Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 10261-10270 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 214583 | Project ID: 214583 DEA: 033H9704 EFIS: 0318000115 | 03-ED-50-36.0/36.4 | ABANDON CULVERT AND INSTALL REINFORCED CONCRETE PIPE. | EL DORADO COUNTY NEAR PACIFIC HOUSE FROM 0.5 MILE EAST OF HAZEL VALLEY ROAD TO 0.8 MILE WEST OF BRIDAL VEIL FALLS ROAD | 03/16/2021 | 1 (03/18/2020) | Details CEM-3701 Report |
| 208748 | Project ID: 208748 DEA: 034E5904 EFIS: 0300000711 | 03-ED-49-3.8 | INCREASE SUPERELEVATION OF CURVE | EL DORADO COUNTY NEAR NASHVILLE AT 0.7 MILE NORTH OF UNION MINE ROAD | 02/06/2015 | 1 (09/18/2013) | Details CEM-3701 Report |
| 209289 | Project ID: 209289 EFIS: 0313000070 | 03-ED-89-0.0/8.6 | PLACE A MICROSURFACE LAYER | EL DORADO COUNTY NEAR MEYERS FROM THE ALPINE COUNTY LINE TO SOUTH JUNCTION ROUTE 50 | 01/23/2015 | 1 (02/14/2014) | Details CEM-3701 Report |
| 907 | Project ID: 907 DEA: 031A8414 | 03-ED-89-0.0/8.6 | INSTALL DRAINAGE FACILITIES AND WIDEN WITH HMA OVER CL 2 AB | El Dorado County near Meyers from the Alpine County Line to Route 50/89 Separation. | 01/12/2012 | 1 (01/25/2010) | Details CEM-3701 Report |
| 1001117 | Project ID: 1001117 DEA: 033G4304 EFIS: 0324000127 | 03-ED-89-0.0/8.5 | COLD PLANE AC PVMT AND HMA (TYPE A) OVERLAY. | EL DORADO COUNTY NEAR MEYERS FROM ALPINE COUNTY LINE TO POMO STREET | 1 (04/02/2025) | Details CEM-3701 Report | |
| 927 | Project ID: 927 DEA: 031E14U4 | 03-ED-50-66.7/67.8 | RECONSTRUCT CONCRETE BARRIER RAILING AND INSTALL CULVERT LINERS. | EL DORADO COUNTY NEAR MEYERS FROM 0.2 MILE EAST TO 1.3 MILES EAST OF ECHO SUMMIT | 01/24/2012 | 1 (01/24/2012) | Details CEM-3701 Report |
| 212993 | Project ID: 212993 DEA: 033F5304 EFIS: 0313000135 | 03-ED-50-67.3 | ECHO SUMMIT BRIDGE IS A 24-FT WIDE, THREE-SPAN, REINFORCED CONCRETE GIRDER BRIDGE | EL DORADO COUNTY NEAR MEYERS AT ECHO SUMMIT SIDEHILL VIADUCT | 09/20/2022 | 1 (01/08/2019) | Details CEM-3701 Report |
| 1221 | Project ID: 1221 DEA: 033M5504 | 03-ED-50-39.7/57.6 | Bonded Wearing Course And Metal Beam Guard Railing | EL DORADO COUNTY NEAR KYBURZ FROM THE SOUTH FORK AMERICAN RIVER BRIDGE TO 0.2 MILE EAST OF 42 MILE HOMES ROAD | 12/17/2012 | 1 (04/30/2010) | Details CEM-3701 Report |
| 10005 | Project ID: 10005 DEA: 034M0804 EFIS: 0300020069 | 03-ED-50-51.6/53.2 | REHABILITATE CULVERTS | EL DORADO COUNTY NEAR KYBURZ AT VARIOUS LOCATONS FROM 0.3 MILE WEST OF 36 MILE STONE ROAD TO 0.6 MILE WEST OF WRIGHTS LAKE ROAD | 10/08/2014 | NOT VERIFIED | Details CEM-3701 Report |
| 993489 | Project ID: 993489 DEA: 030J7104 EFIS: 0320000005 | 03-ED-50-45.2 | ROADWAY EXCAVATION & INSTALL CONCRETE DRAINAGE INLET. | EL DORADO COUNTY NEAR KYBURZ AT 1.4 MILES EAST OF ALDER CREEK ROAD | 1 (01/05/2022) | Details CEM-3701 Report |
