Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 10281-10290 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 1518 | Project ID: 1518 EFIS: 0000001155 Permit Numbers: 04076UB0197 0407NRW1030 | 04-CC-680-3.765 | INSTALL NEW ELECTRIC CONDUIT IN AN EXISTING 6″ DUCT | 05/04/2011 | NOT VERIFIED | Details CEM-3701 Report | |
| 212920 | Project ID: 212920 Permit Numbers: 10176MC0280 10186DP0026 10186RW0115 | 10---26.7/26.8 | Install new curb, gutter, sidewalk, a commercial driveway approach, and pavement widening along the southwest corner of Pelandale/Claratina/State Route 108 intersection in the City of Modesto. Other works includes a new pedestrian island, traffic signal modification, and a new horizontal drain. All | SR 108, Modesto | 01/22/2020 | 1 (11/28/2017) | Details CEM-3701 Report |
| 6105 | Project ID: 6105 DEA: 11270304 | 11-SD-79-7.5/8.5 | INSTALL NEW CULVERT,UPGRADE CULVEWRTS, REPAIR EROSION | 08/02/2010 | 1 (08/02/2010) | Details CEM-3701 Report | |
| 214476 | Project ID: 214476 Permit Numbers: 05196UT0447 | 05---3.035/-1 | Install new 6-inch PVC sewer lateral to existing commercial building at 33 E. Lake Avenue; remove old 4-inch sewer line. | 33 E. Lake St, Watsonville | 08/23/2021 | 1 (10/15/2019) | Details CEM-3701 Report |
| 213448 | Project ID: 213448 DEA: 07296304 EFIS: 0713000030 | 07-LA-405-R21.5/26.3 | INSTALL MVPS, GATES, LANDSCAPE, AND ELECTRICAL. | LOS ANGELES COUNTY FROM 0.3 MILE NORTH OF LENNOX BOULEVARD UNDERCROSSING TO 0.1 MILE SOUTH OF PORT ROAD UNDERCROSSING IN CULVER CITY | 11/02/2020 | 1 (02/05/2019) | Details CEM-3701 Report |
| 215076 | Project ID: 215076 DEA: 060U7304 EFIS: 0616000028 | 06-TUL-65,190-17.5/22.0,15.0/18.5 | INSTALL MVP, GORE PAVING AND RELOCATE CONTROL SYSTEMS. | TULARE COUNTY IN PORTERVILLE ON ROUTE 65 AT VARIOUS LOCATIONS FROM 0.4 MILE NORTH OF AVENUE 136 TO 0.2 MILE NORTH OF LINDA VISTA AVENUE AND ON ROUTE 190 AT VARIOUS LOCATIONS FROM 0.2 MILE WEST OF ROUTE 65/190 SEPARATION TO BLUE HERON PARKWAY | 10/03/2022 | 1 (07/28/2020) | Details CEM-3701 Report |
| 214965 | Project ID: 214965 DEA: 051F9004 EFIS: 0514000073 | 05-MON,SBT-101-73.0/96.8,0.0/R7.5 | INSTALL MVP, GORE PAVING AND MODIFY LIGHTING SYSTEM. | MONTERREY AND SAN BENITO COUNTIES AT VARIOUS LOCATIONS FROM 4.1 MILES NORTH OF NORTH GONZALES OVERCROSSING TO 0.3 MILE NORTH OF LOMERIAS OVERCROSSING | 08/17/2022 | 1 (08/31/2020) | Details CEM-3701 Report |
| 1976 | Project ID: 1976 DEA: 041L5104 MINOR: 04A2719 | 04-ALA-24-4.5 | INSTALL MULTI LAYER POLYMER CONCRETE OVERLAY ON THE TOP DECK ON BR 34-416 ON RTE 24 | 04/19/2021 | 1 (12/09/2019) | Details CEM-3701 Report | |
| 215499 | Project ID: 215499 DEA: 101C7604 EFIS: 1017000015 | 10-SJ-99-14.4/29.0 | INSTALL MINOR CONCRETE, SLOPE PAVING, AND ROADWAY EXCAVATION. | SAN JOAQUIN AT VARIOUS LOCATIONS FROM 0.3 MILE SOUTH OF ARCH ROAD TO 0.4 MILE NORTH OF SOUTH LODI OVERCROSSING | 06/27/2022 | 1 (03/16/2021) | Details CEM-3701 Report |
| 213513 | Project ID: 213513 DEA: 07296904 EFIS: 0713000112 | 07-LA-210-R18.6/R24.9 | INSTALL MINOR CONCRETE FOR PAVING, INSTALL SIGNS, REMOVE IRRIGATION. | LOS ANGELES COUNTY IN AND NEAR LA CANADA FLINTRIDGE AND PASADENA FROM WALTONIA DRIVE UNDERCROSSING TO ROUTE 134/210 SEPARATION | 11/04/2019 | NOT VERIFIED | Details CEM-3701 Report |
