report |
| 5350 | Project ID: 5350 DEA: 09258014 | 09-INY-395-186.6/R197.0 | OVERLAY ROADWAY TO HMNA AND WIDENING SHOULDER | In Inyo County, near Bishop, from Barlow Lane to 0.1 KM East of Pleasant Valley Dam Rd | 07/29/2010 | 1 (07/29/2010) | Details CEM-3701 Report |
| 3452 | Project ID: 3452 DEA: 06448004 COOP: 060267 | 06-TUL-63-19.8 | OVERLAY ROADWAY WITH ASPHALT CONCRETE AND RUBBERIZED ASPHALT CONCRETE | 04/21/2011 | NOT VERIFIED | Details CEM-3701 Report | |
| 1061 | Project ID: 1061 DEA: 032M6104 | 03-ED-50-38.6/39.7 | Overlay roadway with asphalt concrete with verglimit additive. | 03/22/2011 | 1 (03/22/2011) | Details CEM-3701 Report | |
| 6702 | Project ID: 6702 DEA: 120J5204 | 12-ORA-405-13.9 | OVERLAY ROADWAY WITH HOT MIX ASPHALT AND INSTALL ELECTROLIERS | 07/28/2010 | 1 (07/28/2010) | Details CEM-3701 Report | |
| 2849 | Project ID: 2849 DEA: 050R7804 | 05-MON-101-98.8/101.3 | OVERLAY ROADWAY WITH RUBBERIZED HMA | 04/20/2011 | 1 (04/20/2011) | Details CEM-3701 Report |
