Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 10371-10380 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 1000679 | Project ID: 1000679 DEA: 071Q5904 EFIS: 0723000120 MINOR: 07A5842 | 07-LA-10-32.5/32.7 | no involvement from OQASI | 1 (10/14/2024) | Details CEM-3701 Report | ||
| 215481 | Project ID: 215481 DEA: 041W6904 EFIS: 0421000074 COOP: 042811 | 04-SCL-85-4.45/20.77 | Noise reduction and/or noise attenuation measures at five (5) locations | Along the State Route 85 (SR 85) corridor | 2 (03/12/2021) | Details CEM-3701 Report | |
| 212571 | Project ID: 212571 DEA: 051F79A4 EFIS: 0514000061 | 05-SB-101-55.9/R56.2 | Nojoqui Creek Bridge (51-0018 L/R) widening and rail replacement. | IN SANTA BARBARA COUNTY NEAR BUELLTON AT NOJOQUI CREEK BRIDGE (BR #51-0018 L/R) | 1 (02/20/2020) | Details CEM-3701 Report | |
| 994974 | Project ID: 994974 DEA: 020K2904 EFIS: 0223000133 | 02-SHA-299-14.7/14.17, 14.17/14.17 | Non-destructive testing (NDT) of butt welds (293 ft) in tension in the fracture critical members fabricated from AASHTO M244 Grade 100 (ASTM A514 / A517) steel on the Whiskey Creek Bridge (Br. No. 06-0096). | AT WHISKEY CREEK BRIDGE | 04/01/2025 | 1 (07/14/2023) | Details CEM-3701 Report |
| 994984 | Project ID: 994984 DEA: 034J8704 EFIS: 0323000284 | 03-BUT,BUT,YOL-162,162,80-29.96, R11.31, 29.96,R11.31/29.96,R11.31 | Non-destructive testing of butt welds in tension in the fracture critical members fabricated from AASHTO M244 Grade 100 (ASTM A514 / A517) steel on the Canyon Creek (Bridge No. 12 0184) and the Bryte Bend (Bridge No 22 0026L & R). | The Canyon Creek (Bridge No. 12 0184), on State Route 162, near postmile 29.96, in Butte County. The Bryte Bend (Bridge No 22 0026L & R), on State Route 80, near postmile R11.31, in Yolo County. | 04/01/2025 | 1 (07/18/2023) | Details CEM-3701 Report |
| 1670 | Project ID: 1670 DEA: 040E4804 EFIS: 0400000208 MINOR: 04A3229 | 04-SCL-237-2.9/R4.6 | NON-LANDSCAPE WEED CONTROL | 03/23/2020 | 2 (08/21/2019) | Details CEM-3701 Report | |
| 1669 | Project ID: 1669 DEA: 040E4604 | 04-ALA-580-R28.3/R30.4 | Non-landscaped Weed Control. | 04/20/2011 | 1 (04/20/2011) | Details CEM-3701 Report | |
| 993497 | Project ID: 993497 DEA: 120R0604 EFIS: 1218000027 | 12-ORA-133- | Non-SHOPP PEER SR 133 Venta Spur Overcrossing Improvement Project | 2 (01/05/2022) | Details CEM-3701 Report | ||
| 210939 | Project ID: 210939 DEA: 041J9304 EFIS: 0414000376 Permit Numbers: 0415NMC1977 | 04-SCL-280-8.4/8.9 | Northbound offramp: Widen from 1 to 2 lanes starting from mainline,add a lane at ramp for dual left and right turns onto Wolfe Rd. | Wolfe Road Interchange, Cupertino | 08/22/2018 | 2 (10/08/2015) | Details CEM-3701 Report |
| 212743 | Project ID: 212743 DEA: 030H26U4 EFIS: 0317000247 | 03-PLA-65-R5.0/R6.6 | NORTHBOUND WIDENING AND RAMP IMPROVEMENTS. | PLACER COUNTY IN AND NEAR ROSEVILLE AND ROCKLIN FROM 0.1 MILE SOUTH OF EAST ROSEVILLE VIADUCT TO 0.5 MILE SOUTH OF PLEASANT GROVE BOULEVARD OVERCROSSING | 10/21/2022 | 1 (12/18/2017) | Details CEM-3701 Report |
