Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 10481-10490 of 18865 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 159 | Project ID: 159 DEA: 01464104 | 01-DN-101,197,199-Var | Reconstruct metal beam guard railing | DEL NORTE COUNTY AT VARIOUS LOCATIONS | 12/10/2012 | NOT VERIFIED | Details CEM-3701 Report |
| 211221 | Project ID: 211221 DEA: 010A1004 EFIS: 0112000023 | 01-DN-101-VAR | BRIDGE SEISMIC RETROFIT AND CLEAN AND PAINT BRIDGE. | DEL NORTE COUNTY AT VARIOUS LOCATIONS | 10/30/2017 | 1 (03/28/2016) | Details CEM-3701 Report |
| 215679 | Project ID: 215679 DEA: 010J8604 EFIS: 0119000116 | 01-DN-101,199-VAR | FURNISH AND PLACE POLYESTER CONCRETE OVERLAY ON THE BRIDGE DECKS. | DEL NORTE COUNTY AT VARIOUS LOCATIONS | 10/20/2022 | 1 (04/28/2021) | Details CEM-3701 Report |
| 1001640 | Project ID: 1001640 DEA: 010N2904 EFIS: 0123000202 | 01-DN-197,199-Var | REPLACE BRIDGE, EXCAVATION, AND RETAINING WALLS. | DEL NORTE COUNTY AT VARIOUS LOCATIONS | 1 (09/22/2025) | Details CEM-3701 Report | |
| 210293 | Project ID: 210293 DEA: 010E4404 EFIS: 0114000068 | 01-DN-101-35.7/39.9 | COLD PLANE AC PAVEMENT, HMA OVERLAY, RUMBLE STRIPS, DIKES, STRIPING | DEL NORTE COUNTY AT SMITH RIVER FROM SMITH RIVER OVERFLOW TO 0.2 MILE NORTH OF ROWDY CREEK BRIDGE | 06/29/2018 | 1 (09/23/2015) | Details CEM-3701 Report |
| 7393 | Project ID: 7393 DEA: 01465304 EFIS: 0100000673 | 01-DN-101-R5.3 | CONSTRUCT ROADSIDE PARK | DEL NORTE COUNTY AT KLAMATH 1.5 MILES NORTH OF 101/169 SEPARATION | 04/25/2013 | 1 (09/05/2012) | Details CEM-3701 Report |
| 209029 | Project ID: 209029 DEA: 01479404 EFIS: 0100000371 | 01-DN-199-20.3/25.9 | WIDEN SHOULDERS WITH HMA OVER AB, REPLACE BRIDGE AND CONST RET WALLS. | DEL NORTE COUNTY ABOUT 7 MILES NORTH OF GASQUET AT VARIOUS LOCATIONS FROM 0.5 MILE NORTH OF MIDDLE FORK SMITH RIVER BRIDGE 01-0019 TO 0.8 MILE NORTH OF MIDDLE FORK SMITH RIVER BRIDGE 01-0016 | 04/28/2016 | 1 (10/07/2013) | Details CEM-3701 Report |
| 309 | Project ID: 309 DEA: 01489004 | 01-DN-199-33.5/33.9 | CLEAN AND PAINT TUNNEL | DEL NORTE COUNTY ABOUT 3 MILES SOUTH OF THE OREGON BORDER AT THE RANDOLPH COLLIER TUNNEL | 12/10/2012 | NOT VERIFIED | Details CEM-3701 Report |
| 215548 | Project ID: 215548 DEA: 010F4304 EFIS: 0116000005 | 01-DN-199-33.5/33.9 | Collier Tunnel Electrical Upgrade (Building Work, Temporary Signal & Traffic Control Station System) | DEL NORTE COUNTY ABOUT 20 MILES NORTH OF GASQUET FROM RANDOLPH COLLIER TUNNEL TO 2.5 MILES SOUTH OF THE OREGON STATE LINE | 07/25/2023 | 1 (03/18/2021) | Details CEM-3701 Report |
| 1001370 | Project ID: 1001370 DEA: 010K9504 EFIS: 0121000034 | 01-DN-101-15.6/16.2 | PLACE ROADWAY SECTION, INSTALL GUARDRAIL, & EXCAVATE EXISTING ROADWAY. | DEL NORTE COUNTY ABOUT 10.0 MILES SOUTH OF CRESCENT CITY FROM 3.0 MILES NORTH TO 3.6 MILES NORTH OF WILSON CREEK BRIDGE | 1 (07/08/2025) | Details CEM-3701 Report |
