Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 10311-10320 of 19149 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 209719 | Project ID: 209719 DEA: 120H9004 EFIS: 1200020233 | 12-ORA-92,82-4.6/5.9 | SLOPE PAVING,NARROW AREA PAVING, VALVE RELOCATION, ACCESS PATHS, MVPS | ORANGE COUNTY IN COSTA MESA FROM BRISTOL STREET UNDERCROSSING TO 0.2 MILE NORTH OF PAULARINO AVENUE OVERCROSSING | 07/22/2015 | 1 (01/06/2016) | Details CEM-3701 Report |
| 209718 | Project ID: 209718 DEA: 11406604 EFIS: 1100020326 | 11-SD-76-R4.2/R7.6 | INSTALL BARRIER, TURN POCKETS, GUARDRAIL AND END TREATMENTS. | SAN DIEGO COUNTY IN OCEANSIDE FROM RANCHO DEL ORO DRIVE TO 0.2 MILE WEST OF MELROSE DRIVE. | 08/05/2016 | 1 (02/03/2015) | Details CEM-3701 Report |
| 209717 | Project ID: 209717 DEA: 11404404 EFIS: 1100020352 | 11-IMP-78,111-R9.2/R14.0,23.5/23.8 | INSTALL SLOPE PAVING, HIGHWAY PLANTING AND IRRIGATION SYSTEMS. | IMPERIAL COUNTY IN AND NEAR BRAWLEY ON ROUTE 78 AT VARIOUS LOCATIONS FROM ROUTE 86 TO 0.1 MILE EAST OF BEST ROAD AND ON OLD ROUTE 111 FROM 0.2 MILE SOUTH TO 0.1 MILE NORTH OF ROUTE 78/111 SEPARATION | 08/16/2021 | 1 (10/29/2014) | Details CEM-3701 Report |
| 209716 | Project ID: 209716 DEA: 041SS054 EFIS: 0400020871 | 04-ALA-580-32.5 | CONSTRUCT SOLDIER PILE RETAINING WALL. | ALAMEDA COUNTY AT CASTRO VALLEY AT WESTBOUND 150TH AVENUE OFF-RAMP | 12/22/2017 | 1 (11/03/2014) | Details CEM-3701 Report |
| 209715 | Project ID: 209715 DEA: 040G7504 EFIS: 0400001990 | 04-SOL-113-R21.8 | CONSTRUCT THRIE BEAM BARRIER. | SOLANO COUNTY NEAR DAVIS AT ROUTE 113/80 SEPARATION. | 06/29/2015 | 1 (07/11/2014) | Details CEM-3701 Report |
| 209714 | Project ID: 209714 DEA: 042L7304 EFIS: 0400021239 MINOR: 04A4458 | 04-MRN-580-2.5/3.0 | Install Metal Beam Guard Rail | In Marin County | 01/13/2025 | 1 (08/19/2019) | Details CEM-3701 Report |
| 209713 | Project ID: 209713 DEA: 032C5904 EFIS: 0300000304 Permit Numbers: 0314AOP0430 0314NRD0542 | 03-PLA-65-10.1/11.2 | Whitney Ranch Parkway Interchange | Whitney Ranch Parkway, Rocklin | 08/30/2018 | 1 (02/25/2014) | Details CEM-3701 Report |
| 209710 | Project ID: 209710 DEA: 010E6904 EFIS: 0114000125 | 01-HUM-- | Repair Slip out | In Humboldt County near McKinley Ville 0.2 mile east of the Junction ,200/101 Separation #4-172 | 08/24/2018 | 1 (08/07/2014) | Details CEM-3701 Report |
| 209709 | Project ID: 209709 EFIS: 1013000067 MINOR: 10A1615 | 10-AMA-88- | Cured in Place Pipelines and Replace Culvert | Highway 88 in Amador County at Various Locations | 12/06/2019 | 1 (07/11/2014) | Details CEM-3701 Report |
| 209708 | Project ID: 209708 DEA: 04235524 EFIS: 0412000496 COOP: 042536,042616 | 04-SM-92,82-R11.2/10.5 | IMPROVEMENTS TO THE STATE ROUTE (SR) 92/EL CAMINO REAL (SR82) INTERCHANGE | IN THE CITY OF SAN MATEO | 02/14/2018 | 1 (10/24/2016) | Details CEM-3701 Report |
