Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 10441-10450 of 18775 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
209137Project ID: 209137
DEA: 050T9704
EFIS: 0500020226
05-SB-246-33.2/33.5CONSTRUCT LEFT TURN CHANNELIZATION.SANTA BARBARA COUNTY AT SANTA YNEZ FROM 0.1 MILE EAST OF EDISON STREET TO 0.1 MILE EAST OF MEADOWVALE LANE08/04/2015NOT VERIFIEDDetails CEM-3701 Report
209136Project ID: 209136
Permit Numbers: 10136AS0552 10136UL0553
10-TUO-108-11.3/11.3To construct, operate, and maintain, an unmanned wireless communications facility.SR 108, Twain Harte09/21/20182 (08/07/2014)Details CEM-3701 Report
209135Project ID: 209135
DEA: 04235844
EFIS: 0400000684
COOP: 042493
04-SM-101-16.3/17.06RECONSTRUCT OVERCROSSING, RETAINING WALLS, GROUND IMPROVEMENT,BURLINGAME12/17/20191 (10/03/2013)Details CEM-3701 Report
209134Project ID: 209134
Permit Numbers: 0412NMC0133 0413NRW0393
04-SM-82--1/-1At street intersections and highway ramp intersections, install cabinets, conduit in trenches, and pull fiber optic cable for communication system.Var, Var08/21/2018NOT VERIFIEDDetails CEM-3701 Report
209133Project ID: 209133
EFIS: 1100000456
Permit Numbers: 1113NMC0412
11-SD-15-27.23/27.23enter upon State Highway right of way in San Diego County, City of Escondido, on Route 15, post mile M27.23, to install and operate a Level 2 and a DC fast charger Electric Vehicle Charge Station, as shown on the attached plans, in accordance with the requiredINTERSTATE 15, SAN DIEGO08/01/2018NOT VERIFIEDDetails CEM-3701 Report
209132Project ID: 209132
Permit Numbers: 0412NMC0330
04-MRN-101-18.1/20.2Install pedestrian and transit improvements at 2 locations(1) Ignacio Blvd. & (2) Rowland Blvd., Novato09/14/20181 (11/06/2013)Details CEM-3701 Report
209131Project ID: 209131
Permit Numbers: 0413NMC0851
04-ALA-580-12.91/12.91Portola Ave Park & Ride lot improvements-Pavement base repair, seal coat lot,lighting,ADA improvement, install bike lockers, reconstruct sidewalk, directional signage, striping.1624 Portola Ave, Livermore09/14/20181 (09/30/2013)Details CEM-3701 Report
209130Project ID: 209130
DEA: 080M4204
EFIS: 0800020127
08-RIV-74-6.9/10.2INSTALL METAL BEAM GUARD RAILINGRIVERSIDE COUNTY NEAR LAKE ELSINORE FROM 0.3 MILE EAST OF EL CARISO CAMP GROUND ROAD TO 1.6 MILES WEST OF GRAND AVENUE05/29/20141 (10/08/2013)Details CEM-3701 Report
209129Project ID: 209129
DEA: 080J0104
EFIS: 0800000278
08-SBD-18-53.5CONSTRUCT LEFT TURN IN BOTH DIRECTIONS, WIDEN SHOULDER WEST BOUNDSAN BERNARDINO COUNTY AT BIG BEAR CITY AT BIG TREE DRIVE09/08/20141 (10/08/2013)Details CEM-3701 Report
209128Project ID: 209128
EFIS: 0613000160
06-FRE-168-L32.5/R36.2CURED-IN-PLACE PIPELINER.FRESNO COUNTY AT VARIOUS LOCATIONS FROM 3.7 MILES WEST OF TOLLHOUSE ROAD/ AUBERRY ROAD TO TOLLHOUSE ROAD/ AUBERRY ROAD01/23/20151 (12/19/2014)Details CEM-3701 Report