Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 10221-10230 of 19149 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 209835 | Project ID: 209835 DEA: 100X3504 EFIS: 1012000217 | 10-AMA,TUO-16,88,120-var | CONSTRUCT RUMBLE STRIPS IN EXISTING AC PAVEMENT. | AMADOR AND TUOLUMNE COUNTIES AT VARIOUS LOCATIONS | 02/23/2016 | 1 (10/28/2014) | Details CEM-3701 Report |
| 209833 | Project ID: 209833 Permit Numbers: 0412NMC1622 | 04-SCL-85-5.9/5.9 | The modification of the northest corner of the NB HWY 85 offramp at Almaden Expressway and adding a fourth lane transitions. | Almaden Expressway, San Jose | 08/21/2018 | 1 (10/06/2014) | Details CEM-3701 Report |
| 209832 | Project ID: 209832 Permit Numbers: 04116MC1661 | 04-SCL-85-5.9/5.9 | The Modification of the northeast corner of the Hwy NB 85 offramp AT Almaden Expressway and associated work consists of asphalt paving,curb and gutter,sidewalk,signal modifications, joint trench and a new riser pole and guy. | Almaden Expressway, San Jose | 09/14/2018 | 1 (10/06/2014) | Details CEM-3701 Report |
| 209830 | Project ID: 209830 Permit Numbers: 07136CD2147 07146RW1793 | 07-LA-72-3.25/3.25 | Demo and remove roadway, drive approaches, curb & gutter, concrete sidewalk, storm drain. Construct 2 new driveway approaches, relocate street light and pull box, install traffic signal, domestic water service, electric service conduits and new gas service lateral.Applying for separate fire hyd | 13806 Whittier Blvd, Whittier | 07/31/2018 | 1 (08/27/2014) | Details CEM-3701 Report |
| 209828 | Project ID: 209828 Permit Numbers: 10146SN0391 10146DP0393 10146DP0401 | 10-AMA-88-22.7/22.7 | Modify existing signal loop and flasher cabinet. | SR 88, Pine Grove | 08/24/2018 | 1 (08/22/2014) | Details CEM-3701 Report |
| 209827 | Project ID: 209827 DEA: 010E7104 EFIS: 0115000002 | 01-DN-101-2.22, 2.22 | Repair culvert and roadway sink | Near Klamath 1.34 miles south of South Bank Road | 09/22/2017 | 1 (12/05/2014) | Details CEM-3701 Report |
| 209826 | Project ID: 209826 DEA: 041J6604 EFIS: 0414000319 | 04-SM-1,001-38.0/38.6 | Install Bay Area Security Enhancement System | Near Pacifica, near Pacifica, at the Tom Lantos Tunnels Br # 35-0330L/R | 12/27/2017 | 1 (09/17/2015) | Details CEM-3701 Report |
| 209825 | Project ID: 209825 DEA: 081F6604 EFIS: 0815000008 | 08-SBD-62,062-124.0/137.0 | Repair Storm Damages | Near Vidal Junction west of Junction Rte 95 to California Arizona border | 07/24/2014 | 1 (07/10/2014) | Details CEM-3701 Report |
| 209823 | Project ID: 209823 DEA: 044H6104 EFIS: 0413000216 COOP: 042551 | 04-CC-680-R16.6/23.7,R18.8/23.2 | Conversion of Interstate 680 (I-680) High Occupancy Vehicle (HOV) Lanes to Express Lanes, | In the southbound direction from south of Marina Vista Road to Treat Boulevard and in the northbound direction from State Route 242 to Marina Vista Road | 05/18/2021 | 2 (02/17/2015) | Details CEM-3701 Report |
| 209821 | Project ID: 209821 Permit Numbers: 0413NMC2279 | 04-SON-101-29.239/29.458 | Slurry seal full road width; upgrade existing pedestrian ramps to ADA COMPLIANT; curb,gutter,sidewalk and median improvements,raised crosswalk; add bike lane each side with re-striping and new signs; traffic improvements. | Old Redwood HWY, Windsor | 09/14/2018 | 1 (08/19/2014) | Details CEM-3701 Report |
