Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 10321-10330 of 18775 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
213514Project ID: 213514
DEA: 07330204
EFIS: 0716000212
07-LA-1-6.5INSTALL PROTECTED LEFT-TURN SIGNAL PHASING.LOS ANGELES COUNTY IN LONG BEACH AT PACIFIC AVENUE01/28/20211 (03/20/2019)Details CEM-3701 Report
213515Project ID: 213515
DEA: 101C5404
EFIS: 1015000029
10-TUO-108,120-L0.0/L0.4,11.6/12.2WIDEN INTERSECTION AND INSTALL SIGNAL LIGHTS.TUOLUMNE COUNTY ABOUT 5.8 MILES WEST OF JAMESTOWN ON ROUTE 108 FROM ROUTE 120 TO 0.4 MILE EAST OF ROUTE 120 AND ON ROUTE 120 FROM 0.2 MILE NORTH OF O'BYRNES FERRY ROAD TO 0.1 MILE EAST OF ROUTE 10801/22/20201 (12/20/2018)Details CEM-3701 Report
213516Project ID: 213516
DEA: 101H3414
EFIS: 1018000077
10-SJ-5-R21.4GIRDER REPAIR.SAN JOAQUIN COUNTY AT FRENCH CAMP AT MATHEWS ROAD UNDERCROSSING01/24/20201 (11/01/2018)Details CEM-3701 Report
213517Project ID: 213517
DEA: 112N0124
EFIS: 1117000157
11-SD-8-2.4/R52.5COLDPLANE, RHMA OVERLAY, STRIPING, AND ELECTRICALSAN DIEGO COUNTY AT VARIOUS LOCATIONS FROM ROUTE 8/163 SEPARATION TO 0.5 MILE EAST OF CAMERON STATION UNDERCROSSING03/03/20201 (02/24/2020)Details CEM-3701 Report
213518Project ID: 213518
DEA: 11418004
EFIS: 1114000054
11-SD-94,125-8.3,13.8CONCRETE BARRIER, JPCP, MGS, HFST, CURB RAMPS & APSSAN DIEGO COUNTY IN LEMON GROVE AND LA MESA ON ROUTE 94 AT MASSACHUSETTS AVENUE UNDERCROSSING AND ON ROUTE 125 AT PANORAMA DRIVE UNDERCROSSING02/19/20201 (12/13/2018)Details CEM-3701 Report
213519Project ID: 213519
DEA: 120H0284
EFIS: 1213000143
12-ORA-5-23.2/30.3INSTALL FIBER OPTIC CABLES AND CCTVORANGE COUNTY IN TUSTIN AND IRVINE FROM ROUTE 133/5 SEPARATION TO ROUTE 5/55 SEPARATION10/02/20191 (09/10/2018)Details CEM-3701 Report
213520Project ID: 213520
DEA: 120M9004
EFIS: 1213000017
12-ORA-22-R5.6/R10.9RECHANNELIZE TO ENHANCE TRAFFIC FLOWORANGE COUNTY AT VARIOUS LOCATIONS FROM 0.1 MILE WEST OF BROOKHURST STREET UNDERCROSSING IN GARDEN GROVE TO BEDFORD ROAD OVERCROSSING IN ORANGE09/08/20221 (09/10/2018)Details CEM-3701 Report
213521Project ID: 213521
DEA: 050L7234
EFIS: 0515000099
05-SLO-58-3.08TROUT CREEK BRIDGE REPLACEMENTIN SAN LUIS OBISPO COUNTY ON HWY 58 EAST OF SANTA MARGARITA AT TROUT CREEK BRIDGE (BR NO. 49-0091).08/23/20231 (09/30/2019)Details CEM-3701 Report
213522Project ID: 213522
Permit Numbers: 04156MC1779 04186RW1578 04186DP2478
04-NAP--4.6/4.6Improvements will include roadway excavation.Unlisted, Unlisted02/05/20201 (09/26/2018)Details CEM-3701 Report
213524Project ID: 213524
DEA: 051K2204
EFIS: 0518000139
05-SBT-101-63.4Repair SlipoutIn SB County01/02/2019NOT VERIFIEDDetails CEM-3701 Report