Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 10421-10430 of 19149 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 7297 | Project ID: 7297 EFIS: 0000001155 Permit Numbers: 0407NSN0254 | 04-SM-82-16.12/16.12 | Install traffic signal at the intersection of El Camino Real and Victoria Avenue | El Camino Real, Millbrae | 08/31/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 7400 | Project ID: 7400 EFIS: 0000001155 Permit Numbers: 04126DP0508 | 04-SM-82-16.12/16.12 | Install traffic signal at the intersection of El Camino Real and Victoria Avenue | El Camino Real, Millbrae | 09/14/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 7715 | Project ID: 7715 EFIS: 0000001155 Permit Numbers: 0412NRW1341 | 04-SM-82-16.12/16.12 | Install traffic signal at the intersection of El Camino Real and Victoria Avenue | El Camino Real, Millbrae | 08/21/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 2523 | Project ID: 2523 EFIS: 0000001155 Permit Numbers: 05096MC0461 | 05-MON-101-54.78/54.78 | Improve existing ramp intersection with local roadway previous reviewed under permit application numbers 0599 6MC 0323 and 0506 6MC 0020 (Yanks Air Museum Project) | El Camino Real, Greenfield | 09/17/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 209110 | Project ID: 209110 Permit Numbers: 0412NMC1476 | 04-SM-82-13.25/13.25 | The work consists of installing an 8" water main within El Camino Real. | El Camino Real, Burlingame | 09/14/2018 | 1 (09/13/2013) | Details CEM-3701 Report |
| 214954 | Project ID: 214954 Permit Numbers: 0419NUT1922 | 04-SM-82-8.57 | A new 12" HDPE sanitary sewer force force main will be installed within a new 20' HDPE casing pipe on the North Bound lanes of El Camino Real between North Road and middle Road. | El Camino Real, Belmont | 05/01/2023 | 1 (10/26/2020) | Details CEM-3701 Report |
| 211028 | Project ID: 211028 Permit Numbers: 04156DP2674 0415NMC1359 | 04-SM-82-2.2/2.2 | Installation of a pedestrian hybrid beacon (HAWK) system at the intersection of El Camino Real and Almendral Ave. | El CAMINO Real, Atherton | 01/08/2020 | 1 (11/17/2015) | Details CEM-3701 Report |
| 214267 | Project ID: 214267 Permit Numbers: 0417NCS0458 0418NRW2640 04196DP1249 0419NRT2083 04196RT2096 | 04-SM-82-18.3 | New bulb-outs, new pedestrian refuge island, new high visibility crosswalks, new pedestrian push button, replace pedestrian heads, new associated striping, and other minor improvements. | El Camino Real , San Bruno | 08/21/2020 | 1 (07/23/2019) | Details CEM-3701 Report |
| 1585 | Project ID: 1585 EFIS: 0000001155 Permit Numbers: 0409NMC1640 | 04-SM-101-0/0 | (SMCTA) Is initiating an effort to develop a countywide traffic management system comprised of Alternates Routes Plans along several key arterial corridors. | El Camino Real , Concar, Delaware, Hillsdale, San Mateo | 09/14/2018 | 2 (09/02/2014) | Details CEM-3701 Report |
| 211665 | Project ID: 211665 Permit Numbers: 04166DP1437 04156MC0184 | 04-SCL-82-21.8/21.8 | Merlone Geier Management,LLC ( MGP IX SAC II Properties,LLC)proposes to reconstruct the median currently currently existing along San Antonio Road from 250' south of El Camino Real to San Antonio Circle. | El Camino Real (HWY 82 ) San Antonio Rd, Mountain View | 01/18/2019 | 1 (08/30/2016) | Details CEM-3701 Report |
