Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 10381-10390 of 18865 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 213566 | Project ID: 213566 DEA: 04013574 EFIS: 0416000287 | 04--- | E4-E18 Marine Foundation Removal | 08/22/2018 | 1 (08/22/2018) | Details CEM-3701 Report | |
| 213567 | Project ID: 213567 DEA: 120P7504 EFIS: 1216000012 MINOR: 12A1738 | 12-ORA-1,133-5.5,.04 | Add and reconstruct ADA curb ramps on the NW and NE corners of the intersection of South Pacific Coast Highway (PCH). Construct new sidewalk, relocate a Type 1-A signal pole and controller cabinet on the NW Corner of the intersection to provide a four foot sidewalk clear width per ADA standards. Rec | 07/01/2024 | 1 (01/03/2019) | Details CEM-3701 Report | |
| 213568 | Project ID: 213568 DEA: 034H6904 EFIS: 0319000026 | 03-SAC,SAC/SOL-12-0-0.4/26.3-26.4, 0.0-0.4/26.3-26.4 | Major Damage Restoration (Emergency Opening) | 08/28/2023 | 1 (08/24/2018) | Details CEM-3701 Report | |
| 213569 | Project ID: 213569 DEA: 024F2104 EFIS: 0212000072 | 02-MOD-299-0.5/1.0 | Butte and Ash Creek Bridge Replacement | Construction of Butte Creek Bridge and Ash Creek Bridge on Route 299 at Adin | 11/15/2021 | 1 (06/26/2019) | Details CEM-3701 Report |
| 213570 | Project ID: 213570 DEA: 033F5504 EFIS: 0313000137 | 03-YOL,SAC-275-13.0,0.0 | REPLACE TIMBER FENDER SYSTEM SURROUNDING PIERS 6 AND 7 | YOLO AND SACRAMENTO COUNTIES IN WEST SACRAMENTO AND SACRAMENTO AT SACRAMENTO RIVER BRIDGE. | 06/21/2022 | 1 (01/08/2019) | Details CEM-3701 Report |
| 213571 | Project ID: 213571 DEA: 042J4404 EFIS: 0414000515 | 04-ALA-92-R4.1/R5.5 | CONCRETE MEDIAN BARRIER, MEDIAN LIGHTING AND MGS RAILING | ALAMEDA COUNTY FROM 0.4 MILE WEST OF CLAWATER ROAD OVERCROSSING TO 0.3 MILE WEST OF HESPERIAN BLVD OVERCROSSING | 01/21/2021 | 1 (03/19/2019) | Details CEM-3701 Report |
| 213572 | Project ID: 213572 DEA: 042J6704 EFIS: 0414000544 | 04-ALA-238-14.5/16.5 | HIGHWAY LIGHTING | ALAMEDA COUNTY IN SAN LORENZO FROM 0.42 MILE WEST OF HESPERIAN BOULEVARD UNDERCROSSING TO 0.52 MILE EAST OF MISSION BOULEVARD UNDERCROSSING | 03/12/2020 | 1 (05/06/2019) | Details CEM-3701 Report |
| 213573 | Project ID: 213573 DEA: 11416604 EFIS: 1113000090 | 11-SD-94-29.4/29.7 | REALIGN ROADWAY, HMA PAVING, HFST, DRAINAGE WORK | SAN DIEGO COUNTY NEAR DULZURA FROM 0.3 MILE EAST OF GRANDE CREEK BRIDGE TO 0.1 MILE WEST OF MARRON VALLEY ROAD | 08/24/2021 | 1 (03/01/2019) | Details CEM-3701 Report |
| 213576 | Project ID: 213576 DEA: 120Q6004 EFIS: 1217000069 MINOR: 12A1733 | 12-ORA-5-1.84 | Install additional lighting to improve safety during dark hours | CITY OF SAN CLEMENTE ON FREEWAY 5 ON-RAMP FROM EL CAMINO REAL AND ALSO AT THE EL CAMINO REAL UNDERCROSSING IN ORANGE COUNTY. | 07/02/2024 | 1 (09/10/2018) | Details CEM-3701 Report |
| 213577 | Project ID: 213577 DEA: 56930713 EFIS: 0016000324 MINOR: 02A1726 | 56-SHA-- | Brine Tank Project- Installation of Salt Brine Making System and relocation of storage tank. | Mount Shasta Maintenance Station 1625 Mott Road MT Shasta, CA 96067 | 08/11/2023 | 1 (09/04/2018) | Details CEM-3701 Report |
