Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 10321-10330 of 18865 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 1214 | Project ID: 1214 DEA: 033M4704 | 03-ED-50-19.4/45.4 | Clean, Repair, and Retrofit Culverts. | EL DORADO COUNTY IN PLACERVILLE AT 0.2 MILE WEST OF SMITH FLAT UNDERCROSSING AND NEAR WHITEHALL AT 1.2 MILES WEST OF 30 MILE STONE TRACT | 12/17/2012 | 1 (05/06/2010) | Details CEM-3701 Report |
| 213443 | Project ID: 213443 DEA: 034F8404 EFIS: 0314000305 | 03-ED-50-70.6 | CONVERT MINOR LEG STOP CONTROLLED T-INTERSECTION INTO 3-LEG ROUNDABOUT | EL DORADO COUNTY IN MEYERS AT THE JUNCTION OF ROUTE 50 AND 89 SOUTH | 10/06/2021 | 1 (01/04/2019) | Details CEM-3701 Report |
| 7282 | Project ID: 7282 DEA: 033E6304 EFIS: 0300000510 | 03-ED-49-9.6/10.1 | PLACE HMA, REPLACE ASPHALT CONCRETE AND REPLACE CULVERTS | EL DORADO COUNTY IN EL DORADO FROM MISSOURI STREET NORTH TO 4.8 MILES SOUTH OF JUNCTION ROUTE 49/50 SEPARATION | 10/01/2014 | 1 (06/26/2012) | Details CEM-3701 Report |
| 209424 | Project ID: 209424 DEA: 031A8424 EFIS: 0300000223 | 03-ED-89-8.6/13.8 | STORM WATER QUALITY IMPROVEMENTS AND OVERLAY | EL DORADO COUNTY IN AND NEAR SOUTH LAKE TAHOE FROM ROUTE 50 TO CASCADE ROAD | 01/12/2017 | 1 (05/20/2014) | Details CEM-3701 Report |
| 7772 | Project ID: 7772 EFIS: 0300000214 | 03-ED-50-73.7/75.4 | PLACE HMA CONCRETE SURFACING AND MODIFY DRAINAGE SYSTEM | EL DORADO COUNTY IN AND NEAR SOUTH LAKE TAHOE FROM 0.1 MILE SOUTH OF AIRPORT ROAD TO ROUTE 50/89 SEPARATION | 01/23/2015 | 1 (12/10/2012) | Details CEM-3701 Report |
| 8234 | Project ID: 8234 DEA: 034M5404 EFIS: 0312000109 | 03-ED-50,193-18.2/18.8,24.7/27.0 | DIGOUTS AND HMA OVERLAY | EL DORADO COUNTY IN AND NEAR PLACERVILLE ON ROUTE 50 FROM CLAY STREET UNDERCROSSING TO EAST OF CARSON ROAD OVERCROSSING AND ON ROUTE 193 FROM SOUTH FORK AMERICAN RIVER BIRDGE TO THE JUNCTION OF ROUTE 49/193 | 08/02/2013 | 1 (08/01/2013) | Details CEM-3701 Report |
| 1247 | Project ID: 1247 DEA: 033M9104 | 03-ED-49-11.9/15.7 | COLD PLANE AC PAVEMENT, PLACE HMA SURFACING, MODIFY SIGNAL LOOPS. | EL DORADO COUNTY IN AND NEAR PLACERVILLE FROM0.1 MILE NORTH OF PLEASANT VALLEY ROAD TO ROUTE 193 | 10/14/2011 | 1 (10/14/2011) | Details CEM-3701 Report |
| 212094 | Project ID: 212094 DEA: 030G5404 EFIS: 0315000243 | 03-ED-50-15.4/18.8 | COLD PLANE AC PAVEMENT AND RHMA-G OVERLAY | EL DORADO COUNTY IN AND NEAR PLACERVILLE FROM WEBER CREEK BRIDGE TO CARSON ROAD OVERCROSSING | 01/08/2019 | 1 (09/18/2017) | Details CEM-3701 Report |
| 215603 | Project ID: 215603 DEA: 032G1004 | 03-ED-49-9.6/14.2 | COLD PLANE AC PAVEMENT AND HMA OVERLAY. | EL DORADO COUNTY IN AND NEAR PLACERVILLE FROM PLEASANT VALLEY ROAD TO 0.2 MILE SOUTH OF GILMORE STREET | 03/02/2022 | 1 (03/29/2021) | Details CEM-3701 Report |
| 214572 | Project ID: 214572 DEA: 034E62U4 EFIS: 0319000068 | 03-ED-50-18.5/24.2 | CONSTRUCT UC, MED BARRIER, DRAINAGE SYSTEMS & HMA OVERLAY. | EL DORADO COUNTY IN AND NEAR PLACERVILLE FROM MOSQUITO ROAD UNDERCROSSING TO SCHNELL SCHOOL ROAD UNDERCROSSING AND FROM 0.2 MILE WEST OF STILL MEADOW ROAD TO 0.2 MILE EAST OF CARSON ROAD | 07/15/2025 | 1 (03/18/2020) | Details CEM-3701 Report |
