Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 10291-10300 of 18865 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 927 | Project ID: 927 DEA: 031E14U4 | 03-ED-50-66.7/67.8 | RECONSTRUCT CONCRETE BARRIER RAILING AND INSTALL CULVERT LINERS. | EL DORADO COUNTY NEAR MEYERS FROM 0.2 MILE EAST TO 1.3 MILES EAST OF ECHO SUMMIT | 01/24/2012 | 1 (01/24/2012) | Details CEM-3701 Report |
| 212993 | Project ID: 212993 DEA: 033F5304 EFIS: 0313000135 | 03-ED-50-67.3 | ECHO SUMMIT BRIDGE IS A 24-FT WIDE, THREE-SPAN, REINFORCED CONCRETE GIRDER BRIDGE | EL DORADO COUNTY NEAR MEYERS AT ECHO SUMMIT SIDEHILL VIADUCT | 09/20/2022 | 1 (01/08/2019) | Details CEM-3701 Report |
| 1221 | Project ID: 1221 DEA: 033M5504 | 03-ED-50-39.7/57.6 | Bonded Wearing Course And Metal Beam Guard Railing | EL DORADO COUNTY NEAR KYBURZ FROM THE SOUTH FORK AMERICAN RIVER BRIDGE TO 0.2 MILE EAST OF 42 MILE HOMES ROAD | 12/17/2012 | 1 (04/30/2010) | Details CEM-3701 Report |
| 10005 | Project ID: 10005 DEA: 034M0804 EFIS: 0300020069 | 03-ED-50-51.6/53.2 | REHABILITATE CULVERTS | EL DORADO COUNTY NEAR KYBURZ AT VARIOUS LOCATONS FROM 0.3 MILE WEST OF 36 MILE STONE ROAD TO 0.6 MILE WEST OF WRIGHTS LAKE ROAD | 10/08/2014 | NOT VERIFIED | Details CEM-3701 Report |
| 993489 | Project ID: 993489 DEA: 030J7104 EFIS: 0320000005 | 03-ED-50-45.2 | ROADWAY EXCAVATION & INSTALL CONCRETE DRAINAGE INLET. | EL DORADO COUNTY NEAR KYBURZ AT 1.4 MILES EAST OF ALDER CREEK ROAD | 1 (01/05/2022) | Details CEM-3701 Report | |
| 1000248 | Project ID: 1000248 DEA: 032G9404 EFIS: 0323000066 | 03-ED-193-R5.9/R6.4 | INSTALL CURED-IN-PLACE PIPELINERS. | EL DORADO COUNTY NEAR GREENWOOD FROM 0.2 MILE EAST OF PILGRIM COURT TO 0.2 MILE SOUTH OF SLIGER MINE ROAD | 07/22/2025 | 1 (05/08/2024) | Details CEM-3701 Report |
| 1000140 | Project ID: 1000140 DEA: 032G9304 EFIS: 0323000065 | 03-ED-193-R3.5/R5.6 | INSTALL CURED-IN-PLACE PIPELINER & CONCRETE INVERT PAVING. | EL DORADO COUNTY NEAR GREENWOOD AT VARIOUS LOCATIONS FROM 0.3 MILE NORTH OF BRUSH N ROCKS LANE TO 0.2 MILE SOUTH OF PILGRIM COURT | 1 (04/17/2024) | Details CEM-3701 Report | |
| 213183 | Project ID: 213183 DEA: 032F2404 EFIS: 0313000304 | 03-ED-193-R4.2/10.9 | CONSTRUCT TURNOUTS | EL DORADO COUNTY NEAR GREENWOOD AT VARIOUS LOCATIONS FROM 0.1 MILE WEST OF PENOBSCOT ROAD TO 0.2 MILE EAST OF GRAYBAR MINE ROAD | 01/08/2019 | 1 (01/08/2019) | Details CEM-3701 Report |
| 1245 | Project ID: 1245 DEA: 033M8804 | 03-ED-193-12.7/21.7 | REPLACE AC SURFACING, PLACE MODIFIED BINDER SEAL COAT, HOT SCREENINGS. | EL DORADO COUNTY NEAR GEORGETOWN FROM MAIN STREET TO 0.2 MILE SOUTH OF SHOO FLY ROAD | 01/24/2012 | 1 (01/24/2012) | Details CEM-3701 Report |
| 209448 | Project ID: 209448 DEA: 033M9204 EFIS: 0300020533 | 03-ED-193-R6.0/12.7 | COLD IN-PLACE RECYCLING WITH HOT MIX ASPHALT OVERLAY | EL DORADO COUNTY NEAR GEORGETOWN FROM 0.2 MILE WEST OF SLIGER MINE ROAD TO MAIN STREET | 02/06/2015 | 1 (05/20/2014) | Details CEM-3701 Report |
