Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 10391-10400 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 102 | Project ID: 102 DEA: 01438404 | 01-HUM-101-58.8/70.0 | INSTALL MEDIAN BARRIER | IN HUMBOLDT COUNTY IN AND NEARFORTUNA AT VARIOUS LOCATIONS | 11/19/2010 | 1 (08/18/2008) | Details CEM-3701 Report |
| 547 | Project ID: 547 DEA: 022E2404 | 02-SHA-5-R8.5/R11.3 | INSTALL MEDIAN BARRIER | SHASTA COUNTY IN AND NEAR REDDING FROM 1.3 MILES SOUTH OF KNIGHTON ROAD OVERCROSSING TO 0.5 MILE NORTH OF SMITH ROAD OVERCROSSING | 12/04/2012 | 1 (04/26/2011) | Details CEM-3701 Report |
| 712 | Project ID: 712 DEA: 024C9904 | 02-SHA-5-R4.2/R8.5,R12.1/R16.2 | INSTALL MEDIAN BARRIER | IN Shasta County on Route 5 | 03/11/2011 | 1 (12/14/2009) | Details CEM-3701 Report |
| 4957 | Project ID: 4957 DEA: 080H9904 | 08-RIV-10-R52.3/R57.0 | INSTALL MEDIAN BARRIER | 07/29/2010 | 1 (07/29/2010) | Details CEM-3701 Report | |
| 6155 | Project ID: 6155 DEA: 11280604 | 11-SD-52-12.4 | INSTALL MEDIAN BARRIER | IN SAN DIEGO COUNTY IN SAN DIEGOFROM SPRING CANYON ROAD UNDERCROSSING TO MAST BOULEVARD UNDERCROSSING | 08/02/2010 | 1 (08/02/2010) | Details CEM-3701 Report |
| 5424 | Project ID: 5424 DEA: 09340104 MINOR: 09A0370 | 09-MON-120-R2.4/R12.0 | INSTALL MBGR,TERMINAL SYSTEM AND ALT IN LINE SYSTEM | 120 | 06/01/2009 | NOT VERIFIED | Details CEM-3701 Report |
| 4101 | Project ID: 4101 MINOR: 07A2507 | 07-LA-5-8.18 | INSTALL MBGR, REPLACE ECISTING AC DIKE W/ TYPE F& C DIKE ; CONSTRUCT VEGETATION CONTROL CONCRETE PAVEMENT | 01/28/2013 | 1 (01/28/2013) | Details CEM-3701 Report | |
| 208929 | Project ID: 208929 DEA: 120L3404 EFIS: 1200020339 MINOR: 12A1473 | 12-ORA-57-14.9 | INSTALL MBGR, PAVE MISCELLANEOUS ASPHALT SHOULDER, AND REPLACE THE OVERHEAD DIRECTIONAL EXIT SIGN | ON ROUTE 57 SB OFF-RAMP TO LINCOLN AVE. (PM 14.9), IN ANAHEIM CITY | 09/09/2016 | 1 (06/19/2013) | Details CEM-3701 Report |
| 2681 | Project ID: 2681 DEA: 050M8004 | 05-SB-101-41.0/47.3 | INSTALL MBGR, END TREATMENT AND CRASH CUSHION | 08/10/2010 | 1 (08/10/2010) | Details CEM-3701 Report | |
| 8143 | Project ID: 8143 DEA: 07266104 EFIS: 0700020412 | 07-LA-134-0.1/13.3 | INSTALL MBGR, CRASH CUSHIONS AND END TREATMENTS. | LOS ANGELES COUNTY AT VARIOUS LOCATIONS FROM 0.1 MILE EAST OF ROUTE 101/134 SEPARATION TO 0.2 MILE EAST OF ORANGE GROVE BOULEVARD OVERCROSSING | 01/15/2018 | 1 (12/10/2012) | Details CEM-3701 Report |
