Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 10381-10390 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 994038 | Project ID: 994038 DEA: 040AC904 EFIS: 0420000099 | 04-ALA/CC-24-5.9-6.2/0.0-0.4 | Install medium voltange electrical geneator systems | 11/30/2023 | 1 (10/14/2022) | Details CEM-3701 Report | |
| 214332 | Project ID: 214332 DEA: 041AA004 EFIS: 0420000001 | 04-SM-1-39.0, 39.00 | Install medium voltage electrical generator system | 05/22/2023 | 1 (09/10/2019) | Details CEM-3701 Report | |
| 250 | Project ID: 250 DEA: 01479504 | 01-HUM-255-.1 | INSTALL MEDIAN ISLAND, LIGHTING AND AC OVERLAY | Humboldt County in Eureka at 3rd Street. | 03/23/2010 | 1 (03/23/2010) | Details CEM-3701 Report |
| 208896 | Project ID: 208896 DEA: 010B1904 EFIS: 0112000109 | 01-HUM-101-54.3/56.8 | INSTALL MEDIAN HIGH TENSION CABLE BARRIER. | HUMBOLDT COUNTY NEAR RIO DELL FROM EEL RIVER BRIDGES TO 0.3 MILE SOUTH OF VAN DUZEN RIVER BRIDGES | 01/30/2015 | 1 (06/26/2013) | Details CEM-3701 Report |
| 210424 | Project ID: 210424 DEA: 080R2204 | 08-SBD-18-T8.3/R17.7 | INSTALL MEDIAN DOUBLE THRIE BEAM BARRIER | IN AND NEAR SAN BERNARDINO FROM SIERRA WAY TO ROUTE 18/138 SEPARATION | 11/29/2016 | 1 (10/15/2015) | Details CEM-3701 Report |
| 7417 | Project ID: 7417 DEA: 11298004 EFIS: 1100000415 | 11-SD-94-13.8/14.4 | INSTALL MEDIAN CONCRETE BARRIER AND APPLY SLURRY SEAL. | SAN DIEGO COUNTY NEAR LEMON GROVE FROM VIA MERCADO TO 0.1 MILE EAST OF JAMACHA BOULEVARD | 03/22/2013 | 1 (08/07/2012) | Details CEM-3701 Report |
| 359 | Project ID: 359 DEA: 01499904 EFIS: 0100020107 | 01-MEN-101-19.7/30.8 | INSTALL MEDIAN CABLE BARRIER AND VEGETATION CONTROL (MINOR CONCRETE). | MENDOCINO COUNTY IN AND NEAR UKIAH FROM EL ROBLE ROAD OVERCROSSING TO ROUTE 101/20 SEPARATION | 01/31/2012 | 1 (02/21/2012) | Details CEM-3701 Report |
| 209577 | Project ID: 209577 DEA: 11408504 EFIS: 1100020531 | 11-SD-125-9.7/12.1 | INSTALL MEDIAN BARRIER TYPE STBB. | SAN DIEGO COUNTY NEAR SAN DIEGO AND IN LEMON GROVE FROM ELKELTON PLACE UNDERCROSSING TO TROY STREET OVERCROSSING | 06/13/2016 | 1 (04/08/2015) | Details CEM-3701 Report |
| 208729 | Project ID: 208729 DEA: 080R5804 EFIS: 0812000121 | 08-RIV-10-R15.0/28.5 | INSTALL MEDIAN BARRIER GATE SYSTEM | RIVERSIDE COUNTY AT VARIOUS LOCATIONS FROM 1.1 MILES EAST OF HARGRAVE STREET UNDERCROSSING TO 1.2 MILES WEST OF ROUTE 10/62 SEPARATION | 06/24/2014 | 1 (04/16/2014) | Details CEM-3701 Report |
| 209202 | Project ID: 209202 DEA: 060N2004 EFIS: 0600020447 | 06-MAD-70,162-20.2/22.7 | INSTALL MEDIAN BARRIER AND OVERHEAD SIGNS | MADERA COUNTY IN FAIRMEAD AT VARIOUS LOCATIONS FROM 0.7 MILE SOUTH OF AVENUE 21 1/2 OVERCROSSING TO ROUTE 152 | 12/19/2014 | 1 (03/05/2014) | Details CEM-3701 Report |
