Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 10371-10380 of 19149 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 214965 | Project ID: 214965 DEA: 051F9004 EFIS: 0514000073 | 05-MON,SBT-101-73.0/96.8,0.0/R7.5 | INSTALL MVP, GORE PAVING AND MODIFY LIGHTING SYSTEM. | MONTERREY AND SAN BENITO COUNTIES AT VARIOUS LOCATIONS FROM 4.1 MILES NORTH OF NORTH GONZALES OVERCROSSING TO 0.3 MILE NORTH OF LOMERIAS OVERCROSSING | 08/17/2022 | 1 (08/31/2020) | Details CEM-3701 Report |
| 1976 | Project ID: 1976 DEA: 041L5104 MINOR: 04A2719 | 04-ALA-24-4.5 | INSTALL MULTI LAYER POLYMER CONCRETE OVERLAY ON THE TOP DECK ON BR 34-416 ON RTE 24 | 04/19/2021 | 1 (12/09/2019) | Details CEM-3701 Report | |
| 215499 | Project ID: 215499 DEA: 101C7604 EFIS: 1017000015 | 10-SJ-99-14.4/29.0 | INSTALL MINOR CONCRETE, SLOPE PAVING, AND ROADWAY EXCAVATION. | SAN JOAQUIN AT VARIOUS LOCATIONS FROM 0.3 MILE SOUTH OF ARCH ROAD TO 0.4 MILE NORTH OF SOUTH LODI OVERCROSSING | 06/27/2022 | 1 (03/16/2021) | Details CEM-3701 Report |
| 213513 | Project ID: 213513 DEA: 07296904 EFIS: 0713000112 | 07-LA-210-R18.6/R24.9 | INSTALL MINOR CONCRETE FOR PAVING, INSTALL SIGNS, REMOVE IRRIGATION. | LOS ANGELES COUNTY IN AND NEAR LA CANADA FLINTRIDGE AND PASADENA FROM WALTONIA DRIVE UNDERCROSSING TO ROUTE 134/210 SEPARATION | 11/04/2019 | NOT VERIFIED | Details CEM-3701 Report |
| 210527 | Project ID: 210527 DEA: 041G8504 EFIS: 0400020617 | 04-SM,SOL-92,780-varies | INSTALL MIDWEST GUARDRAIL SYSTEM. | SAN MATEO AND SOLANO COUNTIES AT VARIOUS LOCATIONS | 12/27/2017 | 1 (09/15/2015) | Details CEM-3701 Report |
| 211263 | Project ID: 211263 DEA: 081E9904 EFIS: 0814000142 | 08-SBD-330-32.4/43.8 | INSTALL MIDWEST GUARDRAIL SYSTEM. | SAN BERNARDINO COUNTY AT VARIOUS LOCATIONS FROM 2.7 MILES NORTH OF HIGHLAND AVENUE TO ROUTE 330/ 18 SEPARATION | 04/11/2017 | 1 (09/21/2016) | Details CEM-3701 Report |
| 210842 | Project ID: 210842 EFIS: 0812000206 MINOR: 08A2542 | 08--173-R15.6 | Install Midwest Guardrail System on State Route 173, near Running Springs, in San Bernardino County. | On State Route 173, near Running Springs in San Bernardino County | 12/31/2015 | 1 (10/15/2015) | Details CEM-3701 Report |
| 212365 | Project ID: 212365 DEA: 081E3134 | 08-SBD-15-80.4/174.1 | INSTALL MIDWEST GUARDRAIL SYSTEM AND TERMINAL END TREATMENT. | SAN BERNARDINO COUNTY NEAR BARSTOW, AT VARIOUS LOCATIONS FROM 0.9 MI N/O MERIDIAN RD TO 2.4 MI S/O NIPTON RD OC | 02/25/2020 | 1 (12/31/2018) | Details CEM-3701 Report |
| 1001739 | Project ID: 1001739 DEA: 113A8284 EFIS: 1124000290 MINOR: 11A4157 | 11-SD-78-46.45/46.65 | Install Midwest Guardrail System and End Treatment. | San Diego County On Eastbound Route 78 To Julian. | 1 (11/14/2025) | Details CEM-3701 Report | |
| 212576 | Project ID: 212576 DEA: 080R7804 EFIS: 0812000165 | 08-RIV-74-52.1/62.5,78.7/R92.0 | INSTALL MIDWEST GUARDRAIL SYSTEM (MGS) | RIVERSIDE COUNTY FROM 1.2 MILES WEST OF STRAWBERRY CREEK BRIDGE TO 0.2 MILE WEST OF APPLE CANYON ROAD AND FROM 0.7 MILE EAST OF RIBBONWOOD DRIVE TO 1.3 MILES WEST OF CAHUILLA WAY | 06/23/2021 | 1 (03/20/2018) | Details CEM-3701 Report |
