Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 10351-10360 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 210945 | Project ID: 210945 DEA: 060T5604 EFIS: 0615000152 | 06-KER-99-8.9/10.7 | COLD PLANE, CRACK SEAL AC PAVEMENT AND RESURFACE WITH RHMA. | COLD PLANE, CRACK SEAL AC PAVEMENT AND RESURFACE WITH RHMA. | 04/24/2018 | 1 (09/27/2016) | Details CEM-3701 Report |
| 210946 | Project ID: 210946 DEA: 060T5904 EFIS: 0615000155 | 06-TUL-137;190-18.2/27.4;26.5/56.6 | PLACE POLYMER ASPHALTIC EMULSION (SEAL COAT). | 04/24/2018 | 1 (10/04/2016) | Details CEM-3701 Report | |
| 210947 | Project ID: 210947 DEA: 07129974 EFIS: 0714000080 | 07-LA-210-18.8/24.9 | INSTALL FIBER OPTICS AND CMS SIGN. | IN LOS ANGELES COUNTY, IN THECITIES OF PASADENA AND LA CANADAFLINTRIDGE, BETWEEN JUNCTIONI-210/SR-134 AND JUNCTION I-210/SR-2 | 05/22/2019 | 1 (02/29/2016) | Details CEM-3701 Report |
| 210948 | Project ID: 210948 DEA: 07287604 EFIS: 0700020928 | 07-LA-101-8.5/9.4 | PLACE CONCRETE BARRIER, RAILING, AND LIGHTING | LA COUNTY FROM BARHAM BOULEVARD OVERCROSSING BRIDGE TO 720 FEET SOUTH OF MULHALLAND DRIVEOVERCROSSING BRIDGE | 08/22/2018 | 1 (03/23/2016) | Details CEM-3701 Report |
| 210949 | Project ID: 210949 DEA: 112M7304 EFIS: 1114000052 | 11-SD-5,8,15,94,125,805,905-var | REPLACE BRIDGE JOINT SEALS, APPLY METHACRYLATE. | IN SAN DIEGO COUNTY AT VARIOUS LOCATIONS: 11-SD-5, 8, 15, 94, 125,805, & 905. | 10/16/2017 | 1 (03/10/2016) | Details CEM-3701 Report |
| 210950 | Project ID: 210950 DEA: 11413304 EFIS: 1114000037 | 11-SD-15-R6.5/R10.9 | PCC REHABILITATION INCLUDING SLAB REPLACEMENT, GRINDING, CURB RAMPS. | IN SAN DIEGO COUNTY IN SAN DIEGOFROM 0.2 MILE SOUTH OF SAN DIEGOMISSION ROAD OC TO 0.3 MILE NORTH OF ROUTE 52/15 SEPARATION | 08/21/2018 | 1 (03/09/2016) | Details CEM-3701 Report |
| 210951 | Project ID: 210951 DEA: 120M3404 EFIS: 1212000017 | 12-ORA-73,133-16.6,4.2 | WIDEN RAMP, CONSTRUCT RW AND DI, AND MODIFY LIGHTING | 06/17/2021 | 1 (03/30/2016) | Details CEM-3701 Report | |
| 210952 | Project ID: 210952 DEA: 120N2204 EFIS: 1213000182 | 12-ORA-5-23.8 | UPGRADE THE EXISTING AUDIO-VISUAL, AND VIDEO WALL SYSTEM | UPGRADE THE EXISTING AUDIO-VISUAL, AND VIDEO WALL SYSTEM | 01/04/2021 | 1 (09/13/2016) | Details CEM-3701 Report |
| 210953 | Project ID: 210953 DEA: 120N3304 EFIS: 1213000197 | 12-ORA-5-12.8/21.6 | SLAB REPLACEMENT (RSC), GRIND & GROOVE CONC PVMT, RHMA-G PVMT | NB & SB RTE 5 FROM NB AVERY PARKWAYGORE POINT (PM 12.8) TO I-5/405 SEPARATION (PM 21.6).ROUTE 5/405 SEPARATION | 08/21/2018 | 1 (08/12/2016) | Details CEM-3701 Report |
| 210954 | Project ID: 210954 DEA: 120N7904 EFIS: 1214000109 | 12-ORA-5,73,91,133,241,etc-VAR | INSTALL AND UPGRADE ITS EQUIPMENT | IN ORANGE COUNTY AT VARIOUS LOCATIONS. | 08/28/2017 | 1 (09/13/2016) | Details CEM-3701 Report |
